Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.8 LAdmitted-Finance UKHRA BARDHAMAN BARDHAMAN 713363 WEST BENGAL INDIA | BARDHAMAN | BARDHAMAN | WEST BENGAL | 713363 | ₹3.8 L | L1 | Admitted-Finance |
| 2 | Rejected-Technical BITALPUR BAHULA BAHULA BARDHAMAN BARDHAMAN 713322 WEST BENGAL INDIA | PASCHIM BARDHAMAN | WEST BENGAL | 713322 | - | - | Rejected-Technical TC recommendation |
| 3 | Rejected-Technical | - | - | Rejected-Technical TC recommendation |
| Sl No | Description | Qty | Unit | Karmakar Engineering Workshop L1 |
|---|---|---|---|---|
| 1.00Discription of items | ||||
| 2.00 | 1)AKGI Endless haulage with 50HP, 550V motor, bedplate, 22mm x 600-meter haulage rope, reverse forward starter, breaker, LS Unit, 50-meter power cable, tension & return pulley etc. Installed at 7L/0D, R-VIIIB seam, No-1 Incline unit 3 nos of Trolley collection from No-1 incline Underground different site to surface pit top and transport to workshop | 1 | ls | 10,000 ₹10,000 |
| 3.00 | One AKGI Endless haulage with 50HP, 550V motor, bedplate, 22mm x 600-meter haulage rope, reverse forward starter, breaker, LS Unit, 35sqmm x 50-meter power cable etc. transporting from Colliery workshop to No-1 incline surface & loading on trolley & lowering up to pit bottom 28L/0D haulage. | 1 | ls | 27,395 ₹27,395 |
| 4.00 | Same haulage with electrical transporting from No-1 incline 281/OD to 7L/OD stowing panel-8 RVIIIB seam no-1 incline & unloading the same materials | 1 | ls | 29,980 ₹29,980 |
| 5.00 | Same AKGI Endless haulage withn electrical D controller, ACB starter cable etc installation the same at 7L/OD | 1 | ls | 29,980 ₹29,980 |
| 6.00 | Apoprox 600mtr 22mm Haulage rope, Complete set of Return pully & Complete set of Tension pully Transporting from Colliery workshop to No-1 incline surface & loading the same on coal tub & trolley & lowering from surface to no-1 incline Underground 28L/OD & transporting the same from 28L/0D to 7L/OD site & installation of both pulley & 800mtr haulage rope laying from 7L/0D to 7L/10D & splicing the rope with starting the haulage | 1 | ls | 44,985 ₹44,985 |
| 7.00 | 2)Vishwa direct haulage with 50HP, 550V motor, bedplate, 19mm x 350-meter haulage rope, reverse forward starter, breaker, LS Unit, 40-meter power cable etc. installed at 10D/4L-5L, R-VIIIB seam, No-1 incline unit 2 nos of Trolley collection from No-1 incline Underground different site to surface pit top and transport to workshop | 1 | ls | 8,975 ₹8,975 |
| 8.00 | One Vishwa direct haulage with 50HP, 550V motor, bedplate, 19mm x 350-meter haulage rope, reverse forward starter, breaker, LS Unit, 35 sqmm x 40 meter power cable etc transporting from Colliery workshop to No-1 Incline surface & loading on trolley. | 1 | ls | 24,650 ₹24,650 |
| 9.00 | Same haulage complete set with electrical &
Haulage rope lowering from surface to
undreground 28L/OD & transporting from
2SL/OD to proposed stowing panel 5-8 10D/4L-
5L site. | 1 | ls | 26,995 ₹26,995 |
| 10.00 | same haulage with electrical unloading on
trolley & placeing on haulage foundation at
10D/4L-5L & installation the same with starting
after placing of equipment | 1 | ls | 40,500 ₹40,500 |
Tender Value
₹4.5 L
EMD Value
₹5,700
Closing Date
24 Feb 2026, 9:00 amClosed
General Manager Bankola Area
Office of The General Manager Bankola Area, PIN-713363
Installation of 3 (Three) Nos of Haulage in No-1 incline unit of Bankola Colliery
2026_ECL_353093_1
ECL/GM/BA/E TENDER/25-26/ENM/261 Dt 14.02.2026
Open Tender
Electrical and Maintenance Works
30 days
Bankola Colliery
Please refer Tender documents.
4 documents required · 4 mandatory
₹5,700
5 Mar 2026
14 Feb 2026
25 Feb 2026
14 Feb 2026
24 Feb 2026
14 Feb 2026
14 Feb 2026 - 17 Feb 2026
Discription of items
1)AKGI Endless haulage with 50HP, 550V motor, bedplate, 22mm x 600-meter haulage rope, reverse forward starter, breaker, LS Unit, 50-meter power cable, tension & return pulley etc. Installed at 7L/0D, R-VIIIB seam, No-1 Incline unit 3 nos of Trolley collection from No-1 incline Underground different site to surface pit top and transport to workshop
One AKGI Endless haulage with 50HP, 550V motor, bedplate, 22mm x 600-meter haulage rope, reverse forward starter, breaker, LS Unit, 35sqmm x 50-meter power cable etc. transporting from Colliery workshop to No-1 incline surface & loading on trolley & lowering up to pit bottom 28L/0D haulage.
Same haulage with electrical transporting from No-1 incline 281/OD to 7L/OD stowing panel-8 RVIIIB seam no-1 incline & unloading the same materials
Same AKGI Endless haulage withn electrical D controller, ACB starter cable etc installation the same at 7L/OD
Apoprox 600mtr 22mm Haulage rope, Complete set of Return pully & Complete set of Tension pully Transporting from Colliery workshop to No-1 incline surface & loading the same on coal tub & trolley & lowering from surface to no-1 incline Underground 28L/OD & transporting the same from 28L/0D to 7L/OD site & installation of both pulley & 800mtr haulage rope laying from 7L/0D to 7L/10D & splicing the rope with starting the haulage
2)Vishwa direct haulage with 50HP, 550V motor, bedplate, 19mm x 350-meter haulage rope, reverse forward starter, breaker, LS Unit, 40-meter power cable etc. installed at 10D/4L-5L, R-VIIIB seam, No-1 incline unit 2 nos of Trolley collection from No-1 incline Underground different site to surface pit top and transport to workshop
One Vishwa direct haulage with 50HP, 550V motor, bedplate, 19mm x 350-meter haulage rope, reverse forward starter, breaker, LS Unit, 35 sqmm x 40 meter power cable etc transporting from Colliery workshop to No-1 Incline surface & loading on trolley.
Same haulage complete set with electrical & Haulage rope lowering from surface to undreground 28L/OD & transporting from 2SL/OD to proposed stowing panel 5-8 10D/4L- 5L site.
same haulage with electrical unloading on trolley & placeing on haulage foundation at 10D/4L-5L & installation the same with starting after placing of equipment
3).Vishwa direct haulage with 50HP, S50V motor, bedplate, 19mm x 350-meter haulage rope, reverse forward starter, breaker, LS Unit, 40-meter power cable etc. installed at 4D/5L-6L, R-VIIIB seam, No-1 Incline unit- 2 nos of Trolley collection from No-1 incline Underground different site to surface pit top and transport to workshop
OneVishwa direct haulage with 50HP, 550V motor, bedplate, 19mm x 350-meter haulage rope, reverse forward starter, breaker, LS Unit, 35sqmm x 40-meter power cable etc transporting from Colliery workshop to No-1 incline surface & loading on coal tub & trolley.
Same haulage complete set with electrical & Haulage rope lowering from surface to underground 28L/OD & transporting from 28L/OD to proposed stowing panel S-8 4D/5L- 6L site.
Same haulage with electrical unloading on trolley & placeing on haulage foundation at 4D/5L- 6L & installation the same with starting after placing of equipment
CMPF cost (limited to the amount paid as per labour payment certificate)
Total impact of GST for the purpose of CTC
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 0.83 MB
Tendernotice_2.pdf
PDF • 1.25 MB
BOQ_365893.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid