Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.6 LAdmitted-Finance | ₹7.6 L | L1 | Admitted-Finance |
| 2 | L2₹7.6 L+₹5,000 (0.66%)Admitted-Finance | ₹7.6 L+₹5,000 (0.66%) | L2 | Admitted-Finance |
| 3 | L3₹8.4 L+₹79,265 (10.5%)Admitted-Finance | ₹8.4 L+₹79,265 (10.5%) | L3 | Admitted-Finance |
| 4 | L4₹8.6 L+₹1.0 L (13.7%)Admitted-Finance | ₹8.6 L+₹1.0 L (13.7%) | L4 | Admitted-Finance |
| 5 | L5₹8.9 L+₹1.3 L (17.2%)Admitted-Finance | ₹8.9 L+₹1.3 L (17.2%) | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | MALIK ELECTRIICALS COMPANY L5 | M/S ABID CONTRACTOR L1 | M/S FAISAL ELECTRICALS L4 | M/S MOHAMMAD ABBAS L2 | Jagad Electrical & Fabricators L3 |
|---|---|---|---|---|---|---|---|---|
| 1.00Cartage of following material from store center Meerut to JE Store including loading & unloading at both ends maximum distance up to 40 Km. :– | ||||||||
| 2.00 | A) PCC pole 8.5/ 9 / 11 mtr long./STP Pole 11 mtr. Long | 80 | Nos | 800 ₹64,000 | 400 ₹32,000 Lowest | 750 ₹60,000 | 420 ₹33,600 | 749 ₹59,920 |
| 3.00 | B) 25 to 100 KVA T/f. | 5 | Nos | 1,000 ₹5,000 Lowest | 3,000 ₹15,000 | 4,500 ₹22,500 | 3,010 ₹15,050 | 5,000 ₹25,000 |
| 4.00 | Cartage of line material from store centre to dump site & then dump site to sire of work on day to day basis, including loading & unloading at both ends maximum distance up to 20 Km. | 2 | Job | 500 ₹1,000 Lowest | 5,000 ₹10,000 | 1,000 ₹2,000 | 5,011 ₹10,022 | 1,000 ₹2,000 |
| 5.00 | Cartage of following from dump site to site of work on day to day basis including loading & unloading at both ends maximum distance up to 20 Km :– A) PCC pole 8.5/ 9 / 11 mtr long./STP Pole 11 mtr. Long | 80 | Nos | 1,500 ₹1,20,000 | 200 ₹16,000 Lowest | 350 ₹28,000 | 205 ₹16,400 | 410 ₹32,800 |
| 6.00 | B) 25 to 100 KVA T/f. | 5 | Nos | 3,000 ₹15,000 | 1,500 ₹7,500 Lowest | 3,500 ₹17,500 | 1,507 ₹7,535 | 2,500 ₹12,500 |
| 7.00 | Dismantling of damage PCC pole/DP of 33 kv line & HT/LT line after opening the bindings of damage poles. | 50 | Nos | 1,000 ₹50,000 | 1,000 ₹50,000 | 200 ₹10,000 | 1,011 ₹50,550 | 150 ₹7,500 Lowest |
| 8.00 | Erection of PCC Pole 8.5/ 9 / 11 mtr long/STP pole 11 mtr. long after digging a pits of required size with fixing HT/LT line accessories complete with grouting. | 60 | Nos | 1,500 ₹90,000 Lowest | 1,500 ₹90,000 Lowest | 3,500 ₹2,10,000 | 1,507 ₹90,420 | 3,250 ₹1,95,000 |
| 9.00 | Erection of Double Pole 8.5/11 mtr. Long after digging a pits of required size with fixing HT/LT line accessories complete with grouting. | 5 | Nos | 2,000 ₹10,000 Lowest | 5,000 ₹25,000 | 5,500 ₹27,500 | 5,010 ₹25,050 | 5,500 ₹27,500 |
| 10.00 | Mounting of 25 to 100 KVA Transformer on DP as site | 8 | Nos | 2,000 ₹16,000 | 1,000 ₹8,000 Lowest | 1,500 ₹12,000 | 1,011 ₹8,088 | 1,450 ₹11,600 |
Tender Value
₹8.5 L
EMD Value
₹8,475
Closing Date
24 Aug 2026, 12:00 pmClosed
SE EDC 2 MT
SE EDC 2 MT
TNO.30/EDC2MT/2026-27
2026_PVVNL_1176441_1
TNO.30/EDC2MT/2026-27
Open Tender
Electrical Works
Lump-sum
180 days
EDD SARDHANA
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,180
SE EDC 2 MT
₹8,475
8 Sept 2026
12 Aug 2026
24 Aug 2026
12 Aug 2026
24 Aug 2026
12 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Cartage of following material from store center Meerut to JE Store including loading & unloading at both ends maximum distance up to 40 Km. :– | - | - | - | - |
| 2 | A) PCC pole 8.5/ 9 / 11 mtr long./STP Pole 11 mtr. Long | 80 | Nos | 100 | ₹8,000 |
| 3 | B) 25 to 100 KVA T/f. | 5 | Nos | 100 | ₹500 |
| 4 | Cartage of line material from store centre to dump site & then dump site to sire of work on day to day basis, including loading & unloading at both ends maximum distance up to 20 Km. | 2 | Job | 100 | ₹200 |
| 5 | Cartage of following from dump site to site of work on day to day basis including loading & unloading at both ends maximum distance up to 20 Km :– A) PCC pole 8.5/ 9 / 11 mtr long./STP Pole 11 mtr. Long | 80 | Nos | 100 | ₹8,000 |
| 6 | B) 25 to 100 KVA T/f. | 5 | Nos | 100 | ₹500 |
| 7 | Dismantling of damage PCC pole/DP of 33 kv line & HT/LT line after opening the bindings of damage poles. | 50 | Nos | 100 | ₹5,000 |
| 8 | Erection of PCC Pole 8.5/ 9 / 11 mtr long/STP pole 11 mtr. long after digging a pits of required size with fixing HT/LT line accessories complete with grouting. | 60 | Nos | 100 | ₹6,000 |
| 9 | Erection of Double Pole 8.5/11 mtr. Long after digging a pits of required size with fixing HT/LT line accessories complete with grouting. | 5 | Nos | 100 | ₹500 |
| 10 | Mounting of 25 to 100 KVA Transformer on DP as site | 8 | Nos | 100 | ₹800 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.06 MB
BOQ_2210861.xls
BOQ • 0.24 MB
TenderForm30.pdf
Tender Documents • 0.28 MB
OM_DATE_EXT.pdf
PDF • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .