| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹70,512.64Admitted-Finance | -29.00% | ₹70,512.64 | L1 | Admitted-Finance |
| 2 | L2₹71,962.62Admitted-Finance | -27.54% | ₹71,962.62 | L2 | Admitted-Finance |
Tender Value
₹1 L
EMD Value
₹2,000
Closing Date
27 Jan 2026, 4:00 pmClosed
XEN REW Kathua
XEN REW Kathua
Bowli repair blow
2026_RDPR_300894_22
e-NIT No.315/REW/K of 2025-26 Dated 19/01/2026 2nd call
Open Tender
Civil Works
30 days
Basohli
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
Rural Development and Panchayati Raj
₹2,000
29 Jan 2026
19 Jan 2026
28 Jan 2026
19 Jan 2026
27 Jan 2026
19 Jan 2026
Select, At Par, Excess (+), Less (-) IOCL
Tender Inviting Authority: EXECUTIVE ENGINEER REW DIVISION KATHUA
Name of Work;- Constt. Of Repair Bowli Blow pyt :- saman Block Basohli District Kathua under Development Scheme (CDF) for the year 2025-26 ESTT AMOUNT 1.00 LACS
Contract NO:- MLACDF 2025-26
Name of the Bidder/ Bidding Firm / Company :
S. No. Item Description Item Code / Make Quantity Units Estimated Rate in Rs. P Addition / Deduction Addition / Deduction Values Currency Convertion against each Item Quoted Currency in INR / Other Currency BASIC RATE In Figures To be entered by the Bidder Rs. P Excise Duty VAT Freight Charges ( Unloading & Stacking) Any Other Taxes/Duties/Levies Other Taxes 2 IIIrd Party i.e DGS&D / RITES etc Inspection Charges @0.34%+Service Tax Less for Cenvat Credit,if any respect of Supplies Under full Excise Duty Category TOTAL AMOUNT in Rs. P TOTAL AMOUNT With Taxes TOTAL AMOUNT In Words
Demolishing stone rubble masonry manually/by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 meters lead as per direction of Engineer-in-charge: 3.06 cum 1740.45 1000 Excess(+) Full Conversion INR INR Five Thousand Three Hundred & Twenty Five and Paise Seventy Eight Only 1 Construction of chamber for 100mm sluices valve item1 10 1 Nos
Demolishing cement concrete manually/by mechanical means including disposal of material within 50 meters lead as per direction of Engineer-in charge: 0.71 cum 1725.2 1000 Excess(+) Full Conversion INR INR One Thousand Two Hundred & Twenty Four and Paise Eighty Nine Only
Earth work in excavation by manual in trenches for foundations, drains, pipes, cables etc. (Not exceeding 1.5 mtr in width) and for shafts, wells, cesspits and the like not exceeding 10sqm on plan, depth upto 1.5mtr. Cum 1000 Excess(+) Full Conversion INR
Providing and laying in position dry stone aggregate 40 mm using nominal size Cum 1000 Excess(+) Full Conversion INR INR Five Thousand Four Hundred & Fifty Three and Paise Ninety Five Only
Random Rubble masonry with hard stone in foundation and plinth including leveling up with cement concrete 1:6:12 (1 Cement : 6 coarse sand : 12 graded stone aggregate 20mm nominal size) upto plinth level and curing complete with: Cum 1000 Excess(+) Full Conversion INR INR Forty Three Thousand Five Hundred & Ninety Four and Paise Fourteen Only
Cement concrete flooring 1:2:4 (1cement: 2 coarse sand: 4 graded stone aggregate) finished with a floating coat of neat cement including cement slurry and curing complete, but excluding the cost of nosing of steps etc. complete. 40mm thick with 20 mm nominal size stone aggregate. 50 mm thick with 20mm nominal size stone aggregate. sqm 1000 Excess(+) Full Conversion INR INR Five Thousand Two Hundred & Twenty One and Paise Ninety One Only
Providing and laying damp-proof Course 50 mm thick with cement concrete 1:2:4 (1 cement:2 coarse sand: 4 graded stone aggregate 20 mm nominal size) and curing complete sqm 1000 Excess(+) Full Conversion INR INR Two Thousand Four Hundred & Nineteen and Paise Eighty Seven Only
20mm Cement plaster of mix: 1:6 sqm 1000 Excess(+) Full Conversion INR INR Eight Thousand &Eighty Seven and Paise Ten Only
6mm plaster to ceiling of mix 1:3 sqm 1000 Excess(+) Full Conversion INR INR One Thousand &Ninety Eight and Paise Fourteen Only
Providing and fixing G.I. chain link fabric fencing of required width in mesh size 50x50 mm including strengthening with 2 mm dia wire or nuts, bolts and washers as required complete as per the direction of Engineer-in charge sqm 1000 Excess(+) Full Conversion INR INR Three Thousand Six Hundred & Twelve and Paise Fifteen Only
Carriage of material from the source to the site of work
Sand and Bajri (40mm) avg lead 70 km by MT+1.5km at Cum 1000 Excess(+) Full Conversion INR INR Fourteen Thousand Three Hundred & Thirty Four and Paise Seventy Six Only
s aggregates by 400m at Cum 1000 Excess(+) Full Conversion INR INR Five Hundred & Fifty Three and Paise Three Only
stones by 400 m at Cum 1000 Excess(+) Full Conversion INR INR Four Thousand Seven Hundred & Fifty Eight and Paise Twenty Four Only
Providing and fixing CIB of approved size by way of making foundation in M10, Brickwork in 1:6 cement mortar including plastering with 1:4 cement mortar, painting and writings as per the direction of engineer incharge including all carriages , supply , complete job. each 1000 Excess(+) Full Conversion INR INR Two Thousand Only
Total in Figures Excess(+) Full Conversion INR INR Ninety Nine Thousand Three Hundred & Thirteen and Paise Fifty Eight Only 4 Construction of chamber for 100mm sluice plates item5 10 Nos
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.68 MB
BOQ_976274.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid