Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹1.8 LAccepted-AOC | 1 | Accepted-AOC Lowest Amount Quoted | |
| 2 | 2₹1.9 L+₹2,753 (1.51%)Rejected-Finance | 2 | Rejected-Finance Highest Amount Quoted Compare with Rank 1 |
Tender Value
₹2.5 L
EMD Value
₹2,500
Closing Date
16 Nov 2023, 4:30 pmClosed
Block Developement Officer BP
Pollachi North Block Panchayat Union Office
Renovation of East Facing RCC Roof School Building at Boligoundenpalayam H/O Boligoundenpalayam
2023_RDTN_387415_1
Roc1551/2023/A2dt25.10.2023
Open Tender
Civil Works - Buildings
Item Rate
120 days
pollachi
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹2,500
Yes
17 Nov 2023
9 Nov 2023
16 Nov 2023
9 Nov 2023
16 Nov 2023
9 Nov 2023
Amount
Dismantling and removal of Pressed Tiles & Weathering Course
Weathering course in brick jelly lime concrete using broken brick jelly of size 20mm uniform gauge in pure slaked lime (no crushed stone M.Sand to be used) to the proportion of brick jelly to lime being 32:12.5 by volume and laid over the RCC roof slab in a single layer of required slope and finished by beating the concrete with wooden beaters of approved pattern, keeping the surface constantly wet by sprinkling lime jaggery water, etc., complete as per standard specification and as directed by the deparmental officers.
Finishing the top of roof with one course of machine pressed tiles of size 230mm x 230mm x 20mm of approved quality set in Cement Mortar 1:3 (One Cement and Three Crushed stone M.Sand) 12mm thick mixed with water proofing compound conforming to ISS at 2% by weight of cement used and the joints pointed neatly to full depth of tiles with the same cement mortar mixed with red oxide and water proofing compound including curing etc., complete complying with standard specification and as directed by the departmental
Removal of Cement Plastering Including all Charges etc…, Compelete
Plastering with cement mortar 1:5 mix to 12 mm thick including cost and conveyance of all materials to site and all labour charges etc complete for 10 Sqm
Plastering with cement mortar 1:3 mix to 10 mm thick including cost and conveyance of all materials to site and all labour charges etc complete for 10 Sqm
Flooring with following ceramic tiles of size 305 x305x6mm laid over 20mm thickcement motar 1:3 incudling etc..,
Distembering One coat with best approved distember including cost and conveyance of all materials to site and all labour charges etc complete
Painting two coats with Emulsion Paint over the one coat of Priming coat including cost and conveyance of all materials to site and all labour charges etc complete
White washing two coats with freshly burnt white shell lime in all floors including cost of lime, blue powder fevicol type gum, brushes, scaffolding charges, etc., complete complying with standard specification and as directed.
Painting Old iron works such as steel doors, windows, ventilators, window bars, balustrades etc., with two coats of best approved first quality and colour of synthetic enamel paint over the existing red oxide priming coat in all floors excluding cost of priming coat etc., complete complying with standard specification. (The make, quality and colour of paint should be got approved by the Executive Engineer before use on works.)
Painting two coats with enamel paint for ABL Boards Black Boards,etc,as per specification and as directed
Provision for bala Painting Including all charges etc.., complete
SURENDRAKUMARAN
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .