| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.4 CrAccepted-AOC | ₹2.4 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹2.9 Cr+₹52.2 L (21.9%)Rejected-AOC | ₹2.9 Cr+₹52.2 L (21.9%) | L2 | Rejected-AOC L2 |
| 3 | L3₹3.0 Cr+₹66.6 L (28.0%)Rejected-AOC | ₹3.0 Cr+₹66.6 L (28.0%) | L3 | Rejected-AOC L3 |
| 4 | L4₹3.1 Cr+₹75.0 L (31.5%)Rejected-AOC | ₹3.1 Cr+₹75.0 L (31.5%) | L4 | Rejected-AOC L4 |
| 5 | L5₹3.2 Cr+₹83.3 L (35.0%)Rejected-AOC | ₹3.2 Cr+₹83.3 L (35.0%) | L5 | Rejected-AOC L5 |
Tender Value
₹3.6 Cr
EMD Value
₹7.1 L
Closing Date
27 Aug 2019, 5:00 pmClosed
SE ICC MAHOBA
OFFICE OF THE SE ICC BAJARIYA MAHOBA
EARTH WORK AND PUCCA WORK OF KULKUWA MINOR FROM KM 0.00 TO 6.500 OFFTAKING AT 10.650 OF KHANDEH DY (LOT-3)
2019_UPIDC_374350_3
01/SE/2019-20
Open Tender
Civil Works
Item Rate
90 days
KARWI
AS PER NIT AND TENDER DOCUMENT
2 documents required · 2 mandatory
₹2,354
EE IRRIGATION CONSTRUCTION DIVISION
₹7.1 L
Yes
24 May 2021
22 Aug 2019
28 Aug 2019
22 Aug 2019
27 Aug 2019
22 Aug 2019
Amount
The quantities given here under are tentative. They can vary on either side upto any extant,the contractor shall have no claim on account of changes and shall be paid of the quantities as physically met at site reach of work for complete work.
E/W in cutting in MKR and Kankar mixed soil with lead up to 30 mtr and all lift including levelling, dressing, and manual compaction, with required for proper completion of work etc all complete but excluding GST.
Earth work in filling for making embankment & cutiing canal cross section after mechanical compaction including dressing and watering with all leads & lifts labour charges and T&P etc proper completion of work but excluding GST.
E/w excavation in foundation of MKR mixed soil including initial lead and lift etc. all complete. but excluding GST.
Supply and laying of coarse sand in foundation/floor including all cost of material labour T&P etc . All complete but excluding GST.
Laying C.C. work 1:3:6 with cement course sand and stone grit 25 to 50 mm including all cost of material, labour, T&P and proper completion of work but excluding GST.
R.C.R. Stone masonry with 1:4 cement course sand including all cost of material, labour: T&P and proper completion of work but excluding GST.
Grouted Stone Pitching in 1:4 cm including all cost of material, labour, T&P and proper completion of work but excluding GST.
Laying C.C. work 1:1.5:3 for slab with cement course sand and stone grit 10 to 20 mm including all cost of material, labour, T&P and proper completion of work but excluding GST.
Laying C.C. work 1:2:4 with cement course sand and stone grit 10 to 20 mm including all cost of material, labour, T&P and proper completion of work but excluding GST.
Steel Reinforcement for RCC work including cutting, placing & binding with GI wire etc. all complete but excluding GST.
Centering and Shuttering of C.C. Work including all material, labour T&P etc. all complete but excluding GST.
Cement pointing in 1:2 cement mortor with coarse sand including all material, labour, T&P etc. complete but excluding GST.
Earth Work in Back Filling with all cost of labour T&P etc all complete but excluding GST.
M/S RAGHVENDRA PRATAP SINGH
MS YADAV AND SONS
Mohit Yadav
Hari Construction
Construction Network India
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .