| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹7.5 LAdmitted-Finance | -35.00% | ₹7.5 L | L1 | Admitted-Finance |
| 2 | L2₹9.8 L+₹2.3 L (30.7%)Admitted-Finance SIKAR | SIKAR | RAJASTHAN | 331024 | -15.07% | ₹9.8 L+₹2.3 L (30.7%) | L2 | Admitted-Finance |
Tender Value
₹11.6 L
EMD Value
₹23,100
Closing Date
13 Aug 2026, 6:00 pmClosed
Executive Engineer PHED Division Jhalawar
Executive Engineer PHED Division Jhalawar
Operation and Maintenance of Operation and Maintenance of Manoharthana Water supply Project District Jhalawar for 01 Years
2026_PHCJA_582532_1
NIT No 07 (2026-27) Div Jhalawar
Open Tender
Civil Works
Percentage
365 days
Operation and Maintenance of Operation and Mainten
As per TD
2 documents required · 2 mandatory
₹500
23570 XEN PHED Div Jhalawar through E Grass
₹23,100
Yes
17 Aug 2026
5 Aug 2026
14 Aug 2026
5 Aug 2026
13 Aug 2026
5 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Running expenditure of pump houses which includes complete operation of pump motor, maintenance of log-books as directed by engineer-in-charge, general upkeeping of premises, security arrangements, regular chemical dosing in CWR, cleaning and desilting of SR/CWR/SUMP once every six months, daily valve operation under the campus of pump house and all other document for pump house per month. (power supply minimum 16 hours) (excluding repairing of pumping machinery etc.) upto 100 HP (Item No. 7.6.1) | 12 | Each | 36,600 | ₹4,39,200 |
| 2 | Maintenance of Centrifugal pump sets and motar/ monoblock including cost of rewinding of motars material components and accessories required to repair pump sets , straters etc. of electric panels deinstallation and re installation of pump sets complete in all respect for per Centrifugal pump set sheet as directed by Engineer in charge for centrifugal pump set per month. Operated load of Centrifugal Pump sets (HP) Item 7.8
3.0 HP to 5.0 HP (02Nos) BSR Item No. 7.8.2 | 24 | Each | 1,499 | ₹35,976 |
| 3 | Maintenance of Centrifugal pump sets and motar/ monoblock including cost of rewinding of motars material components and accessories required to repair pump sets , straters etc. of electric panels deinstallation and re installation of pump sets complete in all respect for per Centrifugal pump set sheet as directed by Engineer in charge for centrifugal pump set per month. Operated load of Centrifugal Pump sets (HP) Item 7.8
13.0 HP to 20.0 HP (02Nos =1W+1S) BSR Item No. 7.8.4 | 12 | Each | 3,307 | ₹39,684 |
| 4 | Maintenance of Centrifugal pump sets and motar/ monoblock including cost of rewinding of motars material components and accessories required to repair pump sets , straters etc. of electric panels deinstallation and re installation of pump sets complete in all respect for per Centrifugal pump set sheet as directed by Engineer in charge for centrifugal pump set per month. Operated load of Centrifugal Pump sets (HP) Item 7.8
21.0 HP to 30.0 HP (02Nos =1W+1S) BSR Item No. 7.8.5 | 12 | Each | 3,815 | ₹45,780 |
| 5 | Providing and Fixing Power Factor Control Capacitor Panel with MTC on monthly Rental Basis the responsibility of contractor is to maintain minimum power factor as 0.96 if the Contractor is fail to maintain minimum PF and any sucrchagre on this account is levied by JVNNL the same shall be deducted from payment of Contractor. Item No. 9.1 | 1,200 | Per HP | 24 | ₹28,800 |
| 6 | Daily/perodical operation of valves at supply times for specified by department per sluice valve per month. (Valve rod and cap to be arranged by contractor) 80mm to 300mm (10Nos) Item No. 7.5.1 | 120 | Nos | 1,200 | ₹1,44,000 |
| 7 | Cleaning of Clear water reservoirs ( CWR's) of below mentioned capacity including removal of all silt from reservoir, scrapping of walls, disinfection of reservoir after cleaning and disposal of silt up to 1.00 Km lead and painting the date of cleaning on the reservoir. 201 to 300 KL Item No. 4.2.9 | 4 | Each | 6,282 | ₹25,128 |
| 8 | Cleaning of Over Head Service Reservoir ( OHSR ) of below mentioned capacity including removal of all silt from reservoir, scrapping of walls, disinfection of reservoir after cleaning and disposal of silt up to 1.00 Km lead and painting the date of cleaning on the reservoir. Item No. 4.3 ,
101 to 200 KL(05Nos-Ramnagar I&II, Kumahar Mohalla-I,Tehsil Campus-I&II) Item No. 4.3.2 | 10 | Each | 6,661 | ₹66,610 |
| 9 | Cleaning of Over Head Service Reservoir ( OHSR ) of below mentioned capacity including removal of all silt from reservoir, scrapping of walls, disinfection of reservoir after cleaning and disposal of silt up to 1.00 Km lead and painting the date of cleaning on the reservoir. Item No. 4.3
201 to 300 KL (01Nos-Kumahar Mohala-II) Item No. 4.3.3 | 2 | Each | 10,051 | ₹20,102 |
| 10 | Cleaning of Over Head Service Reservoir ( OHSR ) of below mentioned capacity including removal of all silt from reservoir, scrapping of walls, disinfection of reservoir after cleaning and disposal of silt up to 1.00 Km lead and painting the date of cleaning on the reservoir. Item No. 4.3301 to 400 KL (01Nos-Mela Maidan) Item No. 4.3.4 | 2 | Each | 12,566 | ₹25,132 |
stage.html
html • 0.03 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 11.42 MB
TD_07.pdf
Tender Documents • 2.06 MB
BOQ_1035002.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .