| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹22.0 CrAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹24.3 Cr+₹2.1 Cr (9.62%)Rejected-Finance | L2 | Rejected-Finance L2 | |
| 3 | L3₹25.3 Cr+₹3.1 Cr (14.2%)Rejected-Finance BAKRON KA WADA NEAR NEELAM CINEMA JODHPUR ROAD BALOTRA BARMER RAJASTHAN 344022 | BALOTRA | BARMER | RAJASTHAN | 344022 | L3 | Rejected-Finance L3 | |
| 4 | L4₹29.0 Cr+₹6.8 Cr (30.9%)Rejected-Finance NO 91 GROUND FLOOR 3RD CROSS ROAD OPPOSITE VASAVI KANNIKA PARAMESHWARI TEMPLE BENGALURU BENGALURU 560021 KARNATAKA INDIA | BENGALURU | BENGALURU | KARNATAKA | 560021 | L4 | Rejected-Finance L4 | |
| 5 | L5₹29.3 Cr+₹7.1 Cr (32.3%)Rejected-Finance FLAT NO 202 RAHUL ENCLAVES S NO 116 7 1 PLOT NO A WARJE PUNE 411058 | PUNE | MAHARASHTRA | 411058 | L5 | Rejected-Finance L5 |
| Sl No | Description | Qty | Unit | KMV Projects Limited L1 | Brahma Infra L3 | KVR Construction Heights Pvt Ltd L4 | ANISH INFRACON INDIA PVT. LTD. L2 | R K Chavan Infrastructure Pvt Ltd L5 |
|---|---|---|---|---|---|---|---|---|
| 1.00 | Earth work excavation by mechanical means (Hydraulic excavator of 0.9 cum bucket capacity) in all kinds of soil (excluding hard rock) including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, transporting and unloading to the embankment/ filling location within all lifts and lead within Airport Premises as directed by Engineer-in-Charge. | 94,729 | cum | 90 ₹85,25,610 | 140 ₹1,32,62,060 | 99 ₹93,78,171 | 85 ₹80,51,965 Lowest | 160 ₹1,51,56,640 |
| 2.00 | Construction of Embankment with moorum of minimum CBR 12% in layers not exceeding 20 cm in depth, breaking clods, watering, rolloing each layer with compactor /vibratory roller of minimum 8-12 tonne capacity including levelling to the required grade and camber dressing etc. to achieve relative compaction as per Technical Specifications and as per IS 2720(Part-8) and as per MORTH specification, and as per direction of the Engineer-in-charge. (Payment to be made for compacted quantity only). | 2,121 | cum | 30 ₹63,630 Lowest | 100 ₹2,12,100 | 30 ₹63,630 Lowest | 100 ₹2,12,100 | 550 ₹11,66,550 |
| 3.00 | Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers withgrader in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density.
Laying Using Grader | 9,240 | cum | 1,755 ₹1,62,16,200 | 1,700 ₹1,57,08,000 Lowest | 1,800 ₹1,66,32,000 | 2,000 ₹1,84,80,000 | 2,150 ₹1,98,66,000 |
| 4.00 | Construction of dry lean cement concrete Sub- base over a prepared sub-grade with coarse and fine aggregate conforming to IS: 383, the size of coarse aggregate not exceeding 25 mm, aggregate cement ratio not to exceed 15:1, aggregate gradation after blending to be as per table 600-1, cement content not to be less than 150 kg/ cum, optimum moisture content to be determined during trial length construction, concrete strength not to be less than 10 Mpa at 7 days, mixed in a batching plant, transported to site, laid with a paver with electronic sensor, compacting with 8-10 tonnes vibratory roller, finishing and curing. | 8,417 | cum | 3,425 ₹2,88,28,225 | 3,400 ₹2,86,17,800 | 4,500 ₹3,78,76,500 | 3,000 ₹2,52,51,000 Lowest | 3,650 ₹3,07,22,050 |
| 5.00Providing and laying Pavement Quality Concrete (PQC) produced in a batching and mixing plant having a Characteristic flexural strength i.e. flexural strength of 4.1 MPa at 28 days using Ordinary Portland cement of 43/53 grade or Portland Pozzolana Cement or Portland Slag cement conforming as per relevant IS codes, to be mixed at Site, with 0.5% Super plasticizer by mass of cementitious material, fine aggregate, Graded stone aggregates of 40 mm nominal size in appropriate proportion as per Specification and job mix formula, laid in panels as per drawings/design as approved by the Engineer-In-Charge using Fixed form paver / Manual Method including anti friction layer, joint filler board, making necessary provision for expansion, dummy and Construction joint including filling with Polysulphide sealant of approved make, curing and making profile, complete as per direction of Engineer-in-Charge and Techanical specifications. The item for execution shall include all operations making pavement for intended use but not limited to following: i. Polyethylene sheet (White in color) of thickness 400 micron conforming to IS: 2508 with 6mm thick fine sand layer. ii. Providing and laying in position for expansion joint, 25mm thick pre-cut Synthetic joint filler board of approved make conforming to IS:1838(part 3)-2011, 45 mm from top (to be removed at the time of filling of Polysulphide sealant). iii. Mechanically cutting dummy joints 3mm wide x 1/3rd thickness of slab which is subsequently widened to 10mm for the top 25mm depth and construction joints 10mm wide x 25mm deep as per specification | ||||||||
| 5.10 | iv. Providing and laying in position Polysulphide sealant of approved make conforming to BS-5212-1990 or IS: 11433-1995 in expansion/ construction / dummy joints including rounding off edges, applying 2 coats of approved primer compatible with the brand of Polysulphide and preparing the surface and applying masking tape along the edge of joint to prevent accidental spillage of sealant on top surface and to give neat finish to the sealant and removing the masking tape after application of sealant etc. as per the details below:
a) Expansion Joints of size 25 mm wide and 10 mm deep over 30mm dia expanded closed-cell Polyethylene foam back-up/backer rod of minimum density 22 Kg/cum, as per manufacturer’s specifications and sketch at Appendix-‘A’.
b) Construction Joints of size 10 mm wide and 10 mm deep over 12mm dia expanded closed-cell Polyethylene foam back-up/backer rod of minimum density 22 Kg/Cum, as per manufacturer’s specifications and sketch at Appendix-‘A’
c) Dummy Joints of size 10 mm wide and 10 mm deep over 12 mm dia expanded closed-cell Polyethylene foam back-up/backer rod of minimum density 22 Kg/Cum, as per manufacturer’s specifications ,and sketch at Appendix-‘A’
v) Making profile as per DGCA CAR, panel drawing showing dummy, construction, expansion joints location.
Note:The quantity of cement, type of cement and super plasticizer for one Cum. Of Finished concrete specified are for tendering purpose only. The contractor shall quote his rates assuming quantity of OPC cement as 360 Kg/cum or 400 Kg of Portland Pozzolana Cement/ Portland Slag cement. In addition, if the actual quantity of cement & super plasticizer required as per laboratory mix design varies from the quantity assumed above, necessary cost adjustment for deviation in the quantity of cement and super plasticizer as per mix design, if any, shall be done as per the rate of cement and super plasticizer in actual supply voucher from manufacturer/authorized dealer at the time of execution. In the case of authorized distributor, the rate may be authenticated by the manufacturer. The rate of cement and super plasticizer exclusive of GST shall only be considered for payment. | 23,265 | cum | 5,090 ₹11,84,18,850 Lowest | 6,200 ₹14,42,43,000 | 7,200 ₹16,75,08,000 | 6,100 ₹14,19,16,500 | 6,800 ₹15,82,02,000 |
| 6.00 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources : 6 graded stone aggregate 20 mm nominal size derived from natural sources) | 2,507 | cum | 4,040 ₹1,01,28,280 | 4,500 ₹1,12,81,500 | 6,300 ₹1,57,94,100 | 4,000 ₹1,00,28,000 Lowest | 7,100 ₹1,77,99,700 |
| 7.00 | Dismantling of cement concrete pavement by mechanical means using pneumatic tools, breaking to pieces not exceeding 0.02 cum in volume and stock piling at designated locations and disposal of dismantled materials up to a lead of 2000 metres, stacking serviceable and unserviceable materials separately | 299 | cum | 665 ₹1,98,835 | 500 ₹1,49,500 Lowest | 900 ₹2,69,100 | 600 ₹1,79,400 | 550 ₹1,64,450 |
| 8.00 | Dismantling of flexible pavement (bituminuous courses) by mechanical means and disposal of dismantled material up to a lead of 1 kilometre, as per direction of Engineer-in-charge. | 8,265 | sqm | 305 ₹25,20,825 | 500 ₹41,32,500 | 500 ₹41,32,500 | 250 ₹20,66,250 | 65 ₹5,37,225 Lowest |
| 9.00 | Centering and shuttering including strutting, propping etc. and removal of form for all heights: Foundation, footing, bases of columns etc., for mass concrete. | 631 | sqm | 450 ₹2,83,950 | 350 ₹2,20,850 Lowest | 392 ₹2,47,352 | 450 ₹2,83,950 | 740 ₹4,66,940 |
Tender Value
₹22.1 Cr
EMD Value
₹66.4 L
Closing Date
14 Jul 2025, 6:00 pmClosed
Senior Manager (Engg.- Civil)
Airports Authority of India, O/o Executive Director (Engg.)-SR, Corporate Head Quarters, A-Block, 3rd Floor, Rajiv Gandhi Bhawan, Safdarjung Airport, New Delhi-110 003
Extension and re-configuration of Apron Bays for Code-C type of Aircraft and allied infrastructure at Belagavi Airport.
2025_AAI_238712_1
AAI/ENGG/ED-SR/BELAGAVI/APRON
Open Tender
Construction Works
Item Rate
150 days
Belagavi
Please refer Tender Documents
8 documents required · 8 mandatory
₹5,900
₹66.4 L
24 Sept 2025
24 Jun 2025
18 Jul 2025
24 Jun 2025
14 Jul 2025
2 Jul 2025
24 Jun 2025 - 30 Jun 2025
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work excavation by mechanical means (Hydraulic excavator of 0.9 cum bucket capacity) in all kinds of soil (excluding hard rock) including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, transporting and unloading to the embankment/ filling location within all lifts and lead within Airport Premises as directed by Engineer-in-Charge. | 94,729 | cum | - | - |
| 2 | Construction of Embankment with moorum of minimum CBR 12% in layers not exceeding 20 cm in depth, breaking clods, watering, rolloing each layer with compactor /vibratory roller of minimum 8-12 tonne capacity including levelling to the required grade and camber dressing etc. to achieve relative compaction as per Technical Specifications and as per IS 2720(Part-8) and as per MORTH specification, and as per direction of the Engineer-in-charge. (Payment to be made for compacted quantity only). | 2,121 | cum | - | - |
| 3 | Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers withgrader in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density.
Laying Using Grader | 9,240 | cum | - | - |
| 4 | Construction of dry lean cement concrete Sub- base over a prepared sub-grade with coarse and fine aggregate conforming to IS: 383, the size of coarse aggregate not exceeding 25 mm, aggregate cement ratio not to exceed 15:1, aggregate gradation after blending to be as per table 600-1, cement content not to be less than 150 kg/ cum, optimum moisture content to be determined during trial length construction, concrete strength not to be less than 10 Mpa at 7 days, mixed in a batching plant, transported to site, laid with a paver with electronic sensor, compacting with 8-10 tonnes vibratory roller, finishing and curing. | 8,417 | cum | - | - |
| 5Providing and laying Pavement Quality Concrete (PQC) produced in a batching and mixing plant having a Characteristic flexural strength i.e. flexural strength of 4.1 MPa at 28 days using Ordinary Portland cement of 43/53 grade or Portland Pozzolana Cement or Portland Slag cement conforming as per relevant IS codes, to be mixed at Site, with 0.5% Super plasticizer by mass of cementitious material, fine aggregate, Graded stone aggregates of 40 mm nominal size in appropriate proportion as per Specification and job mix formula, laid in panels as per drawings/design as approved by the Engineer-In-Charge using Fixed form paver / Manual Method including anti friction layer, joint filler board, making necessary provision for expansion, dummy and Construction joint including filling with Polysulphide sealant of approved make, curing and making profile, complete as per direction of Engineer-in-Charge and Techanical specifications. The item for execution shall include all operations making pavement for intended use but not limited to following: i. Polyethylene sheet (White in color) of thickness 400 micron conforming to IS: 2508 with 6mm thick fine sand layer. ii. Providing and laying in position for expansion joint, 25mm thick pre-cut Synthetic joint filler board of approved make conforming to IS:1838(part 3)-2011, 45 mm from top (to be removed at the time of filling of Polysulphide sealant). iii. Mechanically cutting dummy joints 3mm wide x 1/3rd thickness of slab which is subsequently widened to 10mm for the top 25mm depth and construction joints 10mm wide x 25mm deep as per specification | |||||
| 5.1 | iv. Providing and laying in position Polysulphide sealant of approved make conforming to BS-5212-1990 or IS: 11433-1995 in expansion/ construction / dummy joints including rounding off edges, applying 2 coats of approved primer compatible with the brand of Polysulphide and preparing the surface and applying masking tape along the edge of joint to prevent accidental spillage of sealant on top surface and to give neat finish to the sealant and removing the masking tape after application of sealant etc. as per the details below:
a) Expansion Joints of size 25 mm wide and 10 mm deep over 30mm dia expanded closed-cell Polyethylene foam back-up/backer rod of minimum density 22 Kg/cum, as per manufacturer’s specifications and sketch at Appendix-‘A’.
b) Construction Joints of size 10 mm wide and 10 mm deep over 12mm dia expanded closed-cell Polyethylene foam back-up/backer rod of minimum density 22 Kg/Cum, as per manufacturer’s specifications and sketch at Appendix-‘A’
c) Dummy Joints of size 10 mm wide and 10 mm deep over 12 mm dia expanded closed-cell Polyethylene foam back-up/backer rod of minimum density 22 Kg/Cum, as per manufacturer’s specifications ,and sketch at Appendix-‘A’
v) Making profile as per DGCA CAR, panel drawing showing dummy, construction, expansion joints location.
Note:The quantity of cement, type of cement and super plasticizer for one Cum. Of Finished concrete specified are for tendering purpose only. The contractor shall quote his rates assuming quantity of OPC cement as 360 Kg/cum or 400 Kg of Portland Pozzolana Cement/ Portland Slag cement. In addition, if the actual quantity of cement & super plasticizer required as per laboratory mix design varies from the quantity assumed above, necessary cost adjustment for deviation in the quantity of cement and super plasticizer as per mix design, if any, shall be done as per the rate of cement and super plasticizer in actual supply voucher from manufacturer/authorized dealer at the time of execution. In the case of authorized distributor, the rate may be authenticated by the manufacturer. The rate of cement and super plasticizer exclusive of GST shall only be considered for payment. | 23,265 | cum | - | - |
| 6 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources : 6 graded stone aggregate 20 mm nominal size derived from natural sources) | 2,507 | cum | - | - |
| 7 | Dismantling of cement concrete pavement by mechanical means using pneumatic tools, breaking to pieces not exceeding 0.02 cum in volume and stock piling at designated locations and disposal of dismantled materials up to a lead of 2000 metres, stacking serviceable and unserviceable materials separately | 299 | cum | - | - |
| 8 | Dismantling of flexible pavement (bituminuous courses) by mechanical means and disposal of dismantled material up to a lead of 1 kilometre, as per direction of Engineer-in-charge. | 8,265 | sqm | - | - |
| 9 | Centering and shuttering including strutting, propping etc. and removal of form for all heights: Foundation, footing, bases of columns etc., for mass concrete. | 631 | sqm | - | - |
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
BOQ_271998.xls
BOQ • 0.27 MB
173920893.pdf
Tender Documents • 0.28 MB
173920894.html
Tender Documents • 0.06 MB
TenderDocuments.pdf
Tender Documents • 17.55 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .