Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹10.1 LAccepted-Finance | ₹10.1 L | L1 | Accepted-Finance L1 |
| 2 | L2₹1.0 LRejected-Finance 1380 DNP DUMKA JHARKHAND | ₹1.0 L | L2 | Rejected-Finance L2 |
| 3 | L3₹10.5 LRejected-Finance 1380 DNP DUMKA JHARKHAND | ₹10.5 L | L3 | Rejected-Finance L3 |
| 4 | L4₹11.7 LRejected-Finance | ₹11.7 L | L4 | Rejected-Finance L4 |
Tender Value
₹15.0 L
EMD Value
₹30,100
Closing Date
18 Apr 2026, 5:00 pmClosed
EXECUTIVE OFFICER NAGAR PARISHAD DUMKA
EXECUTIVE OFFICER NAGAR PARISHAD DUMKA
Construction of R.C.C. slab from Ashok Jaiswal towards Sanjay Kumar Sah House Ward No. 11
2026_UDD_112377_1
UDD/DNP/02/2026-27 GR 02
Open Tender
Civil Works
90 days
NAGAR PARISHAD DUMKA
Please refer Tender documents.
2 documents required · 2 mandatory
₹5,000
₹30,100
3 Jun 2026
4 Apr 2026
20 Apr 2026
4 Apr 2026
18 Apr 2026
4 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Centaring and Shuttering including struting,Proping etcsuspended floors, roofs,landing, balconies and access platform. | - | M3 | - | - |
| 2 | Providing 12mm cement plaster (1:3) with clean coarse sand of F.M 1.5 including screening, curing with all leads and lilftsof water. Scaffolding taxes and royalty all complete as per specification and direction of E/I. (5.7.1) | - | M2 | - | - |
| 3 | Providing 1.5 mm cement punning including curing ,carriage of water with all leads and lifts as per building specification and Direction of E/I | - | M2 | - | - |
| 4 | Providing and laying R.C.C M-200 with nominal mix of (1:11/2:3) in deck slab BEAMS, Suspended floors roofs having slop up to 15° landings, balconies ,shelves, chajjas, lintel ,bands plain window sills, staircases and spiral stair cases above plinth level up to floor, excluding the cost of centering , shuttering , finishing and reinforcement , job as per specification and direction of E/I. (5.3.11) | - | M3 | - | - |
| 5 | Providing TMT bar reinforcement (tor) steel) as per approved design drawing, removal of rust, cutting, bending, including supplying annealed wire, placing M.S rods in position all complete job as per specification and direction of E/I.( 5.5.5) 12MM | - | MT | - | - |
| 6 | 10 MM | 1 | MT | 82,096.54 | ₹82,014.44 |
| 7 | Carriage of Materials:-(a) Sand lead 6 km | - | M3 | 211.06 | - |
| 8 | (b) Stone chips 52 km | - | M3 | 770.1 | - |
| 9 | GST 18% | 12,56,351.79 | NOS | 0.18 | ₹2,26,143.32 |
| 10 | LABOUR CESS 1% | - | NOS | 0.01 | - |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
finance_151731.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 5.52 MB
BOQ_151731.xls
BOQ • 0.23 MB
Download all tender documents and submit your bid