Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹19.0 LAccepted-AOC DOOR NO 3 92 VARAGANAPALLI VILLAGE NAGAMANGALAM POST DENKANIKOTTAI TALUK KRISHNAGIRI DISTRICT 635113 | DENKANIKOTTAI | KRISHNAGIRI | TAMIL NADU | 635113 | ₹19.0 L | L1 | Accepted-AOC Accept |
| 2 | L2₹19.3 LRejected-AOC | ₹19.3 L | L2 | Rejected-AOC Reject |
| Sl No | Description | Qty | Unit | SA Constructions L2 | T.Varadharaj Contractor L1 |
|---|---|---|---|---|---|
| 1.001. Strengthening of the road from Denkanikottai - Palayamkottai Road to Kendiganapalli km0/0-0/350 H/o Thavarakarai (R-207) Est Amt Rs. 19.34 | |||||
| 2.00Clearingthe Scrub jungle including all labour charges for burrying and burning etc., | |||||
| 3.00 | Km 0/0-0/350 | 374.87 | Sqm | 6.42 ₹2,406.67 | 6.36 ₹2,384.17 |
| 4.00Earth work excavation in all classes of soils except hard rock requiring blasting depositing on bank with initial lead of 10M and lift of 2M including all labour charges and incidental charges such as shoring, strutting, providing coffer dams, bailing out | |||||
| 5.00 | Km 0/0-0/350 | 140.58 | Cum | 141.78 ₹19,931.43 | 140.29 ₹19,721.97 |
| 6.00Providing and laying including cost and conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by power roller to achieve the required Proctor density at 100% compaction etc completed | |||||
| 7.00 | Km 0/0-0/350 | 62.48 | Cum | 344.58 ₹21,529.36 | 340.96 ₹21,303.18 |
| 8.00Picking 5 cm to 10 cm old metalled surface and sectioning - 1 sq.m | |||||
| 9.00 | Km 0/0-0/350 | 334.2 | Cum | 23.6 ₹7,887.12 | 23.35 ₹7,803.57 |
| 10.00Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 2 | |||||
Tender Value
₹19.3 L
EMD Value
₹20,000
Closing Date
26 Feb 2026, 3:00 pmClosed
The BDO Kelamangalam
The BDO Office Kelamangalam
KGI DT KLM BLK PACKAGE NO TN KLMG 01 Strengthening of the road from Denkanikottai - Palayamkottai Road to Kendiganapalli km0/0-0/350 H/o Thavarakarai R207 Est Amt Rs 1934000
2026_RDTN_666255_1
315/2021/E2 Dated 19/02/2026
Open Tender
Civil Works - Roads
THE BDO OFFICE KELAMANGALAM
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹20,000
Yes
14 Mar 2026
25 Feb 2026
26 Feb 2026
25 Feb 2026
26 Feb 2026
25 Feb 2026
1. Strengthening of the road from Denkanikottai - Palayamkottai Road to Kendiganapalli km0/0-0/350 H/o Thavarakarai (R-207) Est Amt Rs. 19.34
Clearingthe Scrub jungle including all labour charges for burrying and burning etc.,
Earth work excavation in all classes of soils except hard rock requiring blasting depositing on bank with initial lead of 10M and lift of 2M including all labour charges and incidental charges such as shoring, strutting, providing coffer dams, bailing out
Providing and laying including cost and conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by power roller to achieve the required Proctor density at 100% compaction etc completed
Picking 5 cm to 10 cm old metalled surface and sectioning - 1 sq.m
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 2
Providing and laying of prime coat using Emulsion at the rate of 7 Kg per ten square meter over the WMM surface preparatory to another bituminous construction over it.
Providing and laying Tack coat over WMM surface(treated with primer) using 2.5Kg of bitumen emulsion RS-1 for 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all
BC 25/30/40mm Thick (Grade-II) Using VG30 Bitumen and Plastic Waste Providing and laying Bituminous Concrete to 25/30/40mm thick using 0.13 cum of 19.00- 9.50mm, 0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 and below with 47.28kgs of VG30 bitumen and 3.02Kgs of Waste Plastic for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 507 of MORTH Rev-5
Provision for HM Stones of size 0.75m x 0.23m x 0.10m
Road marking with hot hot applied thermoplastic compound with reflectorising glass beads in bituminous surface
Provision of 1 nos. rumble strips covered with premix bituminous carpet, 15-20 mm high at centre, 250 mm wide placed at 1 m centre-to-centre at approved locations to control speed, marked with white strips of road marking paint.
Providing and Fixing reflective road studs of category A raised pavement markers made out of Poly carbonate / methyl methercrylate / ABS moulded body confirming to ASTM D 788 and reflective panels with micro prismatic lens capable of pro
Providing and erecting of Retro - reflectorized cautionary , Mandatory and Informatory signs (without definition board) made out of High Intensity Prismatic Grade Sheeting confirming to Type - IV standards of IRC - 67: 2012 and ASTM D -09, Specification
CONSTRUCTION OF 1.50M SPAN CULVERT @ CH:222m
Dismantling, clearing away and carefully stacking materials useful for re-use for any thickness of walls including all charges etc.
Dismantling Plain Cement Concrete
Cement concrete 1 : 4 : 8 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed
Supplying & Erecting centering for sides & soffiots including necessary supports & strutting upto 3.29m height for plane surfaces in all floors with all cross bracings using mild steel sheets of size 90 x 60cm & 10 gauge stiffened, welded with steel angle
Abutment Ist Footing
Cement concrete 1 : 3 : 6 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed. - Rate for 10 m3
Cement concrete 1 : 2 : 4 mix using 20mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.
Cement concrete 1:1.5:3 using 20mm ISS HBG metal for all RCC item of works excluding cost of Rein forcement and fabricating charges, centering and shuttering but including curing and providing fixtures like fan clamps in the RCC floor or roof slabs
Supplying and Fabricating and placing in position MS steel or Ribbed Tor Steel for all Reinforced Cement Concrete works as per the design given including cost of steel and binding wire in all floors etc, Complete complying with stanard specification.(MS
Providing and fixing 20mm Bitumen felt for expansion joint Between Dirtwall &Deck slab
Collection and supply of gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for filling etc.complete,
Providing weepholes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing
Provision for Name board charges
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.15 MB
PB1.pdf
Additional Documents • 0.86 MB
BOQ_800302.xls
BOQ • 0.34 MB
TB1.pdf
Tender Documents • 0.91 MB
Download all tender documents and submit your bid