| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.2 CrAccepted-Finance | ₹8.2 Cr | L1 | Accepted-Finance L1 |
| 2 | L2₹8.2 Cr+₹6,555.44 (<0.01%)Rejected-Finance | ₹8.2 Cr+₹6,555.44 (<0.01%) | L2 | Rejected-Finance L2 |
| 3 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Others-Tender Fee, EMD and Mandatory Site Visit Certificate has not been uploaded and received |
| Sl No | Description | Qty | Unit | P.T.T ENTERPRISE L1 | M/s Tagru Construction L2 |
|---|---|---|---|---|---|
| 1.00SH-1: Approach Road to Power House | |||||
| 2.00 | Excavation in Ordinary Rock with Dozer with lead upto 100 metres (Excavation for roadway in ordinary rock by deploying a dozer, 80 HP including cutting and pushing the cut earth to site of embankment upto a distance of 100 metres ( average lead 50 metres ), trimming bottom and side slopes in accordance with the requirements of lines, grades and cross-sections.) | 8,250 | Cu.m | 467 ₹38,52,750 Lowest | 467.1 ₹38,53,575 |
| 3.00 | Construction of Subgrade and Earthen Shoulders (Construction of subgrade and earthen shoulders with approvedmaterial obtained from borrowpits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2) | 866.25 | Cu.m | 450 ₹3,89,812.5 Lowest | 450 ₹3,89,812.5 Lowest |
| 4.00 | Dry Lean Cement Concrete Sub- base (Construction of dry lean cement concrete Sub- base over a prepared sub-grade with coarse and fine aggregate conforming to IS: 383, the size of coarse aggregate not exceeding 25 mm, aggregate cement ratio not to exceed 15:1, aggregate gradation after blending to be as per table 600-1, cement content not to be less than 150 kg/ cum, optimum moisture content to be determined during trial length construction, concrete strength not to be less than 10 Mpa at 7 days, mixed in a batching plant, transported to site, laid with a paver with electronic sensor, compacting with 8-10 tonnes vibratory roller, finishing and curing.) | 288.75 | Cu.m | 7,741.89 ₹22,35,470.74 Lowest | 7,741.89 ₹22,35,470.74 Lowest |
| 5.00 | Cement Concrete Pavement (Construction of un-reinforced, dowel jointed, plain cement concrete pavement over a prepared sub base with 43 grade cement @ 400 kg per cum, coarse and fine aggregate conforming to IS 383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a batching and mixing plant as per approved mix design, for M40 Grade having minimum 28 days flexural strength of 4.5 Mpa, using approved admixtures, transported to site, laid with a fixed form or slip form paver, spread, compacted and finished in a continuous operation including provision of contraction, expansion, construction and longitudinal joints, joint filler, separation membrane, sealant primer, joint sealant, debonding strip, dowel bar, tie rod, admixtures as approved, curing compound, finishing to lines and grades as per drawing). | 288.75 | Cu.m | 15,486.74 ₹44,71,796.18 Lowest | 15,487 ₹44,71,871.25 |
| 6.00 | Surface Drains in Ordinary Rock (Construction of unlined surface drain of average cross sectional area0.4 sqm in ordinary rock to specified lines, grades, levels and dimensions as per approved design and to the requirement of clause 301 to 309. Excavatedmaterial to be used in embankment at site.): (a) Mechanical Means | 550 | Mtr. | 234 ₹1,28,700 Lowest | 234 ₹1,28,700 Lowest |
| 7.00SH-2: Bailey Bridge (Built up Steel Girder Bridge Span 15 m) | |||||
| 8.00A. Abutment and Wing Wall | |||||
| 9.00Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material. | |||||
| 10.00 | a) Marshy soil | 410.08 | Cu.m | 320 ₹98,419.2 Lowest | 321 ₹98,726.76 |
Tender Value
Refer Docs
EMD Value
₹8.2 L
Closing Date
30 Mar 2026, 10:00 amClosed
EE, Subansiri Hydro Power Division, DHPD, Ziro
O/o EE, Subansiri Hydro Power Division, DHPD, Ziro
C/o Approach Road to power house, Bailey Bridge (span 20 m), Staff Quarters (Type-III-2 nos. and Type-II Double storied four units-2 nos.), Compound Wall and Retaining Wall w.r.t Paley MHS (2 x 250 kW) near Tali ADC Hq, Kra Daadi District.
2026_HPDAP_3291_1
NIT No. SHPD/HPD/W-19/2025-26/02
Open Tender
Civil Works
Item Rate
740 days
Tali, Kra Daadi District A.P.
Please refer NIT for Eligibility Criteria Details
5 documents required · 5 mandatory
₹1,500
EE, Subansiri Hydro Power Division, DHPD, Ziro
₹8.2 L
O/o EE, Subansiri Hydro Power Division, DHPD, Ziro
30 Mar 2026
24 Mar 2026
30 Mar 2026
24 Mar 2026
30 Mar 2026
24 Mar 2026
24 Mar 2026 - 24 Mar 2026
24 Mar 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1SH-1: Approach Road to Power House | |||||
| - | Excavation in Ordinary Rock with Dozer with lead upto 100 metres (Excavation for roadway in ordinary rock by deploying a dozer, 80 HP including cutting and pushing the cut earth to site of embankment upto a distance of 100 metres ( average lead 50 metres ), trimming bottom and side slopes in accordance with the requirements of lines, grades and cross-sections.) | - | Cu.m | - | - |
| - | Construction of Subgrade and Earthen Shoulders (Construction of subgrade and earthen shoulders with approvedmaterial obtained from borrowpits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2) | - | Cu.m | - | - |
| - | Dry Lean Cement Concrete Sub- base (Construction of dry lean cement concrete Sub- base over a prepared sub-grade with coarse and fine aggregate conforming to IS: 383, the size of coarse aggregate not exceeding 25 mm, aggregate cement ratio not to exceed 15:1, aggregate gradation after blending to be as per table 600-1, cement content not to be less than 150 kg/ cum, optimum moisture content to be determined during trial length construction, concrete strength not to be less than 10 Mpa at 7 days, mixed in a batching plant, transported to site, laid with a paver with electronic sensor, compacting with 8-10 tonnes vibratory roller, finishing and curing.) | - | Cu.m | - | - |
| - | Cement Concrete Pavement (Construction of un-reinforced, dowel jointed, plain cement concrete pavement over a prepared sub base with 43 grade cement @ 400 kg per cum, coarse and fine aggregate conforming to IS 383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a batching and mixing plant as per approved mix design, for M40 Grade having minimum 28 days flexural strength of 4.5 Mpa, using approved admixtures, transported to site, laid with a fixed form or slip form paver, spread, compacted and finished in a continuous operation including provision of contraction, expansion, construction and longitudinal joints, joint filler, separation membrane, sealant primer, joint sealant, debonding strip, dowel bar, tie rod, admixtures as approved, curing compound, finishing to lines and grades as per drawing). | - | Cu.m | - | - |
| - | Surface Drains in Ordinary Rock (Construction of unlined surface drain of average cross sectional area0.4 sqm in ordinary rock to specified lines, grades, levels and dimensions as per approved design and to the requirement of clause 301 to 309. Excavatedmaterial to be used in embankment at site.): (a) Mechanical Means | - | Mtr. | - | - |
| - | SH-2: Bailey Bridge (Built up Steel Girder Bridge Span 15 m) | - | - | - | - |
| - | A. Abutment and Wing Wall | - | - | - | - |
| - | Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material. | - | - | - | - |
| - | a) Marshy soil | - | Cu.m | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.19 MB
BOQ_3487.xls
BOQ • 0.49 MB
SBD-PaleyWorks-Final.pdf
Tender Documents • 4.95 MB
CorrigendumAndBOQfile.rar
PDF • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .