| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.3 CrAdmitted-Finance | ₹1.3 Cr | L1 | Admitted-Finance |
| 2 | L2₹1.4 Cr+₹8.8 L (6.53%)Admitted-Finance | ₹1.4 Cr+₹8.8 L (6.53%) | L2 | Admitted-Finance |
| Sl No | Description | Qty | Unit | N.Premkumar L1 | N RAJENDRAN L2 |
|---|---|---|---|---|---|
| 1.00 | 1.Strengthening of the road from Siruvalur to Kurichinatham road Km 0/0 - 3/620
Clearing the Scrub jungle including removal from site, disposal by buring etc., complete as directed by the departmental officers | 7,588.77 | Sqm | - | - |
| 2.00 | Earth work excavation and depositing on bank within initial lead of 10m & initial lift of 2m in hard stiff clay, stiff black cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders SS .20.A | 1,463.18 | Cum | - | - |
| 3.00 | Picking the old BT surface and Metal surface including all labour charges etc., | 3,266 | Sqm | - | - |
| 4.00Providing and Laying Gravel to compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by Power roller to achieve the required Proctor density at 100% compaction | |||||
| 4.01 | Km 0/0 - 1/0 | 67.01 | Cum | - | - |
| 4.02 | Km 1/0 - 2/0 | 45 | Cum | - | - |
| 4.03 | Km 2/0 - 3/0 | 67.5 | Cum | - | - |
| 4.04 | Km 3/0 - 3/620 | 41.85 | Cum | - | - |
| 5.00Providing and laying Water Bound Macadam Grading - III (63mm to11.20mm) IRC HBG of 75mm consolidated thickness consisting of clean, crushed aggregates mechanincally interlocked by rolling and bonding together with screening binding material of 0.24 cum for 10 sqm (the material passing 425 microns sieve shall have liquid limit and plasticity index not more than 20 & 6% repectively) and finished in accordance with the requirements of the specification and thickness as per approved plans or as directed by the Engineer as per clause 405 of MORD revision I (Mix -in - place method) | |||||
| 5.01 | Km 0/0 - 1/0 | 279.22 | Cum | - | - |
Tender Value
₹1.4 Cr
EMD Value
₹1.4 L
Closing Date
20 Nov 2019, 3:00 pmClosed
Project Director
DRDA, Collectorate, Ariyalur
Strengthening of roads 3 Nos in Package No. TN 30-01 in Ariyalur Block of Ariyalur District under TNRRIS 2019-20
2019_RDTN_144427_1
A3/4972/2019, Date.31.10.2019
Open Tender
Civil Works - Roads
Works
180 days
DRDA
As per tender document
4 documents required · 4 mandatory
₹0
₹1.4 L
DRDA, Ariyalur
14 Jan 2020
7 Nov 2019
20 Nov 2019
7 Nov 2019
20 Nov 2019
7 Nov 2019
12 Nov 2019
Amount
1.Strengthening of the road from Siruvalur to Kurichinatham road Km 0/0 - 3/620 Clearing the Scrub jungle including removal from site, disposal by buring etc., complete as directed by the departmental officers
Earth work excavation and depositing on bank within initial lead of 10m & initial lift of 2m in hard stiff clay, stiff black cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders SS .20.A
Picking the old BT surface and Metal surface including all labour charges etc.,
Providing and Laying Gravel to compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by Power roller to achieve the required Proctor density at 100% compaction
Providing and laying Water Bound Macadam Grading - III (63mm to11.20mm) IRC HBG of 75mm consolidated thickness consisting of clean, crushed aggregates mechanincally interlocked by rolling and bonding together with screening binding material of 0.24 cum for 10 sqm (the material passing 425 microns sieve shall have liquid limit and plasticity index not more than 20 & 6% repectively) and finished in accordance with the requirements of the specification and thickness as per approved plans or as directed by the Engineer as per clause 405 of MORD revision I (Mix -in - place method)
Providing and laying Tack Coat over WBM surface at 3.00 Kg of RS-1 Bitumen Emulsion /10 sq.m including labour for spraying, hire charges for bitumen sprayer etc. Complete.
Providing and laying Tack Coat over WBM surface at 4.00 Kg of RS-1 Bitumen Emulsion /10 sq.m including labour for spraying, hire charges for bitumen sprayer etc. Complete.
Providing and layiing pre-mix carpet 20mm thickness using 0.18cum of 13.2 IRC machine crushed metal 0.09cum of 11.2mm IRC machine crushed metal with 14.60Kg of Bitumen for pre-mixing 10 sqm of pre-mix carpet and laying separately Seal coat type "A" using .09 cum of 6.70mm IRC HBG chips with 9.80 Kg of Bitumen for 10sqm including cost and conveyance of materials to the departmental metric gauge for pre-measurement heating the bitumen boiler heating the aggregate and mixing them with bitumen in mini hot mix plant for pre-mix carpet and rolling by 80-100 KN power roller including labour charges for spreading hire and fuel charges for mini hot mix plant, bitumen boiler, all other tools and plants employed etc., complete
Provision for Sign board
Provision for Km stone
Provision for Hm stone
Provision for Name board
2.Strengthening of the road from Vaippam - Karruppaiyakovil to Aranur Kottakadu road Km 0/0 - 1/280 Clearing the Scrub jungle including removal from site, disposal by buring etc., complete as directed by the departmental officers
Earth work excavation and depositing on bank within initial lead of 10m & initial lift of 2m in hard stiff clay, stiff black cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders SS .20.A
Picking the old BT surface and Metal surface including all labour charges etc.,
Providing and Laying Gravel to compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by Power roller to achieve the required Proctor density at 100% compaction
Providing and laying Water Bound Macadam Grading - III (63mm to11.20mm) IRC HBG of 75mm consolidated thickness consisting of clean, crushed aggregates mechanincally interlocked by rolling and bonding together with screening binding material of 0.24 cum for 10 sqm (the material passing 425 microns sieve shall have liquid limit and plasticity index not more than 20 & 6% repectively) and finished in accordance with the requirements of the specification and thickness as per approved plans or as directed by the Engineer as per clause 405 of MORD revision I (Mix -in - place method)
Providing and laying Tack Coat over WBM surface at 4.00 Kg of RS-1 Bitumen Emulsion /10 sq.m including labour for spraying, hire charges for bitumen sprayer etc. Complete.
Providing and layiing pre-mix carpet 20mm thickness using 0.18cum of 13.2 IRC machine crushed metal 0.09cum of 11.2mm IRC machine crushed metal with 14.60Kg of Bitumen for pre-mixing 10 sqm of pre-mix carpet and laying separately Seal coat type "A" using .09 cum of 6.70mm IRC HBG chips with 9.80 Kg of Bitumen for 10sqm including cost and conveyance of materials to the departmental metric gauge for pre-measurement heating the bitumen boiler heating the aggregate and mixing them with bitumen in mini hot mix plant for pre-mix carpet and rolling by 80-100 KN power roller including labour charges for spreading hire and fuel charges for mini hot mix plant, bitumen boiler, all other tools and plants employed etc., complete
Provision for Km stone
Provision for Hm stone
Provision for Name board
3.Strengthening of the road from Melakaruppur - Elakurichi - Kallakudi - Vannarapettai - Pappankulam road Km 0/0 - 2/160 Earth work excavation and depositing on bank within initial lead of 10m & initial lift of 2m in hard stiff clay, stiff black cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders SS .20.A
Clearing the Scrub jungle including removal from site, disposal by buring etc., complete as directed by the departmental officers
Picking the old BT surface and Metal surface including all labour charges etc.,
Providing and Laying Gravel to compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by Power roller to achieve the required Proctor density at 100% compaction
Providing and laying Water Bound Macadam Grading - III (63mm to11.20mm) IRC HBG of 75mm consolidated thickness consisting of clean, crushed aggregates mechanincally interlocked by rolling and bonding together with screening binding material of 0.24 cum for 10 sqm (the material passing 425 microns sieve shall have liquid limit and plasticity index not more than 20 & 6% repectively) and finished in accordance with the requirements of the specification and thickness as per approved plans or as directed by the Engineer as per clause 405 of MORD revision I (Mix -in - place method)
Providing and laying Tack Coat over WBM surface at 4.00 Kg of RS-1 Bitumen Emulsion /10 sq.m including labour for spraying, hire charges for bitumen sprayer etc. Complete.
Providing and layiing pre-mix carpet 20mm thickness using 0.18cum of 13.2 IRC machine crushed metal 0.09cum of 11.2mm IRC machine crushed metal with 14.60Kg of Bitumen for pre-mixing 10 sqm of pre-mix carpet and laying separately Seal coat type "A" using .09 cum of 6.70mm IRC HBG chips with 9.80 Kg of Bitumen for 10sqm including cost and conveyance of materials to the departmental metric gauge for pre-measurement heating the bitumen boiler heating the aggregate and mixing them with bitumen in mini hot mix plant for pre-mix carpet and rolling by 80-100 KN power roller including labour charges for spreading hire and fuel charges for mini hot mix plant, bitumen boiler, all other tools and plants employed etc., complete
Provision for Km stone
Provision for Hm stone
Provision for Name board
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
N RAJENDRAN
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.92 MB
BOQ_173343.xls
BOQ • 0.30 MB
TechnicalBid1.pdf
Tender Documents • 0.34 MB
PriceBid1.pdf
Tender Documents • 0.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .