Loading…
Loading…
Tender Value
₹2.3 L
EMD Value
₹6,750
Closing Date
24 Jul 2026, 4:00 pm
Executive Engineer ID Ompora
Executive Engineer ID Ompora
Construction of lining wall on left side of Chattergam canal in Dadwan Mohalla u/s of Culvert.
2026_IFC_314589_6
enit2of072026
Open Tender
Civil Works
15 days
Budgam
Please refer Tender documents.
6 documents required · 6 mandatory
₹200
Chief Engineer Kmr I and FC Deptt.
₹6,750
Yes
4 Jul 2026
4 Jul 2026
25 Jul 2026
4 Jul 2026
24 Jul 2026
4 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in bulk excavation by mechanical means (hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. All kinds of soil : | 46.28 | cum | 187.3 | ₹8,668.24 |
| 2 | Dumping stone excluding cost of stones. in Horizontal on level | 5.33 | cum | 237.9 | ₹1,268.01 |
| 3 | Supplyof stone soling (nallah) nominal size 225 mm | 5.33 | cum | 700 | ₹3,731 |
| 4 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) | 26.1 | cum | 5,733.6 | ₹1,49,646.96 |
| 5 | Centering and shuttering including strutting, propping etc. and removal of form work for: Foundations, footings, bases of columns etc. for mass concrete. | 104.4 | sqm | 286.35 | ₹29,894.94 |
| 6 | 12mm Cement plaster of mix: 1 : 4 ( 1 cement : 4 coarse sand) | 52.2 | Sqm | 283.8 | ₹14,814.36 |
| 7 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead upto 50 m and lift upto 1.5 m. | 20.88 | cum | 218.4 | ₹4,560.19 |
| 8 | Carriage of Materials from source upto road site by Mechanical transport including cost of loading unloading and stacking.
Stone soling from Doodhganga av lead of 05 km | 5.33 | cum | 236.16 | ₹1,258.73 |
| 9 | 20 mm Aggregate from Chadoora avg. lead of 05 kms | 23.23 | Cum | 200.74 | ₹4,663.19 |
| 10 | Sand from Marval avg. lead of 15 kms . | 12.37 | Cum | 344.49 | ₹4,261.34 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 6.36 MB
BOQ_1018666.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid