Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹12.7 LAdmitted-Finance | -15.00% | ₹12.7 L | L1 | Admitted-Finance |
| 2 | L2₹14.8 L+₹2.1 L (16.4%)Admitted-Finance | -1.10% | ₹14.8 L+₹2.1 L (16.4%) | L2 | Admitted-Finance |
| 3 | L3₹14.9 L+₹2.2 L (17.4%)Admitted-Finance HARDAHA BALUWA VARANASI CHANDAULE | -0.25% | ₹14.9 L+₹2.2 L (17.4%) | L3 | Admitted-Finance |
Tender Value
₹15.0 L
EMD Value
₹1.5 L
Closing Date
3 Aug 2026, 3:00 pmClosed
chief engineer
chief engineer
Construction of cc road from purv nirmit cc road to skbar chai wala for ramzanpura at ward no. 08
2026_NNSAH_1170332_1
6180 B
Open Tender
Civil Works
Percentage
30 days
saharanpur
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,298
₹1.5 L
9 Sept 2026
20 Jul 2026
4 Aug 2026
20 Jul 2026
3 Aug 2026
20 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismenteling of old brick work including labour T&P etc all complete (S.I. no 692) | 32.55 | m3 | 400 | ₹13,020 |
| 2 | Excavation in foundation in ordinary soil (Loam, clay or sand) Including lift upto 1.50 M and lead upto 30 M and including filing watering and rammind of excacated earth into the treaches or into the space between the building and the sides of foundation trenchs or into the plinth and removal and disposal of surplus earth as directed by the engineer in charge upto a distance of 30 M from the foundation trenches SOR UP PWD S1-251A) | 120.9 | cum | 90 | ₹10,881 |
| 3 | Concrete with 4 cm gauge brick ballast fine sand and cement in proportion are 1:6:12 in foundation and under floors, including supply of all materials, labour. T&P etc. required for proper completion the work | 20.15 | cum | 2,985 | ₹60,147.75 |
| 4 | Construction of granular sub base by providing cloase garded material conforming to specification in all complete work | 72.85 | cum | 2,015 | ₹1,46,792.75 |
| 5 | M-150 Brick work in 1:4 one cement and four course sand, mortar in foundation in plinth including supply of all material labour, T &P etc. required for proper completion of the work. | 42.78 | cum | 4,690 | ₹2,00,638.2 |
| 6 | 12 mm thick plaster with cement and approved c sand mortar in 1:4 over brick work minium thickness not to be less than 1 Cm including supply of all material labour Tool & Plants etc. required for proper completion of the work. | 186 | sqm | 165 | ₹30,690 |
| 7 | R.C.C. Work with cement, approved coarse sand & 2 cm gauge approved stone grit in proportions of 1:1.5:3 in slab/ nall with all comp of work | 2.43 | m3 | 7,400 | ₹17,982 |
| 8 | M.S. (tor steel or plain) in Plain work such as R.C.C. or R.B. work including bending for proper shape and including supply of steel & its wastage, bend, hooks, and authorised overlapping shall be measured and including cost of binding wire. | 190.76 | qtl | 85.29 | ₹16,269.92 |
| 9 | Cement Concrete with 2 cm gauge approved graded stoneee grit, coarse sand and cement in the proportion of 4:2:1, including supply of all materials, labour, tools & plants etc required for proper completion of the work As per direction of E/I. | 5.03 | cum | 5,750 | ₹28,922.5 |
| 10 | C.C. 1:1.5:3 cement course sand and 20 mm gauge stone grit with micron polythene (without dovel bar) all work complete | 109.27 | cum | 7,300 | ₹7,97,687.79 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 11.28 MB
BOQ_2196066.xls
BOQ • 0.23 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .