Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹19.1 LAdmitted-Finance | -6.96% | ₹19.1 L | L1 | Admitted-Finance |
Tender Value
₹20.6 L
EMD Value
₹41,112
Closing Date
7 Aug 2026, 12:00 pmClosed
DEPUTY CONSERVATOR OF FOREST, TONK
DEPUTY CONSERVATOR OF FOREST, TONK
SMC Work IN Different Ranges of Tonk Division
2026_FORES_580374_1
NIT 16/2026-27 DCF TONK
Open Tender
Civil Works
Percentage
60 days
Different Ranges of tonk
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,000
As Per NIt
₹41,112
Yes
11 Aug 2026
31 Jul 2026
7 Aug 2026
31 Jul 2026
7 Aug 2026
31 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1WHS-III GHATI | |||||
| 1.01 | Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth upto 30 cm measured at a height of 1 m above ground level and removal of rubbish upto a distance of 50 m outside the periphery of the area cleared. | 1,500 | sqm | 5 | ₹7,500 |
| 1.02 | Earth work in excavation by mechanical means (Hydraulic excavator )/ manual means over areas (exceeding 30cm in depth. 1.5m in width as well as 10 sqm on plan) including disposal of excavated earth, lead upto 50m and lift upto 1.5 m , disposed earth to be levelled and neatly dressed : All kinds of soil | 180.69 | cum | 175 | ₹31,620.75 |
| 1.03 | Providing and laying in position cement concrete including curing, compaction etc. complete in specified grade excluding the cost of centering and shuttering - All work up to plinth level. 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) | 36.52 | cum | 3,302 | ₹1,20,589.04 |
| 1.04 | Random Rubble stone masonry for with hard stone in foundation and plinth in Cement Sand mortar above 30 CM thick wall in. foundation ratio Cement Mortar 1:6 ( 1-Cement : 6-Sand) | 132.85 | cum | 2,838 | ₹3,77,028.3 |
| 1.05 | Random Rubble stone masonry with hard stone in superstructure above plinth level and upto five level above 30cm. thick walls in. superstructure ratio Cement Mortar 1:6 ( 1-Cement : 6-Sand) | 87.16 | Nos | 3,479 | ₹3,03,229.64 |
| 1.06 | Providing & fixing precast cement concrete coping 1 : 2 : 4 mix 50mm thick complete as per specification : | 49.58 | sqm | 367 | ₹18,195.86 |
| 1.07 | Providing and laying in position cement concrete including curing, compaction etc. complete in specified grade excluding the cost of centering and shuttering - All work up to plinth level.
"M15 grade Nominal Mix
1: 2: 4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20mm nominal size)." | 3.06 | Nos | 4,624 | ₹14,149.44 |
| 1.08 | Plaster on new surface on walls in cement sand mortar 1:4 including racking of joints etc. complete fine finish : 25 mm thick. | 218.52 | sqm | 227 | ₹49,604.04 |
| 1.09 | Earth work for bunds and embankment,dry or moist soil ,with the help of tractor attached with scraper including layer of 15cm breaking of clods, sorting of grasses pebbles etc. and dressing in required profile when compacted manually wthin initial lead of 30m and lift 1.5m of tractor (35-40hp) with POL and scraper (excluding the charger if water and compaction ) FPR JAIPUR BSR in Soft/ordinary soil ch.6 6.2.1.1 | 900 | cum | 86 | ₹77,400 |
stage.html
html • 0.02 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 9.98 MB
BOQ_1031245.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .