Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹36.5 LAdmitted-Finance | -5.00% | ₹36.5 L | L1 | Admitted-Finance |
| 2 | Not Admitted-Fee/PreQual/Technical | - | - | - | Not Admitted-Fee/PreQual/Technical No EMD or Fee received |
| 3 | Not Admitted-Fee/PreQual/Technical | - | - | - | Not Admitted-Fee/PreQual/Technical No EMD or Fee received |
Tender Value
₹38.4 L
EMD Value
₹76,800
Closing Date
17 Aug 2026, 9:30 amClosed
EO MUNICIPAL BOARD MERTA CITY
EO MUNICIPAL BOARD MERTA CITY
Supply of Good Earth and Grass Work at Proposed Stadium Site
2026_DLB_584574_1
NIT-NO-14/2026-27 EO MUNICIPAL BOARD MERTA CITY
Open Tender
Civil Works
Percentage
120 days
MERTA CITY
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
EO MUNICIPAL BOARD MERTA CITY/MD RISL JAIPUR
₹76,800
Yes
19 Aug 2026
8 Aug 2026
17 Aug 2026
8 Aug 2026
17 Aug 2026
8 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Supplying and stacking good earth at site of work | 1,800 | Cum | 324.5 | ₹5,84,100 |
| 2 | Carriage of eart material, lead - Beyond 10 Km. upto 20 Km. per Km. | 1,800 | Cum | 491.77 | ₹8,85,186 |
| 3 | Supply at site of work well decayed farm yard manure, from any available source, approved by the engineer in-charge including screening and stacking. | 900 | Cum | 698 | ₹6,28,200 |
| 4 | Filling mixture of earth and sludge farm-yard manure in the desired proportion in trenches, flooding with water and levelling (cost of supplying earth and sludge or farm yard manure and labour for mixing not included in this rate). | 18,000 | Sqm | 17.1 | ₹3,07,800 |
| 5 | Grassing with 'Doobs' grass including watering and maintenance of the lawn for 30 days or more till the grass forms a thick lawn freefrom weeds and fit for moving including supplying good earth if needed. (The good earth shall be paid separately) In rows 7.5 cm apart in either direction | 18,000 | Sqm | 64.5 | ₹11,61,000 |
| 6 | Labour Charges for Grassing with 'Carpet' grass (selection no. 1)/'Doobs' grass including watering and maintenance of the lawn for 30 days or more till the grass forms a thick lawn free from weeds and fit for moving including supplying good earth if needed.(The good earth shall be paid separately) In rows 5 cm apart in either direction | 18,000 | Sqm | 15.2 | ₹2,73,600 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.14 MB
BOQ_1038375.xls
BOQ • 0.33 MB
CorrigendumENIT12131415161718MertaII.pdf
PDF • 0.38 MB
AACORGENDUMMERTA.pdf
PDF • 0.37 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .