Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹25.3 LAccepted-AOC PUDUCHERRY 605005 | PONDICHERRY | PUDUCHERRY | 605005 | ₹25.3 L | L1 | Accepted-AOC Found in order. |
| 2 | L2₹26.5 L+₹1.2 L (4.57%)Rejected-Finance | ₹26.5 L+₹1.2 L (4.57%) | L2 | Rejected-Finance Rejected due to L2 |
| 3 | L3₹27.0 L+₹1.7 L (6.77%)Rejected-Finance | ₹27.0 L+₹1.7 L (6.77%) | L3 | Rejected-Finance Rejected due to L3 |
Tender Value
Refer Docs
EMD Value
₹55,827
Closing Date
20 Feb 2023, 3:30 pmClosed
Executive Engineer
Port Department No.1, Dumas Street, Pondicherry
De-silting at the Turning Circle of the Entrance channel at New Port to facilitate unhindered movement of Cargo/Fishing Vessels.
2023_PORT_11965_1
3368 / PORT/EE/AE.M/De-silt/2022-23
Open Tender
Miscellaneous Works
Works
40 days
New Port
Please refer Tender Document
2 documents required · 2 mandatory
₹525
₹55,827
21 Jul 2023
13 Feb 2023
20 Feb 2023
13 Feb 2023
20 Feb 2023
13 Feb 2023
Amount
De-silting at the Turning Circle of the Entrance Channel
Code No. 30.37 De-silting at the Turning Circle of the Port Navigational channel by removing silt, slush and debris from the bed of the channel complete in unhygienic and foul condition by mechanical means. The De-silting work shall be done to the required depth by engaging heavy machineries such as Excavator, loader and Crane mounted on floater and any other special type of machineries required for the work. The De-silting is to be done alongside the flowing channel in the area West of the submarine tunnel. The removal is to be done during low tide period and dumped at a distance far away from the bank of the channel to avoid the de-silted sand flowing back into channel during high tide period. The removed materials should be conveyed and dumped at the nearest stacking point at New Port within a lead of 1KM without polluting the environment. The payment shall be made based on the topo level measurements which shall be taken before and after de-silting. The levelling and other survey works shall be arranged by the Contractor at his own cost. (Note: The operation of the equipments will be in sea water condition and it is the responsibility of the contractor to take care of the safety of his equipments against tidal variation and changing sea condition. No claim for damage to the contractor’s equipments on account of the nature of operation, Tidal variation or sea condition will be allowed) The rate quoted should be inclusive of Diesel cost, men, machineries and other necessary supporting accessories and GST.
Dynamic Engineers
K.T. Constructions
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .