Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹59.2 LAccepted-AOC | ₹59.2 L | L1 | Accepted-AOC Accepted |
| 2 | L2₹59.7 LRejected-AOC | ₹59.7 L | L2 | Rejected-AOC Rejected |
| Sl No | Description | Qty | Unit | C.Thangachamy L2 | KANAGAVEL RATHINAM L1 |
|---|---|---|---|---|---|
| 1.01 | Clearing the Scrub Jungle with uprooting inclduing all cutting charges and depositing of the products with clearing from the site as directed by offcers with all standard specifications etc | 1,755 | sqm | 7 ₹12,285 | 6.36 ₹11,161.80 |
| 1.02 | Construction and supply of gritty gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for spreading and compaction with power roller including all labour cost etc
Km 0/0-1/0 | 292.5 | Cum | 511 ₹1.5 L | 510 ₹1.5 L |
| 1.03 | Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) 100 mm thick, including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory Soil Compactor to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as pwe clause 406 of MORTH Rev-5 | 735.38 | Cum | 2,580 ₹19.0 L | 2,573 ₹18.9 L |
| 1.04 | Applying of prime coat using Emulsion(SS1) at the rate of 7 Kg /10 Sqm over the WMM surface preparatory to another bituminous construction over it. which will be supplied departmentally at section stores and cost of which will be recovered at the rates as per special conditions appended herewith including conveyance of bituminous emulsion to actual work spot handling charges including labour charges for brushing, cleaning and preparing the surface for laying the tack coat and labour and machinery charges for applying the required quantity of bituminous emulsion including hire, fuel and running charges for all tools and plants employed for the work including all other incidental charges such as barricading and providing danger lights, flags etc., complete as per standard specification. | 7,353.75 | sqm | 91 ₹6.7 L | 87 ₹6.4 L |
| 1.05 | Providing and laying Tack coat over WMM surface(treated with primer) using 2.5Kg of bitumen emulsion RS-1 for 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., | 7,353.75 | sqm | 20 ₹1.5 L | 19 ₹1.4 L |
| 1.06 | Providing and laying Bituminous Concrete to 25/30/40mm thick using 0.13 cum of 19.00- 9.50mm, 0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 and below with 50.30kgs of VG30 bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as
per specification using CMP as per clause 507 of MORTH Rev-5 | 183.85 | Cum | 11,885 ₹21.9 L | 11,882 ₹21.8 L |
| 2.00 | GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package} | 1 | GST Amount (in Rupees) | 9,10,864.15 ₹9.1 L | 9,02,965.09 ₹9.0 L |
Tender Value
Refer Docs
EMD Value
₹60,000
Closing Date
18 Feb 2026, 3:00 pmClosed
BLOCK DEVELOPMENT OFFICER (BP) THENI
BLOCK DEVELOPMENT OFFICER (BP) THENI
Providing BT Road from Pusumai Nagar Road at Ch 0/0-1/950 Km DPGF 2025-2026
2026_RDTN_654578_1
369/2026/A.6
Open Tender
Civil Works
120 days
THENI
Please refer Tender documents.
6 documents required · 6 mandatory
₹0
₹60,000
18 Feb 2026
11 Feb 2026
18 Feb 2026
11 Feb 2026
18 Feb 2026
11 Feb 2026
Clearing the Scrub Jungle with uprooting inclduing all cutting charges and depositing of the products with clearing from the site as directed by offcers with all standard specifications etc
Construction and supply of gritty gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for spreading and compaction with power roller including all labour cost etc Km 0/0-1/0
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) 100 mm thick, including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory Soil Compactor to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as pwe clause 406 of MORTH Rev-5
Applying of prime coat using Emulsion(SS1) at the rate of 7 Kg /10 Sqm over the WMM surface preparatory to another bituminous construction over it. which will be supplied departmentally at section stores and cost of which will be recovered at the rates as per special conditions appended herewith including conveyance of bituminous emulsion to actual work spot handling charges including labour charges for brushing, cleaning and preparing the surface for laying the tack coat and labour and machinery charges for applying the required quantity of bituminous emulsion including hire, fuel and running charges for all tools and plants employed for the work including all other incidental charges such as barricading and providing danger lights, flags etc., complete as per standard specification.
Providing and laying Tack coat over WMM surface(treated with primer) using 2.5Kg of bitumen emulsion RS-1 for 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc.,
Providing and laying Bituminous Concrete to 25/30/40mm thick using 0.13 cum of 19.00- 9.50mm, 0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 and below with 50.30kgs of VG30 bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 507 of MORTH Rev-5
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.64 MB
Tendernotice_2.pdf
PDF • 0.74 MB
BOQ_784885.xls
BOQ • 0.23 MB
Download all tender documents and submit your bid