| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.9 CrAccepted-Finance | ₹1.9 Cr | L1 | Accepted-Finance The bidder has quoted all the rates respectively |
| 2 | L2₹2.0 Cr+₹7.1 L (3.70%)Accepted-Finance | ₹2.0 Cr+₹7.1 L (3.70%) | L2 | Accepted-Finance The bidder has quoted all the rates respectively |
| Sl No | Description | Qty | Unit | JP CONSTRUCTION L2 | P.S.R. CONSTRUCTION L1 |
|---|---|---|---|---|---|
| 1.00Dismantling and removing the existing cutstone masonry wall including numbering the cut stone members such as Pavukal, Uthiram, Pillar, Pothiyal etc.,and stacking the same at the place as directed by the officers in charge within the temple campus without hinderence for execution of work including all labour charges and hire charges for tools and plants involved to do the work etc complete, as per department instructions. | |||||
| 1.01 | For Outer Vari-Uba Peedam | 529 | Sqm | 1,800 ₹9,52,200 | 1,730 ₹9,15,170 Lowest |
| 1.02 | For Outer Vari-Bothiyal | 17 | Sqm | 1,800 ₹30,600 | 1,730 ₹29,410 Lowest |
| 1.03 | Pillar, Bothiyal, Uthiram | 9 | Sqm | 5,750 ₹51,750 | 5,680 ₹51,120 Lowest |
| 1.04 | Pavukkal | 61 | Sqm | 1,800 ₹1,09,800 | 1,720 ₹1,04,920 Lowest |
| 1.05 | Cut stone flooring unsized | 49 | Sqm | 580 ₹28,420 | 530 ₹25,970 Lowest |
| 2.00 | Dismantling brick/stone masonry work in lime mortar including all labour charges required and all tools and plants required etc., complete. | 41 | Cum | 270 ₹11,070 | 240 ₹9,840 Lowest |
| 3.00Earth work excavation for foundation in all classes of soils and sub soils and todepth as may be directed except in hard rock, requiring blasting, including infinal leads and lifts and re-filling the sides of foundation, with excavated earth in 150mm layers well watered rammed and consolidated, including depositing surplus earth clearing and levelling the site, shoring shuttering baling out water wherever necessary etc., complete complying with standard specification. | |||||
| 3.01 | Hard Kankar Soil | 393 | Cum | 450 ₹1,76,850 | 400 ₹1,57,200 Lowest |
| 3.02 | Ordinary soil | 88 | Cum | 250 ₹22,000 Lowest | 250 ₹22,000 Lowest |
Tender Value
₹1.9 Cr
EMD Value
₹1.1 L
Closing Date
5 Nov 2025, 3:00 pmClosed
Executive Office IV
Arulmigu Kathali Narasinga Perumal Temple at Ammaiyanayakanur Nilakottai Taluk Dindigul District
Dismantling and Reconstruction of damaged portions of Tank wall, Steps and Maiya mandabam and providing chain link fencing in the temple tank belongs to Arulmigu Kathali Narasinga Perumal Temple at Ammaiyanayakanur Nilakottai Taluk Dindigul District
2025_HRCE_610923_1
01/2025
Open Tender
Civil Works
Lump-sum
365 days
Ammaiyanayakanur Nilakottai Taluk Dindigul DT
Please refer Tender documents.
5 documents required · 5 mandatory
₹0
₹1.1 L
6 Nov 2025
3 Oct 2025
5 Nov 2025
3 Oct 2025
5 Nov 2025
3 Oct 2025
3 Oct 2025 - 5 Nov 2025
Amount
Dismantling and removing the existing cutstone masonry wall including numbering the cut stone members such as Pavukal, Uthiram, Pillar, Pothiyal etc.,and stacking the same at the place as directed by the officers in charge within the temple campus without hinderence for execution of work including all labour charges and hire charges for tools and plants involved to do the work etc complete, as per department instructions.
For Outer Vari-Uba Peedam
For Outer Vari-Bothiyal
Pillar, Bothiyal, Uthiram
Pavukkal
Cut stone flooring unsized
Dismantling brick/stone masonry work in lime mortar including all labour charges required and all tools and plants required etc., complete.
Earth work excavation for foundation in all classes of soils and sub soils and todepth as may be directed except in hard rock, requiring blasting, including infinal leads and lifts and re-filling the sides of foundation, with excavated earth in 150mm layers well watered rammed and consolidated, including depositing surplus earth clearing and levelling the site, shoring shuttering baling out water wherever necessary etc., complete complying with standard specification.
Hard Kankar Soil
Ordinary soil
Slided portion
Cement Concrete 1:5:10 (one cement five sand ten aggregate) using 40mm gauge hard granite broken stone jelly for foundation including cost and conveyance of all materials labour for mixing,l aying, compacting, curing, dewatering, side shuttering, wherever necessary including curing etc.,complete complying with standard specification and as directed.
Providing and laying position,Standardised concrete mi M-20 Grade in accordance with IS :456-2000,using 20mm and down graded hard brocken granite stone jelly for all Rcc items of works with minimum cement content of 3250 kg/cum and maximum water cement ratio of 0.55,inculding admiture (plasticiser / super plasticiser) in recommended proportions as per IS:9103 to accelerate, retart setting of concrete, improve workablity without imparing strengh and durability with about (5 cum)7730 kg. of 20mm machine crushed stone jelly and with about (3.3 cu.m)5156 kg of 10-12 mm machine crushed stone jelly and with about(4.79 cu.m)7670 kg of Sand ,but eculding cost of reinforcement grill and fabricating charges,centering and shuttering and also inculding laying, vibrating with mechanical vibrtors,finishing,curing,etc,complete complying with standred specification and ass directed by the departmentel officers.the coarse and fine aggregates to be used shoul comply with the requirments of IS standreds.(No separate payment will be made by the Department for the excess usage of materials.) Foundation and Basement
Supplying, fabricating and placing in position Mild Steel / Ribbed Tor Steel grills for all RCC works as per design given including cost of steel and G.I. binding wire in all floors etc. complete complying with standard specification. (Contractor has to make his own arrangements for the supply of steel and binding wire)
Random Rubble Masonry in Cement mortar 1:5 (One of cement and five of sand) using new rough stone and bond stone for foundation and basement including simultaneous flush pointing, curing etc complete complying with standard specifications.The lime used and suitable for structural and masonry works .
Foundation and Basement
Above Basement
Refixing the dismantled cutstone wall, Pavukal, Uthiram, Pillar and Pothiyal in correct position as directed and pointing with combination mortar including all labour charges and hire charges for tools and plants imvoived to do the work wct complete as per department instructions.
Uba peedam, Adhistanam
Bodhiyal outer vari
Pillar, Bothiyal, Uthiram
Pavukkal
Dressing the new pavukal, Uthiram Floor slab etc as directed and fixing the same in position with Combination mortar including all labour charges for dressing and fixing in posision as directed etc complete.
Outer face
For Uthiram inner
New stones for Pavukkal
Cement Concrete 1:2:4 (one cement two sand four aggregate) using 20mm gauge hard granite broken stone jelly for foundation including cost and conveyance of all materials labour for mixing,l aying, compacting, curing, dewatering, side shuttering, wherever necessary including curing etc.,complete complying with standard specification and as directed.
Centering for soffits of Rcc slabs of plain surface like lintels, beams, etc., including strutting 3M high using MS sheets of size 90cmx60cm and PG 10 stiffened with MS angles of size 25x25x3mm laid over silver oak (C.W) joists of size 10x6.5cm (spaced at about 90cm c/c) and supports 75cm c/c complying with standard specification and directed 10sqm.
Footings, Plinth Beam, etc.,
Providing Strutting arrangements for pavukkal for dismantling weathering coarse and pavukkal using casiourina posts and runners etc., including cost of all materials and all labour charges and materials required etc., complete.
Plastering with Cement Mortar 1:5 (One cement and Five Plastering sand), 12mm thick in all floors including curing etc. complete complying with standard specification and as directed by the departmental officers.
Supplying and laying of Interlocking Paver Block Stone 83mm thk. Over a base layer of crushed stone sandfilling 10 cm incl. Cost of materials laying and Labour charges etc.,
Supply of New cut stone for Pavukkal, Uthiram, etc., including cost and conveyance of cut stone, labour charges, loading and unloading and all other incidental charges etc., complete.
Supply of New cut stone for Pavukkal, Uthiram, etc., including cost and conveyance of cut stone, labour charges, loading and unloading and all other incidental charges etc., complete.
Cement Concrete 1:3:6 (One Cement, Three crushed stone sand and Six broken stone jelly) using 20mm size hard broken stone jelly for dummy columns,etc., excluding cost of centering shuttering reinforcement grills and fabrication charges but including curing etc. complete and as directed by the departmental officers. ( Dummy columns should be at least 1 metre height)
Supplying and fixing Mild Steel grills for windows, ventilators etc.,complete complying with standard specifications and as directed by the departmental officers.
Painting new iron works such as steel doors, windows, ventilators, window bars, balustrades etc., with two coats of best approved first quality and colour of synthetic enamel paint over the existing red oxide priming coat in all floors excluding cost of priming coat etc., complete complying with standard specification and as directed by the departmental officers. (The make, quality and colour of paint should be got approved by the Executive Engineer before use on works.)
Supplying and Fixing of Precast RCC Vertical and Strut posts each of size 150x150mm at bottom and 100x100mm at top and 2400mm height in M20 concrete using 20mm gauge hard granite broken stone jelly including cost of mould, mixing, laying, curing, stacking the posts at required places for fixing and conveying the posts to actual work spot and erecting the same in foundation pit in position as directed but including cost of reinforcement and refilling with excavated earth, levelling, etc., complete
Providing chain link fencing using 50mmx50mm size opening and 10 GGI. Chain link placed in vertical position as directed and tied in the RCC fencing posts suitably above ground level continuosly with out break as directed with necessary bolts and nuts as required etc., complete. the rate inclusive of cost of chain link and should be of good quality
Laying Cut stone flooring using New Cut stone slabs of 60x60x10cm 3 line dressed as directed and pointing with cement mortor including all labour charges and hire charges for tools and plants imvoived to do the work etc.,Complete as per department instructions
Weathering course concrete with broken jelly 20mm size and pure slaked lime over RCC roof slab, the proportion being 32:12.5 for required depth of 80mm for giving required slope and thickness of roof on required, well beaten with wooden beater etc, complete with standard specifications.
Finishing the top of roof with one course of machine pressed tiles 23cmx 23cmx20mm of approved quality laid in cm 1:3,12mm thick mixed with water proofing compound 2% by weight of cement used etc, complete with standard specifications.
Brick masonry Cement Mortar 1:3 using Stock bricks including all varivargams, moulds, sthambams, mukapathrams, koodu, nasi and all ornamental brick work complete, all pancharams, agarais, karnakoodus, etc., forming core walls of Rajagopuram/ Vimanams complete including cost and conveyance of all materials including cement, all the labour charges including marking pathies shaping of the bricks, lifting of all the materials to required heights, curing and all extra for working in heights etc., complete 100 cft for vimanam / gopuram
Providing Vargapoochu over the core walls of Rajagopurams / Vimanams with in lime mortar 1:3(One of Lime and three sand) complete including shaping the Mugapathrams, Mahanasi, Koodu, all Ornamental works to proper shape complete complete for Vimanam and Gopuram height upto 50 feet (Excluding Kalkaram)
Painting with multicolour (Panchavarnam) good emuision paints complete for the Vinamans/Gopurams, inculding cost and conveyence of all materials, lobour charges inculdinf Artist painter, working in heights, lifting of material, cost of brushes etc, complete-which including all extra for foldings-100sft, superficial area.
Providing new sudhai vigrahams in the vimanams and Rajagopurams with galvanised iron rod reinforcement of suitable dia with binding wires wherever necessary, shaping the core with broken bricks set in CM 1:3 finishing the same with CM 1:3 bringing to the correct shape (Lakshana) in conformift with silpa sastra inclusive of special ornaments, wiapons, peedam etc., complete and providing C.M. Nayam theervai wherever necessary. inclusive of cost and conveyance of all materials, such as cement broken bricks, and G.I. rods.binding wire all labour for working in heights, curing lifiting of materials etc., complete including cement painting 2 coats over a primary coat (one vigraham is accountable with one head, 4 hands with weapons, ornamental costumes etc., as per prathima lakshans, Vigraham height is measurable from the crown top to the bottom of foot only If peetam is pt\rovided the rate with peetam may be adopted as datailed hereunder)
Sudhai size above 1'0'' upto 2'6''
Sudhai size above 2'6'' upto 3'6''
Scaffolding charges for Vimanams and Gopurams with casurina posts coconut or palm trees wherever necessary for main, form work and providing with net lawn / PVC mesh coverings, providing ladder arrangements, country wood plank for working, inspection etc. complete, hire charges only for erection, maintenance and removing the same on completion of the work Gopuram 50'0"
JP CONSTRUCTION (BID ID -1502649)
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
finance_730056.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.69 MB
BOQ_730056.xls
BOQ • 0.36 MB
TenderDocumentmerged.pdf
Tender Documents • 1.86 MB
610923.pdf
PDF • 0.17 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .