| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹88.4 LAdmitted-Finance | -18.45% | ₹88.4 L | L1 | Admitted-Finance |
| 2 | L2₹1.1 CrAdmitted-Finance AT PO BIJABANDILI PS AMBADOLA DIST RAYAGADA PIN 765020 | AMBADOLA | RAYAGADA | ODISHA | 765020 | +0.00% | ₹1.1 Cr | L2 | Admitted-Finance |
| 3 | L2₹1.1 CrAdmitted-Finance | +0.00% | ₹1.1 Cr | L2 | Admitted-Finance |
| 4 | L2₹1.1 CrAdmitted-Finance | +0.00% | ₹1.1 Cr | L2 | Admitted-Finance |
| 5 | L2₹1.1 CrAdmitted-Finance ADARSH NAGAR 3RD LANE GUNUPUR 765022 | RAYAGADA | ODISHA | 765022 | +0.00% | ₹1.1 Cr | L2 | Admitted-Finance |
Tender Value
₹1.1 Cr
EMD Value
₹1.1 L
Closing Date
13 Apr 2026, 5:00 pmClosed
Chief Construction Engineer Rayagada
Chief Construction Engineer Rayagada R and B Circle
Building works
2026_EICCL_127687_1
CCE R and B Rgda 17/2025-26
National Competitive Bid
Civil Works - Buildings
210 days
Rayagada
Please refer Tender documents.
2 documents required · 2 mandatory
₹10,000
₹1.1 L
Yes
30 May 2026
30 Mar 2026
15 Apr 2026
30 Mar 2026
13 Apr 2026
30 Mar 2026
30 Mar 2026 - 7 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Earth work in excavation in all kinds of soil or gravelly soil for leveling the area with all leads & lifts, Disposal of excavated earth & unserviceable Mterials by mechanical means with 5 km. Lead and including loading & unloading, hire & running charges of materials etc.with all labour and T&P required for the work complete in all respects. | |||||
| 2Filling Foundation and plinth with sand, laying in layers, well watered and rammed including cost, conveyance, royalty, & taxes of all materials, with labour, T&P required for the work etc., complete in all respects as per direction of Engineer-in-Charge. | |||||
| 3Back Filling of surplus excavated earth at work site by initial lead & lift of 1.50 mtr including cost, conveyance, royalty, & taxes of all materials, with labour, T&P required for the work etc., complete in all respects as per direction of Engineer-in-Charge. | |||||
| 4Cement concrete of prop.(1:3:6) in foundation and floors up to lowest bed level using hard black granite crusher broken metal of size 40 mm size down graded of approved quality from approved quarry as per approved design including hoisting,lowering,laying compacting concrete in layers not exceeding 6” thick, watering, curing for three weeks shuttering the exposed surfaces, finished smooth, providing grooves of beads where necessary including cost, conveyance, royalty, & taxes of all materials, with labour, T&P required for the work etc., complete in all respects including dewatering if required as per direction of Engineer-in-Charge. | |||||
| 5Cement concrete of prop.(1:2:4) in foundation and floors up to lowest bed level using hard black granite crusher broken metal of size 12 mm size down graded of approved quality from approved quarry as per approved design including hoisting,lowering,laying compacting concrete in layers not exceeding 6” thick, watering, curing for three weeks shuttering the exposed surfaces, finished smooth, providing grooves of beads where necessary including cost, conveyance, royalty, & taxes of all materials, with labour, T&P required for the work etc., complete in all respects including dewatering if required as per direction of Engineer-in-Charge. | |||||
| 6R.C.C.work of Grade M-20 having a minimum compressive strength in work test of 250kg/Cm2 in 15cm cubes at 28 days after mixing and tests conducted in accordance with IS 456 & IS 516 using 20mm down graded size black crusher broken hard granite stone chips of approved quality & from approved quarry including hoisting, lowering & laying concrete & compacting by using vibrators, watering & curing for 4 (four) weeks centring, shuttering & finishing the exposed surface smooth providing grooves or beads where necessary including cost & conveyance royalties & taxes of all materials & labour required for the work etc., complete in all respect but excluding cost & conveyance of M.S.Rods or tor steel and binding wires of 18 to 20 gauge & labour charges for straightening, cutting, bending etc.,of the HYSD Rods or tor steel & binding wires & laying the grills placing in proper position as per direction of Engineer-in-Charge. Column Base Ground Floor | |||||
| 7First Floor | |||||
| 8Plinth Beam | |||||
| 9Column Shaft Ground Floor | |||||
| 10Head Room | |||||
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html