Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.1 CrAccepted-AOC | ₹1.1 Cr | L1 | Accepted-AOC L1 bidder |
| 2 | L2₹1.1 Cr+₹2.2 L (2.07%)Rejected-AOC | ₹1.1 Cr+₹2.2 L (2.07%) | L2 | Rejected-AOC L2 bidder |
Tender Value
₹1.1 Cr
EMD Value
₹2.2 L
Closing Date
27 Mar 2026, 5:00 pmClosed
Chief Engineer
Jharkhand Police Housing Corporation Limited Line Tank Road Ranchi 834001
Construction of M.T. Shed at Police Line, Gumla in the district of Gumla.
2026_JPHCL_111103_1
JPHCL/GR 12/NIT 08/2025-26
Open Tender
Civil Works - Buildings
Percentage
240 days
Gumla
Please refer Tender documents.
2 documents required · 2 mandatory
₹10,000
₹2.2 L
Yes
9 Sept 2026
11 Mar 2026
30 Mar 2026
11 Mar 2026
27 Mar 2026
11 Mar 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Section- I Civil Works | - | - | - | - |
| 2 | 5.1.1 + 5.1.2
EARTH WORK IN EXCAVATION IN FOUNDATION Trenches in ordinary soil (vide classification of soil item -A) and disposal of excavated earth as obtained to a distance upto 50 M including all lift, leveling ramming the foundation trenches, removing roots of tree shrubs all complete as per approved design, building specification and direction of E/I. | 207.3 | cum | 167.33 | ₹34,687.51 |
| 3 | 5.1.7
EARTH FILLING IN FOUNDATION TRENCHES AND PLINTH in layers not exceeding 150 mm thick well watered, rammed, fully compacted and fine dressed with earth obtained from excavation foundation trenches within a lead of 50 M and lift of 1.5 M all complete as per building specification and direction of E/I. (mode of measurement compacted volume) | 207.3 | Cum. | 55.28 | ₹11,459.54 |
| 4 | 5.1.10
Providing coarse clean sand in filling in foundation trenches or in plinth including ramming and watering in layers not exceeding 150mm thick with all leads and lifts including cost of all materials labour, royalty and taxes all complete as per building specification and direction of E/I (Mode of measurement compacted volume) | 199.27 | cum | 589.51 | ₹1,17,471.66 |
| 5 | 5.6.1
Providing designation 75 A one brick flat soling joints files with local sand including cost of watering taxes royalty all complete as per building specefication and direction of E/I | 829.18 | Sqm | 356.52 | ₹2,95,618.54 |
| 6 | 5.3.1
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :
5.3.1.4
1:3:6 (1 Cement : 3 coarse sand (zone-III) : 6 graded stone aggregate 20 mm nominal size) | 37.89 | Cum. | 4,125.41 | ₹1,56,311.78 |
| 7 | 5.3.1
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :
5.3.1.2
1:2:4 (1 cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size) | 85.92 | Cum. | 4,598.23 | ₹3,95,070.73 |
| 8 | 5.3.9
Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level.
5.3.9.1
1:1.5:3 (1 cement : 1.5 coarse sand (zone-III): 3 graded stone aggregate 20 mm nominal size) | 40.12 | Cum. | 5,218 | ₹2,09,320.07 |
| 9 | 5.3.10
Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement :
1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) : 3 graded stone aggregate 20 mmnominal size) | 17.53 | Cum. | 6,082.45 | ₹1,06,594.94 |
| 10 | 5.3.11
Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor five level, excluding the cost of centering, shuttering, finishing and reinforcement, with 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) : 3 graded stone aggregate 20 mm nominal size). | 42.99 | Cum. | 6,308.87 | ₹2,71,218.32 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.45 MB
Techbid12.pdf
Tender Documents • 7.11 MB
BOQ_150097.xls
BOQ • 0.46 MB
Datecorrigendum2nit8.pdf
PDF • 0.82 MB
Datecorrigendumnit8.pdf
PDF • 0.82 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .