Tender Value
₹61.3 L
EMD Value
₹1.2 L
Closing Date
14 Jun 2023, 2:00 pmClosed
Ex. Engineer PWD RnB Division Nobra
Ex. Engineer PWD RnB Division Nobra
Construction of road to Aranoo Yokma village by way of earth work in embankment ,Pcc side drain , 1 no of RCC culvert and cross drainages
2023_PWD_9794_2
PWD RnB/N/ 15/2023-24
Open Tender
Civil Works - Others
Item Rate
90 days
Nubra
please read nit/sdb condition
7 documents required · 7 mandatory
₹2,000
Payable To Ex. Engineer PWD RnB Division Nobra
₹1.2 L
21 Jun 2023
24 May 2023
19 Jun 2023
24 May 2023
14 Jun 2023
24 May 2023
Amount
Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres: All kinds of soil
Earth work in bulk excavation by mechanical means (hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge.All kinds of soi
Dry random rubble masonry with hard stone in foundation and plinth:Without bond stone incl carriage.
Dry random rubble masonry with hard stone in foundation and plinth in mud mortor incl carriage.
Providing and laying cement concrete in retaining walls, return walls, walls (any thickness) including attached pilasters, columns, piers, abutments, pillars, posts, struts, butteresses, string or laces, courses, parapets, coping, bed blocks, anchor blocks, plain window sills,sunken floors fillets etc. upto floor five level, excluding the cost of centring, shuttering and finishing: 1: 3:6 (1 cement: 3 coarse sand : 6 graded stone aggregate 40mm nommal size; Crushed incl. Cost of carriage
Reinforced cement concrete work in walls (any thickness) including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars,piers, abutments, posts ans sturts, etc. upto floor five level excluding cost of centring, shuttering,finishing and reinforcement. 1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded crushed stone aggregate 20mm nominal size) incl. Cost of carriage
Random Rubble masonry with hard stone in foundation and plinth including leveling up with cement concrete 1:6:12 (1 Cement : 6 coarse sand : 12 graded stone aggregate 20mm nominal size) upto plinth level and curing complete with: 1 Cement mortar 1:6 (1 Cement : 6 coarse sand) incl carriage.
Reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete. Thermo-Mechanically Treated bars.incl. Cost of carriage
Centring and shuttering including strutting, propping etc. and removal of form for.Foundations: footings, bases of columns etc. for mass concrete.
Columns, pillars, piers, abutments, posts and struts.
Providing & laying damp-proof Course 40 mm thick with cement concrete 1:2:4 (1 cement:2 coarse sand: 4 graded stone agg 12.5 mm nominal size) and curing complete
Felling trees of the girth (measured at a height of 1 m above ground level) including cutting of trunk and branches, removing the roots and stacking of serviceable material and disposal of unserviceable material. Beyond 30 cm girth upto and including 60 cm girth.
Beyond 30 cm girth upto and including 60 cm girth.
Earth work in rough excavation, banking excavated earth in layers not exceeding 20 cm in depth, breaking clods, watering, rolling each layer with 1/2 tonne roller or wooden or steel rammers, and rolling every 3rd and top-most layer with power roller of minimum 8 tonnes and dressing up in embankments for roads, flood banks, marginal banks and guide banks or filling up ground depressions, lead upto 50 m and lift upto 1.5 m in all kinds of soil:
Removal of Hypopia from road alignment
Prividing and laying of MS pipe for crossing including trench cutting laying, refilling and making surface good including carrige anf cost of pi[pe complete job. 300 mm dia.
Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead upto 50 m and lift upto 1.5 m.incl. carriage.
Dry stone pitching ( any thickness ) including cost of stones on Horizontal incl .carriage.
RR stone m,asonery in foundation and plith in mud mortor inc. carriage.
M/S ZAHID ALI
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .