| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.1 CrAccepted-AOC C O CHABIN BASUMATARY VILL GORUMARA P O KHAMARDWISA P S SIMLA DIST BAKSA PIN 781330 | GORUMARA | BAKSA | ASSAM | 781330 | ₹1.1 Cr | L1 | Accepted-AOC Awarded |
| 2 | L1₹1.1 CrRejected-Finance C O BIKRAM NARZARY VILL GORUMARA P O KHAMARDWISA P S SIMLA DIST BAKSA PIN 781330 | GORUMARA | BAKSA | ASSAM | 781330 | ₹1.1 Cr | L1 | Rejected-Finance Rejected.Refer to Financial Minutes |
| 3 | Rejected-Technical | - | - | Rejected-Technical Not Admitted. Refer Technical minutes |
Tender Value
₹1.1 Cr
EMD Value
₹2.3 L
Closing Date
22 Feb 2024, 5:00 pmClosed
Director
O/o Director of soil conservation
Erosion Protection Project at Betbari under RIDF XXVIII during 2022-23
2024_SCD_36216_1
Tender/NIT/Pt/2023-24/9307
Open Tender
Civil Works
Item Rate
90 days
Baksa
Please refer Tender documents.
3 documents required · 3 mandatory
₹2,260
₹2.3 L
Yes
7 Oct 2024
13 Feb 2024
23 Feb 2024
14 Feb 2024
22 Feb 2024
15 Feb 2024
Amount
Dahdara Gully Control cum Water Harvesting Project (Structure - 1)
Earth work in excavation of foundation of structures as per drawing and technical specification. In ordinary soil, Mannual means A) Above GBL
Earth work in excavation of foundation of structures as per drawing and technical specification. In ordinary soil, Mannual means B) Below GBL
P.C. C. 1:3:6 in foundation with crushed ston aggregate 40 mm normal size, mechanically mixed, place in foundation and compacted by vibration including curing for 14 days.
Plain/reinforced cement concrete in substructure complete as per drawings and technical specification and shuttering formwork, curing completed as direction
Supplying, fitting and placing TMT (Fe-500 D) reinforcement bar . (From Primary Producer: TATA/ SAIL/Esser Steel/ Jindal steel/Shyam steel/RINL) in superstructure complete as per drawing and technical specifications Clauses 1002, 1010 and 1202
Plastering with cement mortar (1:3 ) on brick work in sub-structure as per Technical specifications
Providing and laying filter material underneath pitching in slopes complete as per drawing and technical specifications Clause 1302
Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. In ordinary soil, Mannual means
Providing and laying boulder apron for bed protection with stone boulders of minimum size and weight as per Table 1300.1, no fragment weighing less than 25 kg laid dry complete as per drawing and technical specifications
Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. In ordinary soil, Mannual means
P.C. C. 1:3:6 in foundation with crushed ston aggregate 40 mm normal size, mechanically mixed, place in foundation and compacted by vibration including curing for 14 days.
Plain/reinforced cement concrete in substructure complete as per drawings and technical specification and shuttering formwork, curing completed as direction
Supplying, fitting and placing TMT (Fe-500 D) reinforcement bar . (From Primary Producer: TATA/ SAIL/Esser Steel/ Jindal steel/Shyam steel/RINL) in superstructure complete as per drawing and technical specifications Clauses 1002, 1010 and 1202
Suppying, fitting and fixing iron pipe for foot bridge railing
Providing Signboard inscribe in Marble/ Tiles
Nakardara GCP at Khunthamari (Structure - 3)
Earth work in excavation of foundation of structures as per drawing and technical specification. In ordinary soil, Mannual means A) Above GBL
Earth work in excavation of foundation of structures as per drawing and technical specification. In ordinary soil, Mannual means B) Below GBL
P.C. C. 1:3:6 in foundation with crushed ston aggregate 40 mm normal size, mechanically mixed, place in foundation and compacted by vibration including curing for 14 days.
Plain/reinforced cement concrete in substructure complete as per drawings and technical specification and shuttering formwork, curing completed as direction
Supplying, fitting and placing TMT (Fe-500 D) reinforcement bar . (From Primary Producer: TATA/ SAIL/Esser Steel/ Jindal steel/Shyam steel/RINL) in superstructure complete as per drawing and technical specifications Clauses 1002, 1010 and 1202
Plastering with cement mortar (1:3 ) on brick work in sub-structure as per Technical specifications
Providing and laying filter material underneath pitching in slopes complete as per drawing and technical specifications Clause 1302
Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. In ordinary soil, Mannual means
Providing and laying boulder apron for bed protection with stone boulders of minimum size and weight as per Table 1300.1, no fragment weighing less than 25 kg laid dry complete as per drawing and technical specifications
Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. In ordinary soil, Mannual means
P.C. C. 1:3:6 in foundation with crushed ston aggregate 40 mm normal size, mechanically mixed, place in foundation and compacted by vibration including curing for 14 days.
Plain/reinforced cement concrete in substructure complete as per drawings and technical specification and shuttering formwork, curing completed as direction
Supplying, fitting and placing TMT (Fe-500 D) reinforcement bar . (From Primary Producer: TATA/ SAIL/Esser Steel/ Jindal steel/Shyam steel/RINL) in superstructure complete as per drawing and technical specifications Clauses 1002, 1010 and 1202
Suppying, fitting and fixing iron pipe for foot bridge railing
Supplying, Fitting and Fixing Hand Tube Well
Providing Signboard inscribe in Marble/ Tiles
Name of the Project: Puhumara RTP at Betbari (Structure - 2)
Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. In ordinary soil, Mannual means
Providing and laying boulder apron for bed protection with stone boulders of minimum size and weight as per Table 1300.1, no fragment weighing less than 25 kg laid dry complete as per drawing and technical specifications
Providing and laying of boulder apron laid in wire crates with 4 mm dia GI wire conforming to IS:280 and IS:4826 in 100 mm x 100 mm mesh (woven diagonally) including 10 per cent extra for laps and joints laid with stone boulders weighing not less than 25 kg each as per drawing and technical specifications
Earthwork in filling in the guide bund by head load up to lead of 60m with approved quality all leads and lifts ramming and compacting with rammer weighing not less than 10kg and falling from height of not less than 90cm and sprinkling with water if necessary. earth is to collected after removing the 1st 20cm of top soil and should be free from grass, shrubs and other foreign (a) Extra lead for each 30cm and part thereof beyond 60m up to a lead 200m.
Providing Signboard inscribe in Marble/ Tiles
RAJESH BASUMATARY
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .