Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.9 LAdmitted-Finance | ₹3.9 L | L1 | Admitted-Finance |
| 2 | L2₹3.9 LAdmitted-Finance | ₹3.9 L | L2 | Admitted-Finance |
| Sl No | Description | Qty | Unit | M.Kumarasamy L1 | P. PasupathiBalamurugan L2 |
|---|---|---|---|---|---|
| 1.00 | 01.Repairs to VPSC Building at Kadinelvayal Panchayat. Dismantling the Damaged Flooring Clean removal and clearing away from the site including all labour charges etc., | 77.43 | Sqm | 1,100.8 ₹85,234.94 | 1,450 ₹1.1 L |
| 2.00 | Providing granolithic floor finish of the following thickness with plain cement concrete 1:2:4 (One Cement, Two crushed stone M.Sand and Four aggregate) using 10 to 12mm gauge hard broken stone jelly including laying, finishing and the top rubbed smooth with power trawl, thread lining, curing etc. complete | 77.43 | Sqm | 230 ₹17,808.90 | 350 ₹27,100.50 |
| 3.00 | Finishing the top of roof with one course of machine pressed tiles of size 230mm x 230mm x 20mm of approved quality set in Cement Mortar 1:3 (One Cement and Three Crushed stone M.Sand) 12mm thick etc., complete. | 82.28 | Sqm | 60.2 ₹4,953.26 | 250 ₹20,570 |
| 4.00 | White washing two coats with freshly burnt white shell lime in all floors including cost of lime, blue powder fevicol type gum, brushes, scaffolding charges, etc., complete complying with standard specification and as directed. | 119 | Sqm | 48.9 ₹5,819.10 | 250 ₹29,750 |
| 5.00 | Distempering the old walls and ceiling one coat with best oil bound distemper of approved quality including preparation of surfaces (the colour and quality should be got approved by the Executive Engineer before use) the rate includes cost of brushes, high scaffolding charges, | 242.47 | Sqm | 60.5 ₹14,669.44 | 150 ₹36,370.50 |
| 6.00 | Painting the newly plastered wall surface with two coats of colour emulsion outside the building over one coat of cement primer including clearing the surface in all floors etc., complete as per standard specification. | 203.54 | Sqm | 44 ₹8,955.76 | 45 ₹9,159.30 |
| 7.00 | Painting the old iron works two coats with syntactic enamel paint of approved quality and colour including ordinary scraping using brushes and neat finishing etc., complete complying with standard specification and as directed by the Departmental Officer (the colour and quality should be got approved by the Executive Engineer before use) | 97.48 | Sqm | 60 ₹5,848.80 | 65 ₹6,336.20 |
| 8.00 | Provision for New Toilet doors | 2 | each | 2,000 ₹4,000 | 1,500 ₹3,000 |
| 9.00 | Provision for Sanitary arrangements | 1 | each | 1,000 ₹1,000 | 5,000 ₹5,000 |
| 10.00 | Provision for Ramp Hand rails | 1 | each | 1,500 ₹1,500 | 4,500 ₹4,500 |
Tender Value
₹4.1 L
EMD Value
₹4,070
Closing Date
10 Mar 2026, 4:00 pmClosed
Block Development Officer(BP),Vedaranyam
Block Development Office, Vedaranyam
01.Repairs to VPSC Building at Kadinelvayal Panchayat 02.Repairs to VPSC Building at Pannal Panchayat
2026_RDTN_671850_6
RD-NGP/498/2025-A2
Open Tender
Civil Works
Works
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹4,070
12 Mar 2026
7 Mar 2026
10 Mar 2026
7 Mar 2026
10 Mar 2026
7 Mar 2026
7 Mar 2026 - 10 Mar 2026
01.Repairs to VPSC Building at Kadinelvayal Panchayat. Dismantling the Damaged Flooring Clean removal and clearing away from the site including all labour charges etc.,
Providing granolithic floor finish of the following thickness with plain cement concrete 1:2:4 (One Cement, Two crushed stone M.Sand and Four aggregate) using 10 to 12mm gauge hard broken stone jelly including laying, finishing and the top rubbed smooth with power trawl, thread lining, curing etc. complete
Finishing the top of roof with one course of machine pressed tiles of size 230mm x 230mm x 20mm of approved quality set in Cement Mortar 1:3 (One Cement and Three Crushed stone M.Sand) 12mm thick etc., complete.
White washing two coats with freshly burnt white shell lime in all floors including cost of lime, blue powder fevicol type gum, brushes, scaffolding charges, etc., complete complying with standard specification and as directed.
Distempering the old walls and ceiling one coat with best oil bound distemper of approved quality including preparation of surfaces (the colour and quality should be got approved by the Executive Engineer before use) the rate includes cost of brushes, high scaffolding charges,
Painting the newly plastered wall surface with two coats of colour emulsion outside the building over one coat of cement primer including clearing the surface in all floors etc., complete as per standard specification.
Painting the old iron works two coats with syntactic enamel paint of approved quality and colour including ordinary scraping using brushes and neat finishing etc., complete complying with standard specification and as directed by the Departmental Officer (the colour and quality should be got approved by the Executive Engineer before use)
Provision for New Toilet doors
Provision for Sanitary arrangements
Provision for Ramp Hand rails
Provision for water Supply arrangements
Provision for Electrification arrangements
Provision for Name Board and Photo charges etc
02.Repairs to VPSC Building at Pannal Panchayat. Finishing the top of roof with one course of machine pressed tiles of size 230mm x 230mm x 20mm of approved quality set in Cement Mortar 1:3 (One Cement and Three Crushed stone M.Sand) 12mm thick mixed with water proofing compound conforming to ISS at 2% by weight of cement used and the joints pointed neatly to full depth of tiles with the same cement mortar mixed with red oxide and water proofing compound including curing etc., complete complying with standard specification and as directed by the departmental officers - Pointing
White washing two coats with freshly burnt white shell lime in all floors including cost of lime, blue powder fevicol type gum, brushes, scaffolding charges, etc., complete complying with standard specification and as directed.
Distempering the old walls and ceiling one coat with best oil bound distemper of approved quality including preparation of surfaces (the colour and quality should be got approved by the Executive Engineer before use) the rate includes cost of brushes, high scaffolding charges, neat finishing, cost of brushes etc., complete complying with standard specification and as directed by the Departmental Officer
Painting the newly plastered wall surface with two coats of colour emulsion outside the building over one coat of cement primer including clearing the surface in all floors etc., complete as per standard specification.
Painting the old iron works two coats with syntactic enamel paint of approved quality and colour including ordinary scraping using brushes and neat finishing etc., complete complying with standard specification and as directed by the Departmental Officer (the colour and quality should be got approved by the Executive Engineer before use)
Provsion for Door Repairs
Provision for Sanitary arrangements
Provision for water Supply arrangements
Provision for Name Board and Photo charges etc
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package} 18% for other than Earth Quantity
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.59 MB
BOQ_807440.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid