Karnataka Power Corporation Limited
Santosh Naik
AMC Work
KPCL/2026-27/PS/WORK_INDENT4581/CALL-2
KPCL/2026-27/PS/WORK_INDENT4581/CALL-2
Open
Power stations
Two Tender Document System(Two Cover)
KPCL Executive Engineer CHPE2 Office RTPS Raichur
6 documents required · 3 mandatory · 3 optional
Minimum financial turnover (civil engineering construction works) not less than two times the annual payments from this contract (Rs. xxxxx Lakhs)
Satisfactoriy completed (atleast 90%) as prime contractor at-least one such similar work of value not less than Rs. xxxxxxx (80% of estimated cost of tender)
Executed in any one year the following minimum quantities of work (Cement Concrete - xxxx cum, Earthwork - xxxx cum, etc) (80% of peak rate of construction)
Tenderer or his identified Sub Contractor should possess valid Electrical License for executing building electrificatio works and should have executed similar electrical works totallng Rs. xxxxxx (not less than 50% of electrical works) n any one year
Tenderer or his identified Sub Contractor should possess valid license for executing water supply / sanitary engineering works and should have executed similar works totallng Rs. xxxxxx (not less than 50% of electrical works) n any one year
Owning the following key and critical equipment for this work (xxxx, xxxx, xxxx)
Liquid assets and /or availability of credit facilities of no less than Rs. xxxxxx Lakhs (estimated cash flow for 3 months of peak construction period)
Total value of civl engineering works executed and payments received in the last five years (year-wise)
List of existing commitments and ongoing works
List of works for which tenders already submitted
Banker Details for reference
Construction equipment owned by the tenderer and equipment proposed to be deployed on this contract, if awarded
Reports on the financial standing of the tenderer, such as profit and loss statements and auditor’s reports for the last five years
Qualification and experience of the key technical and management personnel in permanent employment with the tenderer and those that are proposed to be deployed on this contract, if awarded
List of Financial Resources with Certificates
The intending Bidder as a prime contractor shall have satisfactorily completed one similar work of Routine/Preventive/Breakdown maintenance of Electrical Equipments in any thermal power plant worth not less than Rs. 85.42 Lakhs in the last five years (2021-22, 2022-23, 2023-24, 2024-25 and 2025-26). As a proof, the bidder shall upload a copy of work order and related work done certificate issued by an officer not below the rank of Chief Engineer in case of KPCL and by the Competent Authority in case of other than KPCL. (Work done of previous year shall be given weight of 10% per year to bring them to the present price level FY-2026-27)
The intending bidder shall be a Class-I or above Electrical contractor. As a proof, the bidder shall upload a valid Electrical License issued by the State government of Karnataka
The intending Bidder in his name should have achieved in at least two financial years a minimum financial turnover of Rs. 341.67 Lakh in the last five financial years (i.e 2021-22, 2022-23, 2023-24, 2024-25 and 2025-26). As a proof, the bidder shall upload a turnover certificate or Profit & Loss account duly certified by a Chartered Accountant. (Financial turnover of previous year shall be given weight of 10% per year to bring them to the present price level of financial year 2026-27)
₹3,620
₹2.2 L
12 Sept 2026
12 Sept 2026
28 Sept 2026
21 Sept 2026
18 Sept 2026
RTPS-Routine, preventive maintenance and OH of LT/HT switchgear, LT motors, Static weighments, Belt weighers and Electrical Equipments of CHP-2 for a period of One year
Routine Maintenance of Electrical Switches
Routine Maintenance of conveyors Sirens
Routine Maintenance of Auxiliary Panels
Routine Maintenance of 415 Volts LT Switch gear Modules and LT breakers
Routine Maintenance of HT breakers and its auxiliary panels
Overhauling/ Replacement of LT motors up to capacity 50 kW.
Allignment of LT Motors up to 50 KW Capacity
Cleaning of Cable Trenches in CHP2 area
Cleaning of Cable Trays in CHP2 area
Preventive,Breakdown Maintenance of Electrical system of CHP-2 area round the clock.
Supervision of the complete work
AOH of 415 Volts LT Switchgear of EECHPE2 division .
AOH of 6.6KV Switchgear Bus Section including service of complete Breakers & Panel. etc
Routine Maintenance of Static Weigh Bridges And Belt Weighers System of CHPE1 & 2 Round The Clock.
Preventive Maintenance of Static Weigh Bridges of All 5 Wagon Tipplers Of Chp-1 &2.
Preventive Maintenance of Belt Weighers of All 10 Conveyors of CHP-1 & 2.
Calibration of Static Weigh Bridges of Wagon Tipplers. 1 to 5 .
Calibration of Conveyor Belt Weighers. Of EECHPE1&2.
Replacement of Damaged Load Cells with new and necessary arrangement .
Shifting of Hexgonal weight for testing from store to Wagon tippler table and Removing standred weight from test wagon box.
Replacement of pull cord sensor, indicator and terminal block sensor.
Lubrication of LT &HT motor in CHPE2 area .
Transportation of LT Power and control cable as per required in CHP2 under failure condition.
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
Bid Document.docx
Tender Document • 0.15 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .