| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.4 CrAccepted-Finance | ₹1.4 Cr | L1 | Accepted-Finance generally in order |
| 2 | L2₹1.6 CrAccepted-Finance | ₹1.6 Cr | L2 | Accepted-Finance generally in order |
| 3 | L3₹1.6 CrAccepted-Finance | ₹1.6 Cr | L3 | Accepted-Finance generally in order |
| 4 | L4₹1.7 CrAccepted-Finance | ₹1.7 Cr | L4 | Accepted-Finance generally in order |
| 5 | L5₹1.7 CrAccepted-Finance TUTICORIN | TUTICORIN | TAMIL NADU | 626202 | ₹1.7 Cr | L5 | Accepted-Finance generally in order |
| Sl No | Description | Qty | Unit | J SABARI L6 | R.S.S.ENTERPRISES L1 | Renga Engineering Works India Pvt Ltd L7 | bharaniengineeringworks L3 | Ramesh Enterprises L5 | P.MEERAZA L2 | V NARAYANAN L4 |
|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Clearing light jungle and disposing off to a place at least 1 km away from the site as directed by the Engineer in charge including cost of all labour charges, lead, lift, Tool & plants etc, complete. | 30,000 | Sqm | 5 ₹1.5 L | 4 ₹1.2 L | 6.87 ₹2.1 L | 0.5 ₹15,000 | 12 ₹3.6 L | 6 ₹1.8 L | 4.5 ₹1.4 L |
| 2.00Sweeping and cleaning of buildings floor area including collection of debris, garbage, teacups, paper waste and other liters etc., and disposing the same in to near by dustbins daily in all working days as instructed by the engineer incharge, the rate including cost of all labour, lead, lift, broom sticks, gunny bags, safety Tools and saftey appliance etc., complete.(Completed Buildings) | ||||||||||
| 2.01 | Total Sweeping floor Area in sqm (Daily once) | 1,15,58,004 | Sqm | 0.55 ₹63.6 L | 0.42 ₹48.5 L | 0.53 ₹61.3 L | 0.4 ₹46.2 L | 0.5 ₹57.8 L | 0.5 ₹57.8 L | 0.18 ₹20.8 L |
| 2.02 | Total Sweeping Power house 24m to 41m and Stair case Area in sqm ( Weekly once) | 8,75,310 | Sqm | 0.5 ₹4.4 L | 0.42 ₹3.7 L | 0.53 ₹4.6 L | 0.4 ₹3.5 L | 1.2 ₹10.5 L | 0.63 ₹5.5 L | 0.9 ₹7.9 L |
| 2.03 | Total Sweeping Terrace Area in sqm ( Monthly once) | 39,534 | Sqm | 0.5 ₹19,767 | 0.42 ₹16,604.28 | 0.53 ₹20,953.02 | 0.4 ₹15,813.60 | 3.5 ₹1.4 L | 0.7 ₹27,673.80 | 1.08 ₹42,696.72 |
| 3.00Mopping and cleaning of floor area in all buildings including cost of all materials, labour, lead, lift, Tools and plants, charges for saftey appliance etc., - once in a day | ||||||||||
| 3.01 | Total Mopping Area in sqm (Daily once) | 53,89,507 | Sqm | 0.7 ₹37.7 L | 0.6 ₹32.3 L | 0.74 ₹39.9 L | 0.62 ₹33.4 L | 0.52 ₹28.0 L | 0.55 ₹29.6 L | 0.81 ₹43.7 L |
| 3.02 | Total Mopping Area in sqm ( Weekly once) | 42,577 | Sqm | 0.7 ₹29,803.90 | 0.6 ₹25,546.20 | 0.74 ₹31,506.98 | 0.6 ₹25,546.20 | 0.6 ₹25,546.20 | 0.8 ₹34,061.60 | 1.08 ₹45,983.16 |
| 4.00Cleaning of toilets in buildings including urinals, water closet, bath rooms, toilet floor area, wash basin and around the toilet block for easy approach and maintenance of toilets in neat and tidy condition with out odor and foul smell, using cleaning agents like bleaching powder, Sabena powder, phenyl, broom sticks, cleaning brush and placing naphthalene balls, etc., including cleaning of cobweb and wall tiles once in week, cost of all materials, labour, lead, lift etc. -Twice in a day | ||||||||||
| 4.01 | Small Toilet | 14,880 | opr | 38 ₹5.7 L | 20 ₹3.0 L | 37.31 ₹5.6 L | 30 ₹4.5 L | 35 ₹5.2 L | 6 ₹89,280 | 4.5 ₹66,960 |
Tender Value
Refer Docs
EMD Value
₹1.5 L
Closing Date
6 Mar 2026, 2:00 pmClosed
Chief Engineer, Electrical, Udangudi STPP-I
office of the Chief Engineer, Electrical, Udangudi STPP at Kallamozhi
House Keeping and maintenance for BTG, BOP, AHP/CHP and coal Jetty areas for a period of 120 days from the date of commencement of works at Udangudi STPP
2026_EB_668255_1
CE/SE/C/USTPP-I/09/2025-2026
Open Tender
Civil Works - Others
120 days
USTPP at Kallamozhi
as per Specification
8 documents required · 8 mandatory
₹0
₹1.5 L
Yes
10 Mar 2026
28 Feb 2026
7 Mar 2026
28 Feb 2026
6 Mar 2026
28 Feb 2026
28 Feb 2026 - 6 Mar 2026
Clearing light jungle and disposing off to a place at least 1 km away from the site as directed by the Engineer in charge including cost of all labour charges, lead, lift, Tool & plants etc, complete.
Sweeping and cleaning of buildings floor area including collection of debris, garbage, teacups, paper waste and other liters etc., and disposing the same in to near by dustbins daily in all working days as instructed by the engineer incharge, the rate including cost of all labour, lead, lift, broom sticks, gunny bags, safety Tools and saftey appliance etc., complete.(Completed Buildings)
Total Sweeping floor Area in sqm (Daily once)
Total Sweeping Power house 24m to 41m and Stair case Area in sqm ( Weekly once)
Total Sweeping Terrace Area in sqm ( Monthly once)
Mopping and cleaning of floor area in all buildings including cost of all materials, labour, lead, lift, Tools and plants, charges for saftey appliance etc., - once in a day
Total Mopping Area in sqm (Daily once)
Total Mopping Area in sqm ( Weekly once)
Cleaning of toilets in buildings including urinals, water closet, bath rooms, toilet floor area, wash basin and around the toilet block for easy approach and maintenance of toilets in neat and tidy condition with out odor and foul smell, using cleaning agents like bleaching powder, Sabena powder, phenyl, broom sticks, cleaning brush and placing naphthalene balls, etc., including cleaning of cobweb and wall tiles once in week, cost of all materials, labour, lead, lift etc. -Twice in a day
Small Toilet
Medium Toilet
Large Toilet
Sewer line maintenance of building - Removing of blocks in the sewer lines whenever/where ever necessary, between man holes to man holes and cleaning including labour, labour leads and lifts etc., complete.
Clearing of silt and slush from the manholes and disposing the sludge by digging pit nearby area, spreading bleaching powder over the sludge and covered with excavated earth rate including cost of all labour, lead, bleaching powder and T&P etc., complete.
Cleaning of collection chamber (Provision for materials,labour,etc.)- Buildings with Toilets / with Temporary PVC Sintex tank provision
Cleaning and desilting of Intake/CW forebay, sludge pump sump, NDCT drains etc. and maintenace activity
Clearing away the garbage, debris & ash from dustpits,spilled lots and all other wastyers lying scattered around Service Building, Power House and other BTG Buildings disposing away with a lead of 1 km as directed including all charges, lead, lift conveyance tools &plants etc. complete. (clearance to be done once in a week from ground level locations and as directed by the Engineer in charge)
Storm water drain maintenace - Removal of earth, sand, silt, fly ash and other loose materials deposited under water in storm water drains using baskets /vessels, Spade and special tools as per site condition including disposing the same by cleaning 12.2km drain
Road Sweeping and collection of litter dry leaves, earth, ash / coal dust etc along road once in a week and removing the Earth / Ash silt deposits including cost of all materials, labour, lead lift etc. complete
Provision for Supplying PVC pipe, Tap and specials for plumbing system whenever gets damaged as directed by the Engineer incharge.
Brass Chromium Plated Screw Down Tap 15 / 12mm dia (Heavy Type)
PVC Pipe 25mm 10kg/cm2
PVC Pipe 50mm 10kg/cm2
CP Angle Cock Tap Each 776.00
CP Heavy Duty Bottle Trap 32mm
Urinal Hose replacement (LMR)
Gun Metal Gate Valve 25mm
Gun Metal Gate Valve 32mm
Gun Metal Wheel Valve (Heavy Duty) 32mm
Gun Metal Wheel Valve (Heavy Duty) 50mm
Gun Metal Wheel Valve (Heavy Duty) 65mm
PVC low level flushing tank with all internal fittings (wall mounting type) M-0536 White - 10 litre capacity
VC Nahini / Floor Trap with PVC Grating M-0572 100mm x 75mm Each
Labour charges for 1 Rm for 25 dia PVC Pipe high rise building (extra 50% of labour cost)
Labour charges for 1 Rm for 50 dia PVC Pipe high rise building (extra 50% of labour cost)
Provision for repairing and fixing existing doors and windows in Service Building, Power House and other BTG Building whenever gets damaged during operation including material, labour etc. complete
M-0311 Hydraulic Door Closer of various sizes of approved quality using Aluminium Extruded Section Body Tubular Type Universal Hydraulic Door Closer with Double Speed Adjustment like HARDWYN (make) ‘GAZEL’ (or) Equivalent (with ISI Monogram)
Hydraulic Floor Springs of various sizes, Double Acton Hydraulic Floor Spring of approved quality, brand, manufacture asper BIS Standards for doors including cost of cutting floors as required, embedding in to floors stainless steel cover plates with aluminium pivot and single piece MS sheet outer box with side plate etc., capaple of taking upto 130 kg. weight from door shutter, like HARDWYN
Lock for Aluminium Doors
Plain Sheet Glass - 5.5mm thick for Doors and Windows for replacement
Labour charges for fixing doors in position etc., complete (finished work)
Labour charges for fixing windows and ventilators in position etc., complete.
M-0314 Lock for Aluminium Sliding Windows
M-0310 Pivot for Aluminium Door
M-0327 Stopper and Handle
M-0366 Aluminium Door Stopper with Rubber Bush with required screws
M-0367 Rubber Bush - 40mm dia and 60mm long with required screws
Maintenance Charges of RO filter in Service Building, Power House and other BTG Buildings.
Supply & Installation RO Plant for 100 Liter/ Hour Drinking water in BTG Buildings
Operation of sewage treatment Plant icluding cost of all safety measures, inspection of pipe lines, Safety Appliances, etc, (3 shifts per day)
GST (As per Govt Norms)
Please Enable Macros to View BoQ information
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.33 MB
co4.pdf
Tender Documents • 0.91 MB
BOQ_802896.xls
BOQ • 0.38 MB
Download all tender documents and submit your bid