Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹5.5 LAdmitted-Finance BHO 834 1 DEVACHAHAVADA PANAS SANVORDEM GOA | SOUTH GOA | GOA | 403103 | L1 | Admitted-Finance |
Tender Value
₹5.8 L
EMD Value
₹11,508
Closing Date
13 Nov 2026, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Chief Executive Officer
Chief Executive Officer, South Goa Zilla Panchayat, Old Collectorate Bldg., 3rd Floor, Margao-Goa
Construction of toilet block near Gopalkrishna Ghotnar Temple at Shirshire in ward no 1 in V.P. Borim in Borim Constituency
2026_ZP_32562_1
3/6/SGZP/2026-27/TN-193/L21
Open Tender
Civil Works - Buildings
Percentage
120 days
V.P. Borim
Please refer Tender documents.
4 documents required · 4 mandatory
₹5,000
₹11,508
17 Nov 2026
23 Oct 2026
16 Nov 2026
23 Oct 2026
13 Nov 2026
23 Oct 2026
180 days
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earthwork in excavation by mechanical means (hydraulic excavator)/manual means in foundation pipeline trenches drain (not exceeding 1.5m in width or 10 sq. m. on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m including getting out the excavated soil and disposal of surplus excavated soil as directed within a lead of 50m. a) All kinds of soil | 8.47 | M³ | 291 | ₹2,464.77 |
| 2 | Earthwork in excavation by mechanical means (hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sq.m on plan) including disposal of excavated earth lead upto 50 m and lift upto 1.5m disposed earth to be leveled and neatly dressed including providing barricading, danger lighting guarding as directed in :a)All kinds of soil | 12 | M³ | 286 | ₹3,432 |
| 3 | Earthwork in surface excavation not exceeding 30 cm depth(but exceeding 1.5 m width as well as 10 sq.m on plan) including disposal of excavated earth beyond work site for all leads lift disposed earth to be leveled and neatly dressed in: b) Hard soil | 44.5 | M² | 66 | ₹2,937 |
| 4 | Rubble packing with hard laterite stone under floors including watering ramming and consolidating etc. in pipeline trenches and other foundations complet | 9.97 | M³ | 2,211 | ₹22,043.67 |
| 5 | Providing & laying cement concrete 1:2:4 (1 cement : 2 coarse sand : 4 graded granitic or basaltic stone aggrt. 40 mm. nominal size) excluding cost of centering, shuttering and finishing in: a) All works upto plinth level | 7.31 | M³ | 6,810 | ₹49,781.1 |
| 6 | Laterite masonry in neatly dressed stones of size as specified in cement mortar 1: 4 (1 cement : 4 coarse sand) in foundation and basement | 9.49 | M³ | 5,186 | ₹49,215.14 |
| 7 | Laterite masonry in neatly dressed stones of size as specified in cement mortar 1: 4 (1 cement : 4 coarse sand) in foundation and basement + Extra for laterite masonry in all sizes in superstructure from floor I level upto floor V level. | 7.97 | M³ | 6,115 | ₹48,736.55 |
| 8 | Half brick masonry in cement mortar 1:4 (1 cement : 4 coarse, sand) with bricks of class designation 75 kg/ sq. cm upto floor five level .b)Upto floor V level. | 5.05 | M² | 1,168 | ₹5,898.4 |
| 9 | Centering & shuttering including Strutting, Propping & removal of forms for iv) Sides and Soffits of beams, Beam Haunchings, Cantilever, Girders, Bressumers and Lintels plinth beams not exceeding 1m in depth | 11.11 | M² | 412 | ₹4,577.32 |
| 10 | Centering & shuttering including Strutting, Propping & removal of forms for xiii) Suspended floors, roofs landings, shelves & their supports | 23.72 | M² | 644 | ₹15,275.68 |
stage.html
html • 0.02 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.50 MB
Tendernotice_2.pdf
PDF • 9.05 MB
Tendernotice_3.pdf
PDF • 1.03 MB
BOQ_32947.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .