Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.2 LAccepted-AOC | ₹4.2 L | L1 | Accepted-AOC l1 |
| 2 | L2₹4.9 L+₹63,684.42 (15.0%)Rejected-AOC | ₹4.9 L+₹63,684.42 (15.0%) | L2 | Rejected-AOC l2 |
Tender Value
₹4.2 L
EMD Value
₹4,242
Closing Date
12 Mar 2026, 5:00 pmClosed
Executive Officer, Paralakhemundi Municipality
Executive Officer, Paralakhemundi Municipality
Peripheral Development of Dandumal Sahi Community center
2026_ORULB_126552_13
06/PKDM-2025-26
Open Tender
Civil Works - Others
Percentage
60 days
Paralakhemundi Municipality
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,000
₹4,242
Yes
7 Jun 2026
27 Feb 2026
13 Mar 2026
27 Feb 2026
12 Mar 2026
27 Feb 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in ordinary soil within 50m. Initial lead and 1.5m. Initial lift including rough dressing and breaking clods to maximum 5cm.to 7cm. and laying in layers not exceeding 0.3 m. in depth asper direction of the Engineer-in-charge. ( Road work ) | 25.51 | Cum | 171.72 | ₹4,380.58 |
| 2 | Earth work in hard soil or gravelly soil within 50m. Initial lead and 1.5m. Initial lift including rough dressing and breaking clods to maximum 5cm.to 7cm. and laying in layers not exceeding 0.3 m. in depth asper direction of the Engineer-in-charge. | 5.17 | Cum | 276.89 | ₹1,431.52 |
| 3 | Disposal of excavated earth by truck within 5 Km. lead including loading and unloading to the lower area of the Town for filling of depression etc. complete. | - | Cum | 185.85 | - |
| 4 | Supply and filling of sand to the foundation bed of column pit. Wall Foundation | 14.79 | Cum | 913.69 | ₹13,513.48 |
| 5 | Cement Concrete (1:4:8) by using 4cm. Size C. B.H.G. metal including cost, conveyance etc. complete. | 16.17 | Cum | 5,591.47 | ₹90,414.07 |
| 6 | R:C:C: (1:2:4) using 12 mm. size H.G.(C.B) Chips including the cost of all materials, labour carriage, royalty etc complete. | 15.08 | Cum | 7,722 | ₹1,16,447.76 |
| 7RCC M-20 using 20mm and down grade CBHG chips with all cost convence royality etc complete as per direction of EIC | |||||
| 7.01 | Column Base | 1.1 | Cum | 5,718.08 | ₹6,289.89 |
| 7.02 | Plinth | 0.94 | Cum | 6,339.75 | ₹5,959.37 |
| 7.03 | Beam | 0.56 | Cum | 14,980.99 | ₹8,389.35 |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.60 MB
BOQ_583028.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .