Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance 8 1 B PAHARPUR HOUSE DIAMOND HARBOUR ROAD ALIPORE KOLKATA WEST BENGAL 700027 | KOLKATA | WEST BENGAL | 700027 | Admitted-Finance |
Tender Value
Refer Docs
EMD Value
₹11.3 L
Closing Date
15 May 2020, 3:00 pmClosed
Mr. Sushant Deshpande
thyssenkrupp Industrial Solutions (India) Private Limited Uhde House, L B S Marg, Vikhroli (W), Mumbai - 400083, India.
Two Cells Of RCC Cooling Tower (Extension Of Existing Cooling Tower CT-1) For Naphtha Cracker Expansion Project At Panipat Refinery.
2020_REFHQ_112209_1
6714-CMG-00-CA-0004
Open Tender
Lump Sum TurnKey
390 days
IOCL Panipat Refinery
Please refer Tender documents.
4 documents required · 4 mandatory
₹11.3 L
Yes
tkIS-Mumbai
9 Dec 2020
29 Jan 2020
18 May 2020
29 Jan 2020
15 May 2020
13 Feb 2020
6 Feb 2020
Amount
Process Design, Mechanical design, detailed engineering, Hazop Study with participation by OWNER/CONSULTANT, Project Management, total procurement, supply, route survey for ODC consignment, transportation and storage of all material, fabrication, manufacturing, quality assurance, inspection and expediting, surface preparation & painting, insulation, erection, third party inspection and hydro testing, all connected civil & structural, electrical & instrumentation work, insurance, handling and storage of all equipment, materials, items and all other construction materials, construction management and supervision, assembly and erection, construction and installation, obtaining all statutory approvals, commissioning and mandatory spares, final documentation, mechanical completion, pre-commissioning, commissioning and post guarantee test run (PGTR) of Coling Tower cells (CELL-17, CELL-18) complete with sump & sluice gate valve, screen, fill material, fan etc, New Cooling water sump, New Identical Side Stream Filter, H2SO4 Dosing Pump, New channels connecting to existing & new sump & associated equipment, structural, piping, electrical & instrumentation, Painting and insulation etc. with Final and “As Built” documentation to IOCL on single point responsibility basis (Lump Sum Turn Key –LSTK- Basis) for M/s Indian Oil Corporation Limited at Panipat Refinery, India. (6714-CMG-00-CA-0004)
PRICE FOR ABOVE IN INDIAN CURRENCY
Charges for 2 years Operation and Maintenance Spares for two cells of RCC cooling tower ( extension of existing Cooling Tower CT-4) including final hook up/ Tie in with existing facilities on Package basis FOR NAPHTHA CRACKER EXPANSION PROJECT AT PANIPAT REFINERY.
Charges for 2 years Operation and Maintenance Spares for Two cells of RCC cooling tower ( extension of existing Cooling Tower CT-4) including final hook up/ Tie in with existing facilities on Package basis FOR NAPHTHA CRACKER EXPANSION PROJECT AT PANIPAT REFINERY.
TOTAL GUARANTEED POWER CONSUMPTION
TOTAL GUARANTEED POWER CONSUMPTION FOR 2 NOS. OF FANS FOR COOLING TOWER
Paharpur Cooling Towers Limited
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.06 MB
Download all tender documents and submit your bid