Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹10 LAccepted-AOC | L1 | Accepted-AOC Accepted | |
| 2 | L2₹8.5 L+₹17,025.20 (2.04%)Rejected-AOC | L2 | Rejected-AOC Rejected |
| Sl No | Description | Qty | Unit | N S P ASSOCIATES L1 | SRI S.P.S ASSOCIATES L2 |
|---|---|---|---|---|---|
| 1.00 | Dismantling damaged RCC slab etc. complete as per direction of departmental officers etc. completed. | 1 | M3 | 4,377 ₹4,377 Lowest | 4,400 ₹4,400 |
| 2.00 | Desilting the existing storm water drain etc. complete as per direction of departmental officers etc. completed. | 6 | M3 | 97 ₹582 Lowest | 100 ₹600 |
| 3.00 | Dismantling damaged plain cement concrete etc. complete as per direction of departmental officers etc. completed. | 17 | M3 | 572 ₹9,724 Lowest | 600 ₹10,200 |
| 4.00 | Earth work Excavation in all soild with initial lead and lift etc., complete for drain | 116 | M3 | 219 ₹25,404 Lowest | 250 ₹29,000 |
| 5.00 | Cement concrete 1:4:8 (one cement, four sand and Eight aggregate) using 40mm gauge hand broken granite stone jelly for foundation including dewatering if found necessary and laid in layers of not more than 15 cm thick and compacted, etc., complete complying with standard specification. | 20 | M3 | 5,962 ₹1,19,240 Lowest | 6,000 ₹1,20,000 |
| 6.00 | Centering with steel centering for revertment, drain and culvert upto 1.20m depth using MS sheet of size 0.9 x0.6m 10 gauge thick and stiffened with MS 'L' angle wood runners of size 0.075 x 0.05 three rows with support by casurina pulleys 0.075 cm at 0.45 m length including cost of nails etc., | 338 | M2 | 534 ₹1,80,492 Lowest | 550 ₹1,85,900 |
| 7.00 | Plain Cement concrete 1:3:6 (one cement, two sand and four aggregate ) using 20mm gauge hard broken granite stone jelly for All RCC items of work excluding centering, shuttering, and cost of reinforcement grill but including curing finishing etc., complete fixtures in CC works wherever necessary as directed by departmental officer etc., complete. | 58 | M³ | 6,721 ₹3,89,818 Lowest | 6,800 ₹3,94,400 |
| 8.00 | Plastering with cement mortar 1:5(one cement and five sand) 12mm thick in all floors complying with standard specifications. | 72 | M2 | 309 ₹22,248 Lowest | 320 ₹23,040 |
| 9.00 | Centering with steel shutters including studding with sides and support etc., for drain as per the direction of departmental officers etc., complete | 9 | M2 | 1,180 ₹10,620 Lowest | 1,200 ₹10,800 |
| 10.00 | Supply and fabrication of R.T.S. rods in various dia including cutting bending placing in position and tying as per the direction of departmental officers. | 2 | Qtl | 9,542 ₹19,084 Lowest | 9,600 ₹19,200 |
Tender Value
₹10 L
EMD Value
₹10,000
Closing Date
18 Dec 2025, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
The Assistant Commissioner,
North Zone, Coimbatore Corporation, Balasundaram Road,Oppsite Womens Polytechnic
Reconstruction of storm water drain at Sivananthapuram 2nd street 3rd cross road in ward no 11, North Zone.
2025_MAWS_631250_17
E6/NorthZone/2025-26
Open Tender
Civil Works
Works
90 days
North Zone, Coimbatore Corporation
As per the tender condition attached
4 documents required · 4 mandatory
₹0
₹10,000
22 Oct 2026
12 Dec 2025
19 Dec 2025
12 Dec 2025
18 Dec 2025
12 Dec 2025
Dismantling damaged RCC slab etc. complete as per direction of departmental officers etc. completed.
Desilting the existing storm water drain etc. complete as per direction of departmental officers etc. completed.
Dismantling damaged plain cement concrete etc. complete as per direction of departmental officers etc. completed.
Earth work Excavation in all soild with initial lead and lift etc., complete for drain
Cement concrete 1:4:8 (one cement, four sand and Eight aggregate) using 40mm gauge hand broken granite stone jelly for foundation including dewatering if found necessary and laid in layers of not more than 15 cm thick and compacted, etc., complete complying with standard specification.
Centering with steel centering for revertment, drain and culvert upto 1.20m depth using MS sheet of size 0.9 x0.6m 10 gauge thick and stiffened with MS 'L' angle wood runners of size 0.075 x 0.05 three rows with support by casurina pulleys 0.075 cm at 0.45 m length including cost of nails etc.,
Plain Cement concrete 1:3:6 (one cement, two sand and four aggregate ) using 20mm gauge hard broken granite stone jelly for All RCC items of work excluding centering, shuttering, and cost of reinforcement grill but including curing finishing etc., complete fixtures in CC works wherever necessary as directed by departmental officer etc., complete.
Plastering with cement mortar 1:5(one cement and five sand) 12mm thick in all floors complying with standard specifications.
Centering with steel shutters including studding with sides and support etc., for drain as per the direction of departmental officers etc., complete
Supply and fabrication of R.T.S. rods in various dia including cutting bending placing in position and tying as per the direction of departmental officers.
Reinforced cement concrete of 1:1.5:3 mix (one cement, one and half of sand and three of aggregate) using Machine crushed hard broken granite stone jelly 20mm for RCC works in all types of foundation footings columns, Floor beams, slabs of all shapes (excluding cost of providing centering and fabrication of reinforcements which shall be measured and paid under separate items but including curing Etc. and including fixing fan clamps or hooks, after lying of electrical canduit pipes, junction boxes wherever required complete, complying with standard specificaions as directed by the engineer.
Supplying and fixing of SFRC man hole cover complete complying with standard specification.
Plain Cement concrete 1:2:4 (one cement, two sand and four aggregate ) using 20mm gauge hard broken granite stone jelly for All RCC items of work excluding centering, shuttering, and cost of reinforcement grill but including curing finishing etc., complete fixtures in CC works wherever necessary as directed by departmental officer etc., complete.
Conveyance of excavated earth from the site 5Km lead including loading and unloading etc completed
Add :- GST @ 18%
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.43 MB
BOQ_755749.xls
BOQ • 0.28 MB
ITBE6.pdf
Additional Documents • 0.05 MB
NITE6-SWD.pdf
Tender Documents • 0.41 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .