Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance S F NO 472 C3 VINAYAGA GARDEN SUKKALIYUR KARUR 639 003 | KARUR | KARUR | TAMIL NADU | 639003 | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
Tender Value
Refer Docs
EMD Value
₹5,000
Closing Date
16 Mar 2023, 3:00 pmClosed
SE / Tirupur EDC / TANGEDCO
The Superintending Engineer TANGEDCO TEDC Tirupur 3rd Floor KRBS Tower 208 650 Mettupalayam Bus Stop Perumanallur Road Tirupur 641602 Tamil Nadu
Survey Supply Erection Testing and Commissioning of 11 KV Three Phase Aerial Bunched XLPE Insulated Aluminium Cable of Size 3X95 1X95 sq mm with accessories for Shifting of Metering Location at Dharapuram Road in Town East Tirupur Section of Tirupur
2023_EB_292151_1
WOT-125 / 2022-23, Dt. 02.03.2023
Open Tender
Electrical Works
Works
52 days
GH Tirupur
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹5,000
Yes
21 Mar 2023
2 Mar 2023
17 Mar 2023
2 Mar 2023
16 Mar 2023
2 Mar 2023
2 Mar 2023 - 16 Mar 2023
Supply of 11 KV Three Phase Aerial Bunched Cable of size 3 X 95 + 1 X 95 sq mm
Supply of Cable Straight Through Joint Kit suitable for 95 sq. mm
Supply of T Jointing Kit
Supply of End Termination Kit
Supply of Suspension Clamp Assembly including Pole Clamps
Supply of Dead End Clamp / Anchor Clamp Assembly including Brackets, Pole Clamps
Supply of End Caps
Supply of Spiral Earth Electrodes
Supply of Grounding Connection for Messenger Wire
Supply of Anchor Sleeve for Messenger Wire
Labour Charges for Erection of 11 KV Three Phase Aerial Bunched Cable of size 3 X 95 + 1 X 95 sq mm
Labour Charges for Erection of Cable Straight Through Joint Kit suitable for 95 sq. mm
Labour Charges for Erection of T Jointing Kit
Labour Charges for Erection of End Termination Kit
Labour Charges for Erection of Suspension Clamp Assembly including Pole Clamps
Labour Charges for Erection of Dead End Clamp / Anchor Clamp Assembly including Brackets, Pole Clamps
Labour Charges for Erection of End Caps
Labour Charges for Erection of Spiral Earth Electrodes
Labour Charges for Erection of Grounding Connection for Messenger Wire
Labour Charges for Erection of Anchor Sleeve for Messenger Wire
Excavation & backfilling of pole pit for pole above 8.00 m length by using JCB / manual
Erection of RCC, REC, PSC pole above 8.00 m length by using crane / manual
Erection of metal support above 9 m / RSJ / rail pole / tubular pole
Earthing of pole with GI wires 4 or 6 SWG by coil earthing
Mass concreting of pole with 1:4:8 mix using 40 mm jally including curing (material + labour)
Excavation & backfilling of stay pit of 4.5 to 5 feet depth using JCB / Manual
Erection of stay set complete with fixing up stay wire Eye, Bow, Guy Shackle, Binding etc.
Stay concreting with 1:4:8 mix using 40 mm jally including curing (material + labour)
Fixing of HT LAS (3 Nos.)
Fixing of HT / LT TI fitting
Fixing of V cross arm 5.5 feet
Fixing of tapping channel cross arm
Fixing of HT disc 11 KV
Fixing of 33 KV porcelain pin insulator with pin or polymer composite pin insulator
Paving and stringing of conductor of 7/4.09 mm ACSR or other equivalent conductor (for Route Length per Phase)
Dismantling of HT / LT TI fitting
Dismantling of tapping channel cross arm
Dismantling of HT pin insulator with pin 11 KV
Dismantling of HT disc 11 KV with metal parts
Dismantling of conductor of size 7/4.09 mm including transporting the conductors to the nearest road side and stocking in coils
Labour Charges for Testing & Commissioning of Complete Line
SUB TOTAL (Items 1 to 41)
EPF @ 13.00 % (Items 11 to 41)
ESI @ 3.25 % (Items 11 to 41)
Nagul Power Developers
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .