| # | Company | Status |
|---|---|---|
| 1 | Accepted-Technical NA | Accepted-Technical Accepted |
| 2 | Accepted-Technical | Accepted-Technical Accepted |
| 3 | Accepted-Technical | Accepted-Technical Accepted |
| 4 | Accepted-Technical | Accepted-Technical Accepted |
| 5 | Accepted-Technical VILL BHARWALIYA POST DEVAPAR DISST BASTI | Accepted-Technical Accepted |
Tender Value
₹2.1 Cr
EMD Value
₹12.8 L
Closing Date
3 Feb 2026, 12:00 pmClosed
Dy Director Construction
Dy Director Construction Basti
NOUGARH MANDI INTERNAL C.C. ROAD AND EXTERNAL R.C.C.NALA CONSTRUCTION WORK
2025_RKUMP_1093918_1
82
Open Tender
Civil Works
Percentage
180 days
NOUGARH MANDI INTERNAL C.C. ROAD AND EXTERNAL R.C.
Please refer Tender documents.
2 documents required · 2 mandatory
₹29,500
Dy Director Construction Basti
₹12.8 L
Yes
12 Feb 2026
3 Jan 2026
3 Feb 2026
3 Jan 2026
3 Feb 2026
3 Jan 2026
Providing and laying 7.50 cm compacted thickness of stone aggregate of specific sizes 22.4-53 mm of water bound macadam specification incluiding spreading in uniform thickness hand packing rolling with smooth wheel roller 80-100 Kn in stage to proper grade and camber applying and brooming stone dust to fill-up the interstices of coarse brooming stone dust to fill-up the interstices of coarse aggregate watering and compacting to the required dencity grading-3 as per technical Speicification clause 405 including cost of material, roller, cartage, loading, unloading, labour and all taxes complete or as per direction of Engineer in charge.
C.C. (1:1.5:3) with cement C. Sand stone grit in road slab including of cost all material labour T&P etc. complete required for proper comp. of work S.I. No. 279
Extra providing and mixing hardening compound of approved quality as per manufacturers specification in cement concrete.(2018)
Mild steel or iron work in plain work such as reinforced concrete or reinforced brick work (When not included in and an over all rates) brought to required shape as necessary including bending for proper completion of the work and excluding the supply of steel and its wastage Bend, hooks and authorized over lapping shall be measured upto floor to level. SI NO 504
(Item No. 01 To 07) The routine maintenance of above road work Including earthen shoulder, and bitumenous pavement etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years. (including cost of material T&P labour but excluding GST) for 1st year maintenance cost @ 0.00%
(Item No. 01 To 07) The routine maintenance of above road work Including earthen shoulder, and bitumenous pavement etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years. (including cost of material T&P labour but excluding GST) for 2nd year maintenance cost @ 0.25%
(Item No. 01 To 07) The routine maintenance of above road work Including earthen shoulder, and bitumenous pavement etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years. (including cost of material T&P labour but excluding GST) for 3rd year maintenance cost @ 0.50%
(Item No. 01 To 07) The routine maintenance of above road work Including earthen shoulder, and bitumenous pavement etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years. (including cost of material T&P labour but excluding GST) for 4th year maintenance cost @ 0.75%
(Item No. 01 To 07) The routine maintenance of above road work Including earthen shoulder, and bitumenous pavement etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years. (including cost of material T&P labour but excluding GST) for 5th year maintenance cost @ 1.00%
tech_bid_open.pdf
tech_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 5.14 MB
BOQ_2035185.xls
BOQ • 0.24 MB
T2.pdf
Tender Documents • 5.12 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .