| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.7 CrAccepted-AOC PLOT NO 63 PAHADIYAN DISTRICT VARANASI UTTAR PRADESH | VARANASI | UTTAR PRADESH | 221001 | ₹4.7 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹4.8 Cr+₹15.9 L (3.40%)Rejected-AOC M0 NO 211 AWAS VIKAS COLONY POLICE STATION KOTWALI KATRA TEHSIL SADAR DISTRICT MIRZAPUR | ₹4.8 Cr+₹15.9 L (3.40%) | L2 | Rejected-AOC L2 |
| 3 | L3₹4.9 Cr+₹19.3 L (4.11%)Rejected-AOC | ₹4.9 Cr+₹19.3 L (4.11%) | L3 | Rejected-AOC L3 |
| 4 | L4₹4.9 Cr+₹23.0 L (4.90%)Rejected-AOC CHANDAULI | UTTAR PRADESH | 221009 | ₹4.9 Cr+₹23.0 L (4.90%) | L4 | Rejected-AOC L4 |
| 5 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹5.7 Cr
EMD Value
₹11.5 L
Closing Date
23 Jan 2023, 2:00 pmClosed
S. E. Irrigation Construction Circle, Varanasi
Superintending Engineer, Irrigation Construction Circle, Varanasi
Bank Strengthening And Counter Berm Construction Of Mardah Distributory Between Km. 0.000 To Km. 32.200 In District Ghazipur
2023_UPIDC_767328_3
04/SE/2022-23
Open Tender
Civil Works
Item Rate
210 days
Mardah
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,714
₹11.5 L
18 Mar 2023
17 Jan 2023
23 Jan 2023
17 Jan 2023
23 Jan 2023
17 Jan 2023
Amount
Earth work in excavation/ bed cutting of canal all type of soil including excavation, and proper disposal and dressing as directed by Engineer-in-charge.
Providing & Layaing C.C. 1:4:8 in foundation with Cement, Stone Ballast size 20 to 40 mm and Coarse Sand F.M. not less than 2, with all lead- lift including cost of all materials, labourers, T&P etc. required for proper completion of work.
Providing and laying of C.C. (1:3:6) with coarse sand of F.M more than 2.2 and 4.75 mm to 10 mm size hard stone grit from dalla quarry including cost of all labour, material and T&P, royalty, Taxes etc. required for proper completion of work.
Providing and laying of C.C. (1:2:4) in canal with coarse sand of F.M more than 2.2 and 4.75 mm to 20 mm size hard stone grit from dalla quarry including cost of all labour, material and T&P, royalty, Taxes etc. required for proper completion of work.
Ist class brick work in 1:4 C.M. with Coarse sand and Class 150 bricks above F.M. 2.00 with all lead-lift including cost of all materials, labourers, T&P etc. required for proper completion of work.
Cement Pointing in Cement Mortar 1:2 with Cement, Coarse Sand F.M. not less than 2 with all lead-lift including cost of all materials, labourers, T&P etc. required for proper completion of work.
Laying & fixing R.C.C. pipe 150 mm dia (including cost of pipe) with all lead- lift including cost of all materials, labourers, T&P etc. required for proper completion of work.
Preparation of subgrade before laying of C.C. in Silting Bed Bar & profile bar excluding cost of earth work.including cost of all materials, labourers, T&P etc. required for proper completion of work.
Centering and shuttering for CC work including cost of all labour, material and T&P for proper completion of work.
Dismantling brick work in cement mortar including stacking of materials as directed by engineer in-charge within a distance of 60M
Dismantling reinforced cement concrete 1:2:4 including stacking of dismantled materials as directed by engineer in-charge within a distance of 60M
Dismantling 1:4:8 cement concrete 150 mm thickness including cost of all materials, labourers, T&P etc. required for proper completion of work.
Earth work across canal for making road diversion by J.C.B/porclain machine in all types of soil including all lead - lift labourers and T&P, etc.required for proper completion of work.
E/W in excavation in foundation with all lead lift and all types of soil for wet earth including all cost of labour and T&P etc.
Centering and shuttering for R.C.C. work including cost of all materials, labour and T&P etc.
Supplying, Cutting, bending, binding and placing in position mild steel Reinforcement as per Drawing provided with all lead-lift including cost of all materials, labourers, T&P etc. required for proper completion of work.
R.C.C. in 1:1.5:3 with Cement, Dalla grit size 10 to 20 mm and Coarse Sand F.M. not less than 2 with all lead-lift including cost of all materials, labourers, T&P etc. required for proper completion of work.
R.C.C. in 1:1.5:3 with Cement, Dalla grit size 4.75 to 10 mm and Coarse Sand F.M. not less than 2 in floor with dala grit with all lead-lift including cost of all materials, labourers, T&P etc. required for proper completion of work.
supply and fixing of wheel guard as per direction of site incharge
Finishing walls of textured extirior paint with required shade including materials curing and cost of all materials.
Writing chainage of v.r.b at downstream side of slab including cost of all materials, labourers, T&P etc. required for proper completion of work.
Earth Work in Strengthening of both bank/embankment in canal in all types of soil including Manual compaction lead & lift upto 1 km truck or tractor trolly measured from axis to CG of barrow area., T&P etc. completion of work.
Earth Work in Counter Berm/Back Berm in canal in all types of soil including Manual compaction lead & lift upto 1 km truck or tractor trolly measured from axis to CG of barrow area., T&P etc. completion of work.
M/S BADRI SINGH
M/S OM PRAKASH PANDEY
ARVIND KUMAR SINGH
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .