| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.0 CrAccepted-AOC | ₹1.0 Cr | L1 | Accepted-AOC Accepted-Finance |
| 2 | L2₹1.0 CrRejected-Finance | ₹1.0 Cr | L2 | Rejected-Finance Not Lowest |
| 3 | L3₹1.0 CrRejected-Finance GRAM PARSIYA AHIR DEORIA | ₹1.0 Cr | L3 | Rejected-Finance Not Lowest |
Tender Value
₹1.4 Cr
EMD Value
₹8.8 L
Closing Date
20 Mar 2026, 12:00 pmClosed
Superintending Engineer Deoria Circle PWD Deoria
Office of the Superintending Engineer Deoria Circle PWD Deoria
Janpad Deoria me Vikas Khand Salempur sonbarsa me Omprakash babu ke jamin se Swargiy Laxmikant Chaturvedi Purv Deoria Nagar Palika Adhyaksh Jansangh ke puri Colony se hote hue katai vir Baba ke samne Sampark colony durgesh Tiwari ke Ghar tak Sampark
2026_CEGKP_1123100_11
968/76yat-Deo Circle/26 Dated 28.02.2026
Open Tender
Civil Works
365 days
Deoria
Please refer Tender documents.
3 documents required · 3 mandatory
₹2,714
₹8.8 L
Deoria
4 Jun 2026
12 Mar 2026
20 Mar 2026
12 Mar 2026
20 Mar 2026
12 Mar 2026
18 Mar 2026
Construction of embankment with approved material obtained from borrow pits (With 1 km Cartage) with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per Technical Specification Clause 301.5 (Excluding GST)
Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per MORD Technical Speicification Clause 401 (Excluding GST)
Providing, laying, spreading and compacting stone aggregates of 22.4-53mm size to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with three wheel 80-100 kN static roller in stages to proper grade and camber, applying and brooming, screening Type-B to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 3 as per Technical Specification Clause 405. (Excluding GST)
Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse and fine aggregates conforming to IS:383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with shovels, rakes, compacted using needle, screed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant, dowel bars, near approaches to bridge/culvert and construction joints, admixtures as approved, curing of concrete slabs for 14-days, (Excluding GST)
(Construction of subgrade and Earthen shoulders) Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 (Excluding GST)
Maintenance of Constructed Road for next Five Year after completion of work Shall be paid as per G.O. No. 17/2024/सा०-113/23-1-2024-23-1099-113/2023 लोक निर्माण अनुभाग- 1दिनांक 16.01.2024 एवं कार्यालय प्रमुख अभियन्ता यातायात वर्ग लो०नि०वि० लखनऊ का पत्रांक-3689-ओ०पी०आर०एम०सी०/मूल-23-24 दिनांक 17;02;2024 Payment Shall be done as per satisfaction of engineer in charge regarding maintenance work carried out by contractor (Including Labour Cess but GST will paid Extra as applicable.) 1st Year Maintenance cost total construction of cost item No. 1 to 5 Rs,. 13161724.00 @ Zero Percent & for 2nd year @ 0.25%
Maintenance Charge for Third Year@ 0.50%
Maintenance Charge for Fourth Year@ 0.75%
Maintenance Charge for Fifth Year@ 1 %
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 16.52 MB
Tendernotice_2.pdf
PDF • 6.15 MB
BOQ_2094841.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid