Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹4.4 LAccepted-Finance | 1 | Accepted-Finance 1 | |
| 2 | 2₹4.5 L+₹8,491.50 (1.92%)Rejected-Finance | 2 | Rejected-Finance 2 |
| Sl No | Description | Qty | Unit | Ravi kumar contractor L1 | M/S BHASKAR SHARMA CONTRACTOR L2 |
|---|---|---|---|---|---|
| 1.00 | Earth Work in Silt Clearance including Lift upto 1.5 M and Lead upto 30 M including Ramming and Dressing by Manual Labour. The earth from clearance to be used in side embankment or to be disposed off at spoil banks or as directed by Engineer-in-Charge. | 3,374 | Cum | 62 ₹2,09,188 Lowest | 63 ₹2,12,562 |
| 2.00 | Earth Work in Silt Clearance including Lift upto 1.5 M and Lead upto 200 M including Ramming and Dressing by Manual Labour. The earth from clearance to be used in side embankment or to be disposed off at spoil banks or as directed by Engineer-in-Charge. | 221 | Cum | 145 ₹32,045 Lowest | 147 ₹32,487 |
| 3.00 | Scraping internal section of existing channel slope with silt up to 5cm. complete all as directed by Engineer in Charge. | 38,785 | Sqm. | 4.5 ₹1,74,532.5 Lowest | 4.6 ₹1,78,411 |
| 4.00 | V.R.B. or bridge clearance during silt clearance work. complete all as directed by Engineer in Charge. | 16 | Nos. | 300 ₹4,800 Lowest | 300 ₹4,800 Lowest |
| 5.00 | Finishing walls two coat with waterproofing cement paint of approved make on old surface including cost of all materials, labour including curing of work of work and directed by Engineer-in-charge. | 170 | Sqm. | 55 ₹9,350 Lowest | 56 ₹9,520 |
| 6.00 | Printing Latters upto 10 CM Hight including Material.complete as specified or as directed by Engineer-in-charge. | 262 | Nos. | 10 ₹2,620 Lowest | 12 ₹3,144 |
| 7.00 | Painting gauge incuding cost of Material up to 25 cm. width complete as specified or as directed by Engineer-in-charge. | 5 | RM. | 150 ₹750 Lowest | 150 ₹750 Lowest |
| 8.00 | Ist class brick work in Superstructur in 1:4 cement mortar using coarse sand including cost of all materials, labour, T&P, curing, taxes etc involved for proper completion of work complete as specified or as directed by Engineer-in-charge. | 1 | Cum | 5,200 ₹5,200 Lowest | 5,200 ₹5,200 Lowest |
| 9.00 | 12 mm thick Cement plaster with 1:4 Cement course sand mortar complete as specified or as directed by Engineer-in-charge. | 20 | Sqm. | 180 ₹3,600 Lowest | 185 ₹3,700 |
Tender Value
₹4.5 L
EMD Value
₹9,000
Closing Date
12 Oct 2026, 9:00 amClosed
Executive Engineer
UMBDGC KHURJA
Silt Clearence of Minors
2026_UPIDC_1187133_30
06/EE/2026-27
Open Tender
Civil Works
Item Rate
20 days
UMBDGC KHURJA
Please refer Tender documents.
2 documents required · 2 mandatory
₹677
₹9,000
16 Oct 2026
7 Oct 2026
12 Oct 2026
7 Oct 2026
12 Oct 2026
7 Oct 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth Work in Silt Clearance including Lift upto 1.5 M and Lead upto 30 M including Ramming and Dressing by Manual Labour. The earth from clearance to be used in side embankment or to be disposed off at spoil banks or as directed by Engineer-in-Charge. | 3,374 | Cum | - | - |
| 2 | Earth Work in Silt Clearance including Lift upto 1.5 M and Lead upto 200 M including Ramming and Dressing by Manual Labour. The earth from clearance to be used in side embankment or to be disposed off at spoil banks or as directed by Engineer-in-Charge. | 221 | Cum | - | - |
| 3 | Scraping internal section of existing channel slope with silt up to 5cm. complete all as directed by Engineer in Charge. | 38,785 | Sqm. | - | - |
| 4 | V.R.B. or bridge clearance during silt clearance work. complete all as directed by Engineer in Charge. | 16 | Nos. | - | - |
| 5 | Finishing walls two coat with waterproofing cement paint of approved make on old surface including cost of all materials, labour including curing of work of work and directed by Engineer-in-charge. | 170 | Sqm. | - | - |
| 6 | Printing Latters upto 10 CM Hight including Material.complete as specified or as directed by Engineer-in-charge. | 262 | Nos. | - | - |
| 7 | Painting gauge incuding cost of Material up to 25 cm. width complete as specified or as directed by Engineer-in-charge. | 5 | RM. | - | - |
| 8 | Ist class brick work in Superstructur in 1:4 cement mortar using coarse sand including cost of all materials, labour, T&P, curing, taxes etc involved for proper completion of work complete as specified or as directed by Engineer-in-charge. | 1 | Cum | - | - |
| 9 | 12 mm thick Cement plaster with 1:4 Cement course sand mortar complete as specified or as directed by Engineer-in-charge. | 20 | Sqm. | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.15 MB
C05.pdf
Additional Documents • 0.18 MB
BOQ_2253135.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .