Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.1 LAccepted-AOC | ₹3.1 L | L1 | Accepted-AOC L1 |
| 2 | L2₹3.3 L+₹14,070.65 (4.49%)Rejected-Finance | ₹3.3 L+₹14,070.65 (4.49%) | L2 | Rejected-Finance L2 |
| 3 | L3₹3.4 L+₹26,785.45 (8.54%)Rejected-Finance | ₹3.4 L+₹26,785.45 (8.54%) | L3 | Rejected-Finance L3 |
| Sl No | Description | Qty | Unit | RUPESH ENTERPRISES AND CONSTRUCTION L2 | MOHD IMRAN CONTRACTOR L1 | M/S SUBHASH CHAND CONTRACTOR L3 |
|---|---|---|---|---|---|---|
| 1.00 | Earth work in excavation in foundation in ordinary soil with wet earth & disposal within 30 M. | 98.9 | cum | 210 ₹20,769 | 92.95 ₹9,192.76 | 41 ₹4,054.9 Lowest |
| 2.00 | Cement concrete in 1:3:6 (M-10) including all cost of material, labour , T&P etc. for completion of work. | 7.9 | cum | 4,800 ₹37,920 | 4,580.6 ₹36,186.74 Lowest | 5,221 ₹41,245.9 |
| 3.00 | Cement concrete in 1:2:4 (M-15) including all cost of material, labour , T&P etc. for completion of work. | 10.7 | cum | 5,100 ₹54,570 | 5,019.8 ₹53,711.86 Lowest | 6,051 ₹64,745.7 |
| 4.00 | First class brick work in 1:4 C.M. including all cost of material, labour and T&P etc. for proper completion of work. | 22.3 | cum | 5,100 ₹1,13,730 | 4,531.4 ₹1,01,050.22 Lowest | 5,151 ₹1,14,867.3 |
| 5.00Centering & Shuttering including all cost of material, labour and T&P etc. for proper completion of work. | ||||||
| 5.01 | For CC work | 67 | sqm | 200 ₹13,400 Lowest | 205.78 ₹13,787.26 | 251 ₹16,817 |
| 5.02 | For RCC work | 48.9 | sqm | 380 ₹18,582 Lowest | 390.92 ₹19,115.99 | 551 ₹26,943.9 |
| 6.00 | Cement concrete with stone ballast in R.C.C. 1:1.5:3 (M-20) including all cost of material, labour , T&P etc. for completion of work. | 5.1 | cum | 5,700 ₹29,070 Lowest | 5,824.2 ₹29,703.42 | 6,151 ₹31,370.1 |
| 7.00 | Supply and laying steel reinforcemet with cutting, binding, & placing includign cost of binding wire, steel, labour and T&P etc. complete. | 0.1 | MT | 60,000 ₹6,000 Lowest | 66,992.4 ₹6,699.24 | 71,151 ₹7,115.1 |
| 8.00 | Providing and fixing 150 mm (6'') dia PVC pipe outlet i/c cost of all material, labour, T&P etc for completion of work. | 68 | RM | 370 ₹25,160 Lowest | 498.3 ₹33,884.4 | 421 ₹28,628 |
Tender Value
₹3.7 L
EMD Value
₹8,000
Closing Date
16 Feb 2026, 2:00 pmClosed
Executive Engineer
M.G.C.C.D.-7 Bijnor
construction of 10 no. outlet km. 0.000 to km. 4.900 left and right bank of Bhartra Mr.. (lLot-04)
2026_UPIDC_1113144_8
03/EE/2025-26
Open Tender
Civil Works - Canal
Item Rate
sambhal
Please refer Tender documents.
3 documents required · 3 mandatory
₹854
₹8,000
15 May 2026
9 Feb 2026
17 Feb 2026
9 Feb 2026
16 Feb 2026
9 Feb 2026
Earth work in excavation in foundation in ordinary soil with wet earth & disposal within 30 M.
Cement concrete in 1:3:6 (M-10) including all cost of material, labour , T&P etc. for completion of work.
Cement concrete in 1:2:4 (M-15) including all cost of material, labour , T&P etc. for completion of work.
First class brick work in 1:4 C.M. including all cost of material, labour and T&P etc. for proper completion of work.
Centering & Shuttering including all cost of material, labour and T&P etc. for proper completion of work.
For CC work
For RCC work
Cement concrete with stone ballast in R.C.C. 1:1.5:3 (M-20) including all cost of material, labour , T&P etc. for completion of work.
Supply and laying steel reinforcemet with cutting, binding, & placing includign cost of binding wire, steel, labour and T&P etc. complete.
Providing and fixing 150 mm (6'') dia PVC pipe outlet i/c cost of all material, labour, T&P etc for completion of work.
Providing and fixing 125 mm (5'') dia PVC pipe outlet i/c cost of all material, labour, T&P etc for completion of work.
Providing and fixing 75 mm (3'') dia PVC pipe outlet i/c cost of all material, labour, T&P etc for completion of work.
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.61 MB
Tendernotice_2.pdf
PDF • 1.00 MB
lot4.pdf
Tender Documents • 0.99 MB
BOQ_2060541.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .