Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹31.6 LAccepted-Finance | ₹31.6 L | L1 | Accepted-Finance Ok |
| 2 | L2₹31.6 LAccepted-Finance | ₹31.6 L | L2 | Accepted-Finance Ok |
Tender Value
₹31.6 L
EMD Value
₹63,150
Closing Date
9 Apr 2026, 12:00 pmClosed
Executive Engineer RED Auraiya
Office of the Executive Engineer RED Auraiya
Repair work of room no. 18 to room no. 22 and Physics laboratory of Shri Janta Inter College in Ajitmal development block of Auraiya district.
2026_REDUP_1133065_1
1652/RED/Account/Tender No/25-26 Dt 09.03.2026
Open Tender
Civil Works
90 days
Auraiya
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,715
₹63,150
29 Apr 2026
4 Apr 2026
9 Apr 2026
4 Apr 2026
9 Apr 2026
4 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1 | Dismantling of R.C.C. work manually by machenical means including Stacking of steel bars and disposalof unserviceability material with in 50 meter lead as per engineer incharge. Chapter-17- S.I.-15.3 | - | CUM | - | - | BI01010001010000000000000515BI0100001113 |
| 2 | First class work in 1:4 cement and core sand of 1.25 F.M mortar in Superstructer including supply of all materials, labour and T&P etc. required for proper completion of work. As per Sor chapt. 6 SI NO. 305 (NS) | - | CUM | - | - | BI01010001010000000000000515BI0100001113 |
| 3 | Dismantling Doors, Window and clerestory window (steel and wood) Shutter including chaukhats , architrrave, holdfast etc. complete and stacking with in 50 meter lead of area beyond 3 sqm | - | SQM | - | - | BI01010001010000000000000515BI0100001113 |
| 4 | Raking out joints in lime or cement mortar and preparing the surface for re-pointing or replastering, including disposal of rubbish to the dumping ground, all complete as per direction
of Engineer-in-Charge.14.17 | - | SQM | - | - | BI01010001010000000000000515BI0100001113 |
| 5 | 12mm Cement plaster with cement mortar in proportion of 1:4 cement & coarse sand of single coat for interior plastering upto floor two level including internal rounded angles chamfers, and rounded angles not exceeding 80mm in girth and finished even and smooth. | - | SQM | - | - | BI01010001010000000000000515BI0100001113 |
| 6 | 6mm Celling plaster 1:3 (1 cement : 3 Coarse sand) cement & fine sand in F.M. not less than 1.25, 1:3 including chiping of RCC surface before ceiling plaster. The cost of including all material, labour T&P and scafolding etc. complete. | - | SQM | - | - | BI01010001010000000000000515BI0100001113 |
| 7 | Providing and Applying white cement based putty average thickness of 1 mm of approved brand over the plasterd wall surface.as per Chap-15 S.I. no-SOR no. 13.80 | - | SQM | - | - | BI01010001010000000000000515BI0100001113 |
| 8 | Wall Painting with plastic emulsion paint of approved brand an manfacture to give an even shade: two or more coats on new works. Chapter-15 (13.60.1) | - | SQM | - | - | BI01010001010000000000000515BI0100001113 |
| 9 | 4.00 cm thick 1:2:4 plain cement concrete floor with cement, aproved coare sand and 2 cm graded approved stone laid in panels finished with 3 mm flooring coat of neat cement or cement and marble dust in 5:1 as specified over & including 8 cm thick base concrete consisting of cement, local sand and brick ballast 4 cm gauge in the proportion of 1:4:8 and removing any over lappign mortar at the joints of panels if any and giving them a uniform finish including supply of all materials, labour and T&P etc. required for proper comletion of the work. S.I.(601-601(A)+665) | - | SQM | - | - | BI01010001010000000000000515BI0100001113 |
| 10 | R.C.C Work with cement approved coarse sand and 2 cm gauge approved stone ballast in the proportion of 1:1½:3 in slab excluding supply of reinforcement and its binding but including its fixing and binding the same with 24 B,W.G.G.I binding wire and including necessary cretering & shuttering etc. and also including supply of all material labour and T&P etc. required for proper completion of the work. binding wire cost being included in the items. As per Sor Chapt No. 5 SI No. 284 NS | - | CUM | - | - | BI01010001010000000000000515BI0100001113 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.75 MB
SBD.pdf
Tender Documents • 2.20 MB
BOQ_2115054.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid