| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹49,440Accepted-Finance | L1 | Accepted-Finance BID LOWEST | |
| 2 | L2₹50,050+₹610 (1.23%)Accepted-Finance | L2 | Accepted-Finance BID MORE THEN LOWEST | |
| 3 | L3₹54,700+₹5,260 (10.6%)Accepted-Finance | L3 | Accepted-Finance BID MORE THEN LOWEST |
Tender Value
Refer Docs
Closing Date
7 Mar 2022, 12:00 pmClosed
EXECUTIVE ENGINEER
400 KV SS DIVISION ORAI JALAUN
Cable laying Ferruling Termination work in 220KV Bus bar Protection Relay And 220KV Isolator MOM Box of 220KV Bus A B AND C AT 400KV SS ORAI UNDER E400KV SS Division Orai
2022_UPTCL_675203_2
ETS-06/E400KVSSD-(O)/2021-22
Open Tender
Electrical Works
Lump-sum
30 days
400 KV SUBSTATION BHADREKHI ORAI
Please refer Tender documents.
2 documents required · 2 mandatory
₹590
Yes
Executive Engineer 400 kv S/S Division Orai
Yes
7 Mar 2022
26 Feb 2022
7 Mar 2022
26 Feb 2022
7 Mar 2022
26 Feb 2022
Amount
Details of Work. - Cable laying, Ferruling, Termination work in 220KV Bus bar Protection Relay & 220KV Isolator MOM Box of 220KV Bus-A,B&C AT 400KV S/S ORAI UNDER E400KV S/S Division, Orai.
Laying of 4 core armoued control cable from 202 bay (transfer bus coupler bay) isolator 89A ,89B, 89C to AC BMK (installed at this bay) including opening of cable from cable drum and shifting of cable from open store to 400 kv switchyard & laying of cable in cable trench and keep at cable rack after opening of trench cover & cover the cable trench from trench cover after the completion of work.(Approx trench length-100 mtr.)
Laying of 10 and 2 core armoued control cable from 202 bay (transfer bus coupler bay) AC BMK (installed at this bay) to 220 KV bus bar protection relay panel including opening of cable from cable drum and shifting of cable from open store to 400 kv switchyard & laying of cable in cable trench and keep at cable rack after opening of trench cover & cover the cable trench from trench cover after the completion of work .(Approx trench length-170 mtr.)
Removel of 4 core cable insulation and armouring from control cable after that fixing of cable gland, ferruling with address, lugging in control cable and termination on both side terminal block of master MOM isolator box of 89A, 89B, 89C of 201,202,203,204,205 and AC BMK installed at above mentioned respective each bay.All material likes cable gland ,ferrules with addressing, lugs, cable tie will arranged by the contactor and all further necessary works and drilling required for necessary holes inside MOM box will completed by contactor.
Removal of 10 & 2 core cable insulation and armouring from control cable after that fixing of cable gland, ferruling with address, lugging in control cable and termination on both side terminal block of AC BMK, installed at 201,202,203,204,205 bay and inside 220 KV bus bar protection relay as per relay drawing. All material like cable gland , ferrules with addressing , lugs, cable tie will arranged by the contactor and all further necessary works and drilling required for necessary holes inside MOM box will completed by contactor.
Removing of 4 core cable insulation and armouring after that fixing of cable gland , ferruing , lugging and termination on terminal block of master MOM isolator box of 89A & 89B of 209 bus coupler bay and inside 220 KV bus bar protection relay as per relay drawing. All material like cable gland , ferrules with address , lugs, cable tie will arranged by the contactor and all further necessary works and required holes inside MOM box will completed by contactor.
Rates qouted by the bidders shall be without taxes. Taxes applicable if any to paid extra
bundelkhand Traders
MOHAMMAD ARIF
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .