| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.1 LAccepted-Finance 00 HAIDARPUR JAMALPUR ROAD SADAR JAUNPUR UTTAR PRADESH 222001 | JAUNPUR | UTTAR PRADESH | 222001 | L1 | Accepted-Finance LOWEST RATE | |
| 2 | L2₹4.1 L+₹412.77 (0.10%)Rejected-Finance VILL TANDA MAJRA 1 BLOCK TEH BUDHANA DISTT MUZAFFARNAGAR | BUDHANA | MUZAFFARNAGAR | UTTAR PRADESH | L2 | Rejected-Finance HIGHER RATE | |
| 3 | L3₹4.1 L+₹619.16 (0.15%)Rejected-Finance | L3 | Rejected-Finance HIGHER RATE |
Tender Value
₹4.1 L
EMD Value
₹41,277
Closing Date
24 Jul 2026, 4:00 pmClosed
EO NAGAR PANCHAYAT BUDHANA
NAGAR PANCHAYAT BUDHANA
NAGAR PANCHAYAT BUDHANA ME SAMAST WARDO ME SADAK NALI VA PULIYA KI MARAMAT KA KARYA
2026_DOLBU_1168640_2
241/NPBUDHANA/2026-27
Open Tender
Civil Works
Percentage
90 days
NAGAR PANCHAYAT BUDHANA
Please refer Tender documents.
2 documents required · 2 mandatory
₹975
EO NAGAR PANCHAYAT BUDHANA
₹41,277
27 Jul 2026
13 Jul 2026
24 Jul 2026
13 Jul 2026
24 Jul 2026
13 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in cutting or in embankment in ordinary soil excavation to be in the form of regular pits not exceeding 0.50 M. in depth and earth work in embankment to be in 20 cm. layers including remming and dressing the surface to required levels and slopes and also including 1.50 M. lift and 30M. lead.The earth from cutting to be used in making embankment or to be deposited as spoil banks with-in 30 M.distance as directed by the Engineer incharge.(Royality removed by Govt.) for small works/Abadi area.(where machine can not move) S.I. 253a+261b+231a | 57.96 | m3 | 282.5 | ₹16,373.7 |
| 2 | Cement Concrete with 4 cm gauge Brick Ballast,Fine sand & cement in the proportion of (12:6:1) including supply of all materials,labour,Tools & plants etc.required for proper completion of the work. Asper S.I. No. 273 | 11.76 | m3 | 2,985 | ₹35,103.6 |
| 3 | M-150 Brick Work in (1:4) with cement and coarse sand mortar in including supply of all materials labour,Tools & plants etc. required for proper completion of the work as per S.I.No.305 (a) | 4.44 | m3 | 4,690 | ₹20,823.6 |
| 4 | 12 mm thick plaster with cement and coarse sand in (1:4) over brick work minimum thickness not to be less than 1cm. including supply of all materials, labour, tools & plants etc. required for proper completion of the work. S.I. No. 584(a) | 45.36 | m2 | 160 | ₹7,257.6 |
| 5 | Cement Concrete with 4 cm gauge approved stone grit, coarse sand & cement in the proportion of (4:2:1) including supply of all materials, labour, Tools & plants etc. required for proper completion of the work. S.I. No. 279(a) | 0.64 | m3 | 5,750 | ₹3,680 |
| 6 | Providing, laying, spreading and compacting stone aggregates of specific sizes 22.4 to 53 mm water bound macadam specification including spreading in uniform thickness, hand packing, rolling with three wheel 80-100 kN static roller in stages to proper grade and camber,applying and brooming , stone screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading-3 as per Technical specification Clause-405. | 18.22 | m3 | 3,275.7 | ₹59,683.25 |
| 7 | R.C.C. Work with cement,approved coarse sand & 2 cm gauge approved stone grit in proportions of (1:1.5:3) in slab excluding supply of reinforcement and its bending,but including its fixing and binding the same with 24 B.W.G.G.I.binding wire and including necessary centering and shuttering etc. and supply of all materials, labour, Tools & plants etc.required for proper completion of the work including cost of binding wire. Asper S.I. No. 284(a) | 2.19 | m3 | 7,400 | ₹16,206 |
| 8 | M.S. (tor steel or plain) in Plain work such as R.C.C. or R.B. work including bending for proper shape and including supply of steel & its wastage,bend,hooks, and authorised over lapping shall be measured and including cost of binding wire.S.I.No. 504 As per Analysis with SAIL TOR STEEL ATES | 1.73 | Qtl | 8,408 | ₹14,533.65 |
| 9 | Laying of interlocking tiles (labour only) Asper S.I. No. 10.3 New Item-17 | 103.5 | m2 | 85 | ₹8,797.5 |
| 10 | Supply and Fixing 80 mm thick ISI marked I shape mechanically compressed inter locking cement concrete paver Block manufactured by high pressured control vibration machine having plan dimention 200x(160+120) with minimum 5 mm thick toping of O.P. Cement mixed with 25 % marble powder. The compressive strength of concrete Paver Block shall not be less than 40 MPa and weight 4.50 kg per No. confirming to IS:15658 2006 including cost of material, labour, T & P | 89.7 | m2 | 883 | ₹79,205.1 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.74 MB
BOQ_2192481.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .