| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹15.6 LAdmitted-Finance | -21.51% | ₹15.6 L | L1 | Admitted-Finance |
| 2 | L2₹15.6 L+₹198.57 (0.01%)Admitted-Finance 1 298 GALI NO 6 SHIVAJI NAGAR NARELA DELHI 40 | CENTRAL | DELHI | 110002 | -21.50% | ₹15.6 L+₹198.57 (0.01%) | L2 | Admitted-Finance |
| 3 | L3₹15.7 L+₹10,325.73 (0.66%)Admitted-Finance 296 AGGARSEN NAGAR GROUND FLOOR SRI GANGANAGAR GANGA NAGAR 2840 335001 INDIA | GANGANAGAR | RAJASTHAN | 335001 | -20.99% | ₹15.7 L+₹10,325.73 (0.66%) | L3 | Admitted-Finance |
| 4 | L4₹15.9 L+₹33,955.78 (2.18%)Admitted-Finance | -19.80% | ₹15.9 L+₹33,955.78 (2.18%) | L4 | Admitted-Finance |
| 5 | L5₹16.5 L+₹87,371.59 (5.61%)Admitted-Finance | -17.11% | ₹16.5 L+₹87,371.59 (5.61%) | L5 | Admitted-Finance |
Tender Value
₹19.9 L
EMD Value
₹39,720
Closing Date
29 Jun 2026, 11:00 amClosed
Executive Engineer, PWD Dn Dausa
Office of the Executive Engineer, PWD Dn Dausa
REPAIR AND MAINTENANCE WORK IN DIC OFFICE BUILDING AT DAUSA
2026_CEPWD_571568_3
NIT 08/2026-27 EE PWD Dn Dausa
Open Tender
Civil Works - Buildings
Percentage
120 days
Under Jurisdiction of Dn. Dausa
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
Through Online E-Grass Challan office ID 11733
₹39,720
Yes
2 Jul 2026
27 Jun 2026
30 Jun 2026
27 Jun 2026
29 Jun 2026
27 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | PART - A : CIVIL WORK
Providing & fixing precast cement concrete coping 1 : 2 : 4 mix 50mm thick complete as per specification : | - | Sqm | 367 | - |
| - | Surface dressing of the ground including removing vegetation and inequalities not exceeding 15cm deep and disposal of rubbish lead up to 50 Mtr. and lift up to 1.5 Mtr. All kinds of soil. | - | Sqm | 9 | - |
| - | Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge. In cement mortar. | 1 | Cum | 538 | ₹537.46 |
| - | Providing and fixing calcium silicate perforated board false ceiling at all heights including providing and fixing of frame work made of special sections power pressed from M.S. sheet and galvanised in accordance with zinc coating of grade 350 as per IS : 277 and consisting of angle cleats of size 25mm wide x 1.6mm thick with flanges of 22mm and 37mm at 1200mm centre to centre one flange fixed to the ceiling with dash fastener 12.5mm diax40mm long with 6mm dia bolts to the angle hangers of 25x25x0.55mm of required length, and other end of angle hanger being fixed with nut and bolts to G.I. channels 45x15x0.9mm running at the rate of 1200mm centre to centre to which the ceiling section 0.5mm thick bottom wedge of 80mm with tapered flanges of 26mm each having clips of 10.5mm at 450mm centre to centre shall be fixed in a direction perpendicular to G.I. channel with connecting clips made out of 2.64mm diax230mm long G.I. wire at every junction including fixing the calcium silicate board with ceiling section and perimeter channels 0.5mm thick 27mm high having flanges of 20mm and 30mm long, the perimeter of ceiling fixed to wall/partition with the help of rawl plugs at 450mm centre to centre with 25mm long drive-all screws @ 230mm interval including jointing and fixing to a flush finish of tapered and square edges of the board with recommended filler, jointing tapes, finisher and two coats of primer suitable for board as per manufactures specification and also including the cost of making openings for light fittings, grills, diffusers, cutouts made with frame of perimeter channels suitably fixed all complete as per drawing and specification and direction of the Engineer in Charge but but excluding the cost of painting of thickness of calcium silicate board as below:- 8 mm thick | - | Sqm | 1,317 | - |
| - | Half brick masonry in Superstructure , above plinth level upto floor V level using bricks of designation 75 Cement mortar 1 : 6 (1 cement : 6 coarse sand) | 1 | Sqm | 526 | ₹525.47 |
| - | Brick work with F.P.S. bricks of class designation 75 in superstructure above plinth level upto floor V level in all shapes and sizes in : Cement mortar 1 : 6 (1 cement : 6 coarse sand) | - | Cum | 4,990 | - |
| - | Supplying and fixing in walls machine cut and polished stone shelves, tands and in CM 1:3 with machine cut edges. Kota stone 25 to 30mm thick. | 1 | Sqm | 609 | ₹608.39 |
| - | Providing & applying one coat of UV resistant polymer cement based waterproofing slurry coating of approved make and quality on concrete or plastered surface as per specifications including preparation of surface by cleaning brushing and dust removing, filling of cracks and making the surface leak proof by mixing one part of chemical with 2 parts of cement and 2 parts of water (covering area 1.86 Sq.M/Kg of chemical) including cost of cement, labour, tools & plant, scaffolding if necessary etc., complete as directed by Engineer in Charge.
Note: Undulations/cracks found on the surface should be rectified with Cement Motor before application and the same will be paid under relavent items. | - | Sqm | 244 | - |
| - | Providing and fixing 1st quality MAT & GLOSSY finished ceramic tile confirming to IS : 13755 and IS : 15622 colour such as white, grey, ivory, fume red brown, light green, light blue and other light shades in floors, steps, pillars etc. laid on a bed of neat cement slurry finished with flush pointing in the white cement mixed with pigment to match the shade of the tile complete (including the cost of cement mortar bed 1:4).Size 300mm x 450mm | - | Sqm | 809 | - |
| - | Providing and fixing 1st quality MAT finished ceremic tile size 300x300mm confirming to IS : 13755 and IS : 15622 colour such as white, grey, ivory, fume red brown, light green, light blue and other light shades in floors, steps, pillars etc. laid on a bed of neat cement slurry finished with flush pointing in the white cement mixed with pigment to match the shade of the tile complete (including the cost of cement mortar bed 1:4). | - | Sqm | 748 | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.03 MB
Tendernotice_2.pdf
PDF • 3.22 MB
Bid_DIC_Office_Building_Dausa.pdf
Tender Documents • 7.42 MB
BOQ_1017034.xls
BOQ • 0.39 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .