| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.6 LAdmitted-Finance | ₹6.6 L | L1 | Admitted-Finance |
| 2 | L2₹7.2 L+₹66,300 (10.1%)Admitted-Finance | ₹7.2 L+₹66,300 (10.1%) | L2 | Admitted-Finance |
| 3 | L3₹7.9 L+₹1.3 L (19.6%)Admitted-Finance | ₹7.9 L+₹1.3 L (19.6%) | L3 | Admitted-Finance |
| 4 | L4₹7.9 L+₹1.4 L (20.7%)Admitted-Finance | ₹7.9 L+₹1.4 L (20.7%) | L4 | Admitted-Finance |
| 5 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Others-EMD and Tender fee not uploaded by the bidder |
| Sl No | Description | Qty | Unit | Daya Krishan Raina L1 | M/S MALIK BROTHERS ELECTRICAL CONTRACTRO AND SUPPLIER L4 | M/S CLEAR SKY ELECTRICAL CONTRACTORS AND SUPPLIERS L2 | RIDHIAKSH ELECTRICAL CONTRACTORS L3 |
|---|---|---|---|---|---|---|---|
| 1.00Dismentling of 48 no poles from existing 11 kv line from Gai to Bhatta Dessa and re errection of these poles in LT network at 25kva substation Bhatta Dessa | |||||||
| 2.00 | 8 mtr. Long Pole(ST-410, SP15) (Dismentling and re errection) | 48 | No | 6,200 ₹2,97,600 Lowest | 15,000 ₹7,20,000 | 10,000 ₹4,80,000 | 8,000 ₹3,84,000 |
| 3.00 | SITC GI Mucky-Clamps for Shackle Insulators | 80 | Set | 160 ₹12,800 Lowest | 200 ₹16,000 | 170 ₹13,600 | 200 ₹16,000 |
| 4.00 | SITC 30 mm² ACSR Conductor | 7 | Km | 45,000 ₹3,15,000 | 5,000 ₹35,000 Lowest | 28,500 ₹1,99,500 | 50,000 ₹3,50,000 |
| 5.00 | SITC 16kN Shackle Insulators | 80 | Nos | 50 ₹4,000 | 50 ₹4,000 | 40 ₹3,200 Lowest | 60 ₹4,800 |
| 6.00 | SITC Nuts and Bolts. | 60 | Kg | 140 ₹8,400 | 150 ₹9,000 | 130 ₹7,800 Lowest | 160 ₹9,600 |
| 7.00 | Write back material such as angle ,Channel,Discs, Pin insulator with pins,Old conductor/G I Wire | 500 | Kg | 20 ₹10,000 | 10 ₹5,000 Lowest | 20 ₹10,000 | 15 ₹7,500 |
| 8.00 | SITC red oxide paint 2 coats | 25 | Ltr | 200 ₹5,000 | 100 ₹2,500 Lowest | 200 ₹5,000 | 250 ₹6,250 |
| 9.00 | SITC Aluminim paint 2 coats | 25 | Ltr | 200 ₹5,000 | 100 ₹2,500 Lowest | 200 ₹5,000 | 350 ₹8,750 |
Tender Value
₹8.5 L
EMD Value
₹17,000
Closing Date
13 Aug 2026, 4:00 pmClosed
XEN ED Doda
ED DODA
Dismentling and re errection of poles
2026_PDD_319771_1
ED Doda/JPDCL/43 of 2026-27
Open Tender
Electrical Works
Turn-key
60 days
ED DODA
Please refer Tender documents.
4 documents required · 4 mandatory
₹1,000
XEN ED-Doda
₹17,000
31 Aug 2026
6 Aug 2026
14 Aug 2026
6 Aug 2026
13 Aug 2026
6 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismentling of 48 no poles from existing 11 kv line from Gai to Bhatta Dessa and re errection of these poles in LT network at 25kva substation Bhatta Dessa | - | - | - | - |
| 2 | 8 mtr. Long Pole(ST-410, SP15) (Dismentling and re errection) | 48 | No | - | - |
| 3 | SITC GI Mucky-Clamps for Shackle Insulators | 80 | Set | - | - |
| 4 | SITC 30 mm² ACSR Conductor | 7 | Km | - | - |
| 5 | SITC 16kN Shackle Insulators | 80 | Nos | - | - |
| 6 | SITC Nuts and Bolts. | 60 | Kg | - | - |
| 7 | Write back material such as angle ,Channel,Discs, Pin insulator with pins,Old conductor/G I Wire | 500 | Kg | - | - |
| 8 | SITC red oxide paint 2 coats | 25 | Ltr | - | - |
| 9 | SITC Aluminim paint 2 coats | 25 | Ltr | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.29 MB
Tendernotice_2.pdf
PDF • 0.72 MB
Tendernotice_3.pdf
PDF • 7.52 MB
BOQ_1060221.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .