Tender Value
₹4.1 L
EMD Value
₹8,000
Closing Date
8 Oct 2022, 11:00 amClosed
RAHUL KUMAR GARG
POWER GRID CORPORATION OF INDIA LTD PLOT NO.4, UNIT-41, NILADRI VIHAR, CHANDRASHEKHARPUR, BHUBANESWAR-751021
Construction of Boundary wall at damaged portion of Substation Boundary at 400/220 KV RENGALI Sub-Station.
ODP/BB/C and M-2902/I-2232/RFx-5006003738/22-23
Limited
Civil Works – General
Works
Rengali, Angul
₹8,000
24 Dec 2022
23 Sept 2022
8 Oct 2022
23 Sept 2022
8 Oct 2022
23 Sept 2022
Demolishing brick work manually/ by mechanical means cautiously avoiding the propagation of cracks beyond to the disintegrated portion including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of :In cement mortar all complete as per EIC.
Demolishing stone rubble masonry manually/ by mechanical means cautiously avoiding the propagation of cracks beyond to the disintegrated portion including stacking of serviceable material and disposal of unserviceable material within 50 metres lead;In cement mortar all complete as per EIC.
Removing , re-fixing and strengthening of compound wall fencing of Barbed wire/Concertina or both upto 3 mtr height of wall as per standard procedures including re-fixing existing Y angles, accessories like GI staples,clips etc. with painting a coat of anti-corrosive bitumastic paint on structural angles and fencing wires/coils with surface prepartion all complete as per EIC.
Earth work in excavation by mechanical means (Hydraulic excavator) / manual means over areas (exceeding 30cm in depth. 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead upto 50m and lift upto 1.5m, disposed earth to be levelled and neatly dressed,all work complete as per the Instruction of Engineer-In-Charge. - All kinds of soil
Extra for additional lift of 1.5m or part thereof in (i) All kinds of soil
Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m. all complete as per the Instruction of Engineer-In-Charge.
Providing and laying in position cement concrete of specified grade including the cost of centering and shuttering - All work up to plinth level all complete. as per the Instruction of Engineer-In-Charge.:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources)
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level as per the Instruction of Engineer-In-Charge. : 1:2:4(1 cement : 2 coarse sand (zone-III) derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources)
Providing and laying cement concrete in retaining walls, return walls, walls (any thickness) including , coping etc., up to floor five level excluding the cost of centering, shuttering and finishing as per the Instruction of Engineer-In-Charge. : 1:2:4 (1 Cement : 2 coarse sand (zone-III) derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources)
Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources)
Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement :- All work as per the Instruction of Engineer-In-Charge. : 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III): 3 graded stone aggregate 20 mm nominal size)
Brick work with clay flyash F.P.S. (non modular) brick of class designation 7.5 in foundation and upto plinth level in :Cement mortar 1:6 (1 cement : 6 coarse sand) all complete as per direction of Engineer-in-charge
Brick work with clay flyash F.P.S. (non modular) brick of class designation 7.5 in superstructure above plinth level up to floor five level in Cement mortar 1:6 (1 cement : 6 coarse sand) :all work complete as per the Instruction of Engineer-InCharge
12 mm cement plaster of mix:1:6 (1 cement : 6 fine sand)
15 mm cement plaster of mix:1:6 (1 cement : 6 fine sand)
6 mm cement plaster of mix:1:3 (1 cement : 3 fine sand)
Centering and shuttering including strutting, propping etc. and removal of form work,all work complete as per the Instruction of Engineer-In-Charge. :Foundations, footings, bases for columns
Centering and shuttering including strutting, propping etc. and removal of form work,all work complete as per the Instruction of Engineer-In-Charge. : Lintels, beams, plinth beams, girders, bressumers and cantilevers
Centering and shuttering including strutting, propping etc. and removal of form work,all work complete as per the Instruction of Engineer-In-Charge. :Columns, piers, abutments, pillars, posts and struts,coping
Finishing walls with Acrylic Smooth exterior paint( weather proof)- APEX ULTIMA ASIAN PAINTS (Two or more coat ) of colour Grey,Blue, Brown, etc. of required shade with scrubbing , clean, preparing the surface over mist coat and priming coat of exterior primer(ASIANPAINTS) applied all complete as per instruction of EIC.
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete as per the Instruction of Engineer-InCharge:Thermo-Mechanically Treated bars(Fe-500D or more). (Note:Chairs,spacer,lapping etc deemed to be included.No extra payment shall consider)
Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a coat of anti-corrosive bitumastic paint of approved brand all complete. as per the Instruction of Engineer-In-Charge.
Carrriage of materials building rubbish by mechanical transport including loading,unloading and stacking of serviceable materials or disposal of unserviceable materials upto 01 KM all complete as per EIC.
: Civil Works Package - :
2 or More
JV (Joint Venture)
60 (Sixty) Days
Average annual turnover (in INR)
Details of Contract & Date
Tentative Completed date
Qualification
Ref/ Page No.
Ref/ Page No.
Ref/ Page No.
Ref/ Page No.
POWER GRID CORPORATION OF INDIA LIMITED,
Section
Clause No./ Page No.
Ref. and Page No.
Ref. and Page No.
Period in weeks (from the effective date of LOA)
Date of Retirement/ resignation from POWERGRID
Date of Retirement/ resignation from POWERGRID
Date of Retirement/ resignation from POWERGRID
60 (Sixty) Days
Name of the published index
Wholesale Price Index Number for ‘High Speed Diesel’ (Individual commodity) (monthly) (Base: 2004-05=100) as published by Office of Economic Advisor, Ministry of Commerce & Industry (www.eaindustry.nic.in).
Indian Labour Bureau, Shimla, Govt. of India (monthly) (Base: 2001 = 100) (www.labourbureau.nic.in)
Wholesale Price Index Number for ‘Ferrous Metals’ (Group Item) (monthly) (Base: 2004-05=100) as published by Office of Economic Advisor, Ministry of Commerce & Industry (www.eaindustry.nic.in).
Wholesale Price Index Number for High Speed Diesel’ (Individual commodity) (monthly) (Base: 2004-05=100) as published by Office of Economic Advisor, Ministry of Commerce & Industry (www.eaindustry.nic.in).
Indian Labour Bureau, Shimla, Govt. of India (monthly) (Base: 2001 = 100) (www.labourbureau.nic.in)
Wholesale Price Index Number for ‘Cement & Lime’ (Group Item) (monthly) (Base: 2004-05=100) as published by Office of Economic Advisor, Ministry of Commerce & Industry (www.eaindustry.nic.in).
Wholesale Price Index Number for ‘Structural Clay Products’ (Group Item) (monthly) (Base: 2004-05=100) as published by Office of Economic Advisor, Ministry of Commerce & Industry (www.eaindustry.nic.in).
JV (Joint Venture)
FALSE
We have enclosed a Bid Guarantee in original and one copy in the form of Bank Guarantee (Bank Guarantee No.-, dated DD-MM-YYYY issued from ) for a sum of Rupees /-, Valid for a period of Seven [07] calendar months from the date of opening of bids i.e. upto and inclusive of DD-MM-YYYY.
EMD DETAIL FORM
Bank Guarantee No.
Name of Issuing Bank :
Clause No 13.0, ITB, Section -II and cl. 3.0 SCC, Section-IV, Volume-I
Clause No.64.0, Conditions of Contract (GCC) & Clause 11.0, SCC
Clause No.14,Section GCC, Vol.-I ,Conditions of Contract & Clause 12.0 of SCC, Section-IV, Vol-I & Clause 33.0 of ITB, Volume-I
Clause No 10.0 of SCC, Volume-I
Clause No 11.0 of ITB,
Cl.No.45.0 & 46.0 Section. GCC, Vol. I, Conditions of Contract & Clause 8.0 of SCC, Volume- I
Clause No. 9.0 of SCC, Volume -I
Banks certified Cheque
Bank Guarantee
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html
01 Invitation for Bids (IFB)-Section-I.docx
docx • 0.16 MB
02 Instructions to bidders(ITB)-Section-II.docx
docx • 0.11 MB
03 Bid Data Sheets (BDS)-Section-III.doc
doc • 0.33 MB
03A ANNEX-D(BDS)-Undertaking for Authenticity.DOC
doc • 0.05 MB
04 Conditions of Contract Civil Works.pdf
pdf • 0.39 MB
04A GCC Civil Amendments I - IX.pdf
pdf • 1.46 MB
05 SCC-Section-V.docx
docx • 0.10 MB
06 ANNEXURE-I, II ,III & IV of SCC.docx
docx • 0.04 MB
07 ANNEX-D (SCC) SA 8000 2008.pdf
pdf • 0.16 MB
Drawing.pdf
pdf • 0.34 MB
SFQP.pdf
pdf • 1.62 MB
Technical Specification Civil.pdf
pdf • 2.30 MB
Thumbs.db
db • 0.11 MB
Attachment 20- Affidavit for self-certification.DOCX
docx • 0.02 MB
Attachment-26 Declaration regarding events encountered pursuant to ITB Clause 2-1.docx
docx • 0.03 MB
Attachment-27.doc
doc • 0.04 MB
Bill of Material.xlsx
xlsx • 0.07 MB
First Envelope and Bid Forms.xlsx
xlsx • 0.65 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .