Loading…
New: tenders and results on WhatsApp
New: Find tenders, results and companies on WhatsApp, by text or voice note
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹51.0 LAdmitted-Finance FLAT NO 101 2ND FLOOR RAGHAVENDRA RESIDENCY PLOT NO 1 2 3 SURVEY NO 27 PICKET SECUNDERABAD 500026 | HYDERABAD | TELANGANA | 500026 | L1 | Admitted-Finance | |
| 2 | L2₹54.1 L+₹3.1 L (6.08%)Admitted-Finance | L2 | Admitted-Finance | |
| 3 | L3₹54.5 L+₹3.5 L (6.86%)Admitted-Finance | L3 | Admitted-Finance | |
| 4 | L4₹55.5 L+₹4.5 L (8.89%)Admitted-Finance | L4 | Admitted-Finance | |
| 5 | L5₹56.5 L+₹5.6 L (10.9%)Admitted-Finance 2 4 136 4TH BLOCK LINGA REDDY MANSION OPP TARBUND SECUNDERABD TARBUND SECUNDERABAD TELANGANA 500009 | HYDERABAD | TELANGANA | 500009 | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | L and S ENTERPRISES L1 | omsai thermax engineers L5 | sandhya enterprises L2 | M/s. A&T Enterprises L3 | SRI SAI RAM ENTERPRISES L6 | Srinivash Engineers L4 | M Shyam Sunder L6 | sree venkateswara enterprises L7 |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | M&L dismantling and strip opening the pump including disconnecting the suction, delivery, vacuum pipe lines and coupling and removing it from its position carefully and transporting the same to the workshop for carryout necessary repairs and refixing the same in its original position after repairs including overhauling the pump set, renewal of gasket to pump, suction and delivery lines, gland packing, greasing nuts, bolts and washers, re-connecting up of the electric / water connections etc including testing and commissioning complete all as specified and directed for the capacities Pump capacity 100 HP. | 3 | JOB | 8,100 ₹24,300 | 10,500 ₹31,500 | 7,200 ₹21,600 | 8,000 ₹24,000 | 900 ₹2,700 Lowest | 9,000 ₹27,000 | 900 ₹2,700 Lowest | 9,100 ₹27,300 |
| 2.00 | All as per item No 1.00 of Pump capacity 120 HP to 180 HP.
Notes for item 1.00 & 2.00:-
(i) Expendable stores like cotton waste / cleaning materials, lubricants, gland packing etc., and transportation from site to work shop and back are deemed to be included in unit rate quoted.
(ii) Labour element is deemed to be included in unit rate quoted.
(iii) The make of existing pumps are Kirloskar/ Mather&platt
(iv) any additional parts required will be measured as supply only under this schedule below. | 4 | JOB | 6,300 ₹25,200 Lowest | 7,200 ₹28,800 | 6,300 ₹25,200 Lowest | 6,300 ₹25,200 Lowest | 6,300 ₹25,200 Lowest | 6,300 ₹25,200 Lowest | 6,300 ₹25,200 Lowest | 7,200 ₹28,800 |
| 3.01 | M&L Dismantling and strip opening the motor completely including disconnecting the cable connections and coupling of the motor removing the starter and rotor units, bearings complete servicing the motor assembly including cleaning the carbon deposits with carbon tetra chloride, greasing the bearings etc., heat varnishing the motor windings by applying varnish and keeping the windings into the hot air oven till the moisture evaporates complete at authorized workshop including transportation and refix the same after repairs and re-connecting up of the electric connections including testing and commissioning complete all as specified and directed for the following capacities:-
Motor 180 HP capacity, Make : Kirloskar / Crompton greaves (Location : Trishul line feeder) | 1 | JOB | 8,100 ₹8,100 | 9,000 ₹9,000 | 7,200 ₹7,200 Lowest | 8,000 ₹8,000 | 9,000 ₹9,000 | 9,000 ₹9,000 | 9,000 ₹9,000 | 9,000 ₹9,000 |
| 3.02 | Motor 150 HP capacity, Make : Kirloskar / Crompton greaves, (Location : trishul line feeder) | 1 | JOB | 7,200 ₹7,200 | 9,000 ₹9,000 | 7,200 ₹7,200 | 7,000 ₹7,000 Lowest | 8,000 ₹8,000 | 8,000 ₹8,000 | 8,000 ₹8,000 | 7,300 ₹7,300 |
| 3.03 | Motor 120/ 125 HP capacity, Make : Hindustan brown/ Kirloskar (Location : Trishul line Pump House) | 2 | JOB | 6,300 ₹12,600 | 7,200 ₹14,400 | 6,300 ₹12,600 | 6,000 ₹12,000 Lowest | 6,300 ₹12,600 | 7,000 ₹14,000 | 6,300 ₹12,600 | 6,400 ₹12,800 |
| 3.04 | Motor 100 HP capacity, Make : Hindustan brown/ Kirloskar (Location : Haig line Pump House) | 2 | JOB | 5,400 ₹10,800 Lowest | 6,300 ₹12,600 | 5,400 ₹10,800 Lowest | 5,400 ₹10,800 Lowest | 6,000 ₹12,000 | 5,600 ₹11,200 | 6,000 ₹12,000 | 5,500 ₹11,000 |
| 4.00 | M&L cutting and taking out the unserviceable / burnt out copper winding from the electric motor, preparation of the surface and rewinding the same with super enamelled copper conductor with ‘F’ class heavy grade insulation, weight and turns to achieve its full efficiency including tying the winding and connecting the coils and brining the connections as that of existing one including applying insulating varnish, heating and backing the windings thoroughly with necessary insulating materials complete all as specified for the capacities 100 HP to 180 HP | 200 | KG | 1,440 ₹2,88,000 Lowest | 1,800 ₹3,60,000 | 1,440 ₹2,88,000 Lowest | 1,600 ₹3,20,000 | 2,000 ₹4,00,000 | 1,450 ₹2,90,000 | 2,000 ₹4,00,000 | 1,650 ₹3,30,000 |
| 5.01 | M&L renewal of worn out / unserviceable ball bearings from the induction motor with the same size and capacity for the following motors :-
SKF Ball bearing No.6318- 2z for Electric motor of capacity 180HP, 3 Phase.
Make : Kirloskar and equivalent | 2 | EACH | 6,840 ₹13,680 | 7,200 ₹14,400 | 6,300 ₹12,600 Lowest | 6,840 ₹13,680 | 7,000 ₹14,000 | 7,000 ₹14,000 | 7,000 ₹14,000 | 7,000 ₹14,000 |
| 5.02 | SKF Ball bearing No 6316 -2z for Electric motor of capacity 150HP
3 Phase. Kirloskar and equivalent | 1 | EACH | 6,300 ₹6,300 | 6,300 ₹6,300 | 6,300 ₹6,300 | 6,300 ₹6,300 | 6,300 ₹6,300 | 6,000 ₹6,000 Lowest | 6,300 ₹6,300 | 6,500 ₹6,500 |
| 5.03 | SKF Ball bearing No 6315 - 2z for Electric motor of capacity 120/ 125 HP, 3 Phase.
Make : Hindustan Brown Breware and equivalent. | 1 | EACH | 5,400 ₹5,400 | 5,480 ₹5,480 | 5,400 ₹5,400 | 6,000 ₹6,000 | 6,000 ₹6,000 | 5,000 ₹5,000 Lowest | 6,000 ₹6,000 | 5,500 ₹5,500 |
Tender Value
₹49 L
EMD Value
₹98,000
Closing Date
21 Sept 2026, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
GE (UTILITY) SECUNDERABAD
GE UTILITY SECUNDERABAD MUDFORT SECUNDERABAD-500003
REPAIR/ MAINT OF DOL STARTER, THREE PHASE STARTER, CONTRACTOR, SWITCH GEAR, MOTOR REWINDING, PUMPS, CENTRIFUGAL PUMP BOREWELL REDEVELOPING UNDER ZONE 1A AND 1B AREA UNDER AGE EM I OF GE(U) SECUNDERABAD.
2026_MES_787051_1
GE (U)/SEC/TOKEN/M27 OF 2026-27
Open Tender
Civil Works - Water Works
Item Rate
180 days
SECUNDERABAD
As per tender documents
8 documents required · 8 mandatory
₹500
GE (UTILITY) SECUNDERABAD
₹98,000
Yes
8 Oct 2026
31 Aug 2026
28 Sept 2026
31 Aug 2026
21 Sept 2026
14 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | M&L dismantling and strip opening the pump including disconnecting the suction, delivery, vacuum pipe lines and coupling and removing it from its position carefully and transporting the same to the workshop for carryout necessary repairs and refixing the same in its original position after repairs including overhauling the pump set, renewal of gasket to pump, suction and delivery lines, gland packing, greasing nuts, bolts and washers, re-connecting up of the electric / water connections etc including testing and commissioning complete all as specified and directed for the capacities Pump capacity 100 HP. | 3 | JOB | 99 | ₹297 |
| 2 | All as per item No 1.00 of Pump capacity 120 HP to 180 HP.
Notes for item 1.00 & 2.00:-
(i) Expendable stores like cotton waste / cleaning materials, lubricants, gland packing etc., and transportation from site to work shop and back are deemed to be included in unit rate quoted.
(ii) Labour element is deemed to be included in unit rate quoted.
(iii) The make of existing pumps are Kirloskar/ Mather&platt
(iv) any additional parts required will be measured as supply only under this schedule below. | 4 | JOB | 99 | ₹396 |
| 3.01 | M&L Dismantling and strip opening the motor completely including disconnecting the cable connections and coupling of the motor removing the starter and rotor units, bearings complete servicing the motor assembly including cleaning the carbon deposits with carbon tetra chloride, greasing the bearings etc., heat varnishing the motor windings by applying varnish and keeping the windings into the hot air oven till the moisture evaporates complete at authorized workshop including transportation and refix the same after repairs and re-connecting up of the electric connections including testing and commissioning complete all as specified and directed for the following capacities:-
Motor 180 HP capacity, Make : Kirloskar / Crompton greaves (Location : Trishul line feeder) | 1 | JOB | 99 | ₹99 |
| 3.02 | Motor 150 HP capacity, Make : Kirloskar / Crompton greaves, (Location : trishul line feeder) | 1 | JOB | 99 | ₹99 |
| 3.03 | Motor 120/ 125 HP capacity, Make : Hindustan brown/ Kirloskar (Location : Trishul line Pump House) | 2 | JOB | 99 | ₹198 |
| 3.04 | Motor 100 HP capacity, Make : Hindustan brown/ Kirloskar (Location : Haig line Pump House) | 2 | JOB | 99 | ₹198 |
| 4 | M&L cutting and taking out the unserviceable / burnt out copper winding from the electric motor, preparation of the surface and rewinding the same with super enamelled copper conductor with ‘F’ class heavy grade insulation, weight and turns to achieve its full efficiency including tying the winding and connecting the coils and brining the connections as that of existing one including applying insulating varnish, heating and backing the windings thoroughly with necessary insulating materials complete all as specified for the capacities 100 HP to 180 HP | 200 | KG | 99 | ₹19,800 |
| 5.01 | M&L renewal of worn out / unserviceable ball bearings from the induction motor with the same size and capacity for the following motors :-
SKF Ball bearing No.6318- 2z for Electric motor of capacity 180HP, 3 Phase.
Make : Kirloskar and equivalent | 2 | EACH | 99 | ₹198 |
| 5.02 | SKF Ball bearing No 6316 -2z for Electric motor of capacity 150HP
3 Phase. Kirloskar and equivalent | 1 | EACH | 99 | ₹99 |
| 5.03 | SKF Ball bearing No 6315 - 2z for Electric motor of capacity 120/ 125 HP, 3 Phase.
Make : Hindustan Brown Breware and equivalent. | 1 | EACH | 99 | ₹99 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.16 MB
TM27_8631_Tender.pdf
Tender Documents • 0.56 MB
BOQ_882032.xls
BOQ • 0.41 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .