| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹10.0 LAccepted-AOC DUMKA | JHARKHAND | 814101 | ₹10.0 L | L1 | Accepted-AOC L1 |
| 2 | L2₹10.0 LRejected-Finance | ₹10.0 L | L2 | Rejected-Finance L2 |
Tender Value
₹10.1 L
EMD Value
₹20,100
Closing Date
11 Jun 2026, 6:00 pmClosed
executive officer
nagar panchayat basukinath
Dewatering, Cleaning of Shivganga Talab and Construction of Shed at Shivganga Pid
2026_UDD_114866_1
UDHD/NPB/ETENDER/08/2026-27/02
Open Tender
Civil Works
Percentage
basukinath
Please refer Tender documents.
2 documents required · 2 mandatory
₹5,000
₹20,100
6 Jul 2026
6 Jun 2026
12 Jun 2026
6 Jun 2026
11 Jun 2026
6 Jun 2026
6 Jun 2026 - 11 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dewatering pump 10 hp (add 10% on
Basic rate for CP) | 288.68 | Hrs | 179.3 | ₹51,760.32 |
| 2 | earth work in bed clearance or desilting of canal carrying F.S discharge of 28 cum (1000cum) or more in dead course of river etc in ordinary soil and removing the excavated earth in proper profile in spoils etc with initila lead 30 m and lift 1.5 m as Per specification and direction of E/I | 2,156.44 | M3 | 150.34 | ₹3,24,199.19 |
| 3 | carriage of earth from pond to barrow area lead upto 1.5 KM | 2,156.44 | M3 | 112.76 | ₹2,43,160.17 |
| 4 | add GST 18% | 6,19,119 | PERCENTAGE | 18 | ₹1,11,44,142 |
| 5 | add LC 1% | 7,30,560 | PERCENTAGE | 1 | ₹7,30,560 |
| 6 | Structural steel work riveted, bolted or welded in build up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete.Vide For steel weight Calculation Chart - | 1,000 | KG | 109.3 | ₹1,09,300 |
| 7 | Providing and laying Cement Concrete in retaining wall , return wall, wall(any thichness) including attched pilasters, columns, piers, parapets,coping, bed blocks, anchor blocks, olain window sill, fillets, sunken floor etc, up to floor five level, excluding the cost of centering, shuttering and finishing 1:1.5:3 (cement : 1.5 coarse sand(zone-III) : graded stone aggregate 20 mm nomonal size) | 4.25 | M3 | 5,989.72 | ₹25,456.31 |
| 8 | Providing corrugated G.S. sheet roofing including vertical / curved surface fixed with polymer
coated J or L hooks, bolts and nuts 8 mm diameter with bitumen and G.I. limpet washers of with G.I. limpet washers filled with white lead, including a coat of approved steel primer and two coats of approved paint on overlapping of sheets complete (up to any pitch in horizontal/ vertical or curved surfaces), excluding the cost of purlins, rafters and trusses and including cutting to size and shape wherever required
12.1.3 0.63 mm thick with zinc coating not less than 275 gm/ m² | 100.19 | M2 | 886.46 | ₹88,814.43 |
| 9 | add GST 18% | 2,23,570 | PERCENTAGE | 18 | ₹40,24,260 |
| 10 | add LC 1% | 2,63,812 | PERCENTAGE | 1 | ₹2,63,812 |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_155352.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.56 MB
BOQ_155352.xls
BOQ • 0.38 MB
currgendumshiv2026.pdf
PDF • 0.17 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].