| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹19.0 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹20.0 L+₹1.0 L (5.33%)Rejected-Finance | L2 | Rejected-Finance Rejected |
Tender Value
₹19.0 L
EMD Value
₹18,980
Closing Date
18 Feb 2025, 3:00 pmClosed
Commissioner Madurai Corporation
Aringar Anna Maligai
Construction of storm water Drain arrangements and Road cross culvert at Manjalmettu mini colony in ward no. 58
2025_MAWS_521123_1
E7 / EST 877/ 24-25
Open Tender
Civil Works
Lump-sum
60 days
Madurai
Please refer Tender documents.
1 document required · 1 mandatory
₹0
₹18,980
21 May 2025
5 Feb 2025
18 Feb 2025
5 Feb 2025
18 Feb 2025
5 Feb 2025
Amount
Cutting the existing B.T Road surface.
Earth work excavation in all kinds of soils except hard rock requiring blasting, inclusive of shoring, strutting and baling out water wherever necessary refilling the sides of foundation with excavated earth in layers of 15cm thick well rammed and consolidated depositing the surplus earth within compound in places as shown by the deptl.officers, clearing and leveling the site with initial lead of 10M and lift of 2M etc.Comp.SI.No.62-rate for 10m3
Supplying and filling in foundation and basement with Quarry Dust in layers of 15Cm. thick well rammed and consolidated including watering complying with standard specification etc. complete
Plain Cement concrete 1:4:8 (one cement four sand and eight aggregates) Using 40mm gauge hard broken granite jelly for foundation inc. consolidation and dewatering for foundation wherever necessary etc.complete.)
Supplying and erecting shuttering with necessary supports for plith beam with all cross brancings etc..,complete(Rcc coloumn footing plinth beam and lintel sides)
Supplying erecting STEEL CENTERING for sides and soffits inc supports and strutting for plain surface such as reinforced cement concrete slasp rectangular beams tee or el beams lintels, bed blocks staircase in all floors of any height (the retrived materials should betaken back by the contractor) the payment for centering shall be given by the concrete is laid (Bottom only)
Plain Cement Concrete 1:2:4 (one cement, two fine aggregates and four coarse aggregates) using 20mm size ISS HBG metal including cost and conveyance of all materials to site and including for the mixing, laying and labour charges etc., complete as per standard specification
Reinforced cement concrete 1:1 1/2 :3 (One cement One and half sand and three aggregate) using 20mm machine broken gauge bard granite jelly for RCC worksthe rate excluding the cost of reinforcement grills,centering and shuttering etc., complete
Supplying fabricating and placing in position of MS grills for reinforcement rate inc. the cost of steel for all works (the rate to include cost of binding wire also). Below 16mm Dia (Buildg Dt 23-24, page-39)
Plastering with cement mortar (1:3) 20mm ,thick in all floors including cost and conveyance of all materilas to site and labour charges etc,complete as per standard specifications (S.I.306)
Reinforced Cement Concrete 1:2:4 (One Cement two sand and four aggregates) Using 20mm Gague hard broken granite jelly for foundation including consolidatiobn and dewatering for foundation wherever necessary etc.,
Add GST 18%
AR CONSTRUCTIONS (BID ID -1252588)
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .