Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹77,358.49Admitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance | ||
| 2 | L2₹79,905.47+₹2,546.99 (3.29%)Admitted-Fee/PreQual/Technical/Finance | L2 | Admitted-Fee/PreQual/Technical/Finance | ||
| 3 | L3₹81,693.36+₹4,334.87 (5.60%)Admitted-Fee/PreQual/Technical/Finance | L3 | Admitted-Fee/PreQual/Technical/Finance | ||
| 4 | L4₹82,172.79+₹4,814.31 (6.22%)Admitted-Fee/PreQual/Technical/Finance | L4 | Admitted-Fee/PreQual/Technical/Finance | ||
| 5 | L5₹82,702.17+₹5,343.68 (6.91%)Admitted-Fee/PreQual/Technical/Finance | L5 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹1 L
EMD Value
₹3,000
Closing Date
11 Jul 2026, 6:00 pmClosed
office of the executive engineer rew ang
office of the executive engineer rew ang
CONSTRUCTION OF LANE NEAR HOUSE OF YUSUF THOKER BLOCK BIJBEHARA
2026_RDPR_314693_5
ENIT48of2026-27
Open Tender
Civil Works
Percentage
30 days
anantnag
Please refer Tender documents.
2 documents required · 2 mandatory
₹200
office of the executive engineer rew ang
₹3,000
13 Jul 2026
6 Jul 2026
13 Jul 2026
6 Jul 2026
11 Jul 2026
6 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 0.0 | site clearance by way of removing vegetation muck etc cj | - | labs | - | - |
| 0.0 | p/l of stone solling tightly hand packed nallah stone boulders cj | - | Cum | - | - |
| 0.0 | P/L cement concrete of specified grade excluding the cost of centering & shuttering using M10 mix. (1:4:8) and by using 40 mm crushed aggregates. | - | Cum | - | - |
| 0.0 | p/l of 50mm thick cement concrete flooring (1:2:40 cj | 1 | sqm | 1 | ₹1 |
| 0.0 | centering and shuttering inc strutting and propping inc its removal | 1 | sqm | 1 | ₹1 |
| 0.0 | carriage of materials by M.T | - | - | - | - |
| 0.9 | Sand/Crushed stone aggregates, Lead = 15Km (STA). | 1 | cum | - | - |
| 0.0 | carriage of tiles etc by mt | - | trips | - | - |
| 0.0 | Provision for signboard & photographs and other unforeseens items (sta) | - | job | - | - |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.35 MB
BOQ_1019099.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .