Loading…
Loading…
Tender ID
Tender Value
₹4.1 Cr
EMD Value
₹3.6 L
Closing Date
16 Mar 2026, 3:00 pmClosed
No
No
Single Packet System
Normal Tender
No
Not Applicable
Lowest to Highest
60 days
Expenditure
Capital (Works)
ENGG1
2 conditions · 2 needing a document upload
As per Tender Document.
As per Tender Document.
7 conditions · 2 needing a document upload
As per Tender Document.
As per Tender Document.
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
KGBS - MD section: De-watering of RUB and cleaning of RUB including Rain Water Harvesting System at RUBs, Soak Pits, Cross drain pipe under CGM/JP unit
JP-EN-RUB-Dewater-2026-04
JP-EN-RUB-Dewater-2026-04
Open
Works - General
24 Months
Jaipur, Rajasthan
₹11,800
₹3.6 L
16 Mar 2026
24 Feb 2026
2 Mar 2026
8 items across 2 schedules · ₹4,13,94,036 total
| # | Description | Unit | Qty | Rate | Amount |
|---|---|---|---|---|---|
| 1 | 13030 - Cleaning out silt from bed reservoir/canals including 50m lead and lift to 1.5m. | of cum up | — | — | — |
| 2 | 211200/211201 - Hiring of machinery forminor miscellaneous works for short duration including operator/driver, fuel, lubricants and consumable. The contractor shall arrange statutory permits as required by rules and regulations prevailing in the area of work. Payment shall be made for actual working hours at site. JCB Backhoe Loaders 3DX Plus similar with minimum 1.10 cum bucket capacity. | Hour all or | 600.00 | 864.02 | 5,18,412 |
| 3 | NS/1 - Hiring and commissioning static/movable/ tractor operated diesel pump different capacity for dewatering accumulated water, including sufficient length of suction and delivery pipe. The rate includes cost of all labour, watch & work 24x7, T&P, C&P (except diesel) maintenance of pump etc. The rate also includes cost of x-ing track, nallaha, road or any other obstruction to be met with. Note: The pumps should be capable of pumping out silty/muddy water also. Nothing will be paid separately on account of dewatering muddy/silty water. (i) 20 HP Pump (Total Pumps required for a period of 3 months and pumps required for a period of 12 months) | of Month of of 70 5 | 540.00 | 41,222.17 | 2,22,59,971.8 |
| 4 | NS/2 - Extra for fuel consumption over NS/1 20 HP Pump (i.e. @ 3.5 Lit/Hr Diesel consumption) Pumping Hours of one pump 200 Hour in 3 months (Monsoon Period) (Pumping Hours during monsoon period 75*200= 15000 Pumping Hours of one pump 300 hour in remaing 9 months (Non Monsoon period) (Pumping Hours during non-monsoon period = 5*300= 1500 Total pumping hours required = 15000+1500=16500 | (i) Hour = = = | 33000.00 | 367.69 | 1,21,33,770 |
| Schedule total | ₹3,50,46,133.8 | ||||
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
TenderDocumentofDewatering2026.pdf Tender Document
ATTACHMENT
TenderDocumentofDewatering2026.pdf
ATTACHMENT
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .