Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical AT SATANALA P O BERUANBADI PS KODALA DIST GANJAM ODISHA PIN 761032 | GANJAM | ODISHA | 761032 | Admitted-Fee/PreQual/Technical |
| 2 | Admitted-Fee/PreQual/Technical | Admitted-Fee/PreQual/Technical |
| 3 | Admitted-Fee/PreQual/Technical VILL GUNJABALA PO BADAKHAIRAKHAMA PS KODALA DIST GANJAM PIN 761035 | KODALA | GANJAM | ODISHA | 761035 | Admitted-Fee/PreQual/Technical |
| 4 | Admitted-Fee/PreQual/Technical NEHRU NAGAR 7TH LANE BERHAMPUR GANJAM ODISHA 760003 | GANJAM | ODISHA | 760003 | Admitted-Fee/PreQual/Technical |
| 5 | Admitted-Fee/PreQual/Technical AT PARIKUL PO BUANL PS SADAR BALASORE DIST BALASORE ODISHA 756027 | BALASORE | BALASORE | ODISHA | 756027 | Admitted-Fee/PreQual/Technical |
Tender Value
₹1.6 Cr
EMD Value
₹1.6 L
Closing Date
22 Sept 2026, 5:30 pmClosed
Chief Construction Engineer
Southern Circle (RandB), Courtpeta, Berhampur
Construction of Tahasil Office Building at Purushottampur, Ganjam Buildings.
2026_EICCL_139896_1
CCE SC RandB BAM-04/2026-27
Open Tender
Civil Works - Buildings
Percentage
180 days
Purushottampur Ganjam
2 documents required · 2 mandatory
₹10,000
₹1.6 L
Yes
23 Sept 2026
1 Sept 2026
23 Sept 2026
1 Sept 2026
22 Sept 2026
1 Sept 2026
1 Sept 2026 - 21 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation of foundation in hard soil within 50 m linital lead and 1.50m initial lift including rough dressing breaking clods to maxikum 5cm to 7cm and laying in layers not exceeding 0.3M depth and as per OPWD Specification and direction of the Engineer-In-Charge. | 297.92 | cum | 282.89 | ₹84,278.59 |
| 2 | Filling in foundation trenches and plinth, with sand including laying the earth in layers not exceeding 23.5 cm thick ramming & watering with all leads & lifts including cost of all labour,T&P completed as per OPWD Specification and directed of the Engineer-In-charge. | 148.03 | cum | 530.9 | ₹78,589.13 |
| 3 | Providing and laying plain cement concrete of proportion (1:3:6) in foundation and floors using 4 cm. size black hard crusher broken granite stone metal and screened and washed sharp sand for mortar of approved quality and from approved quarry including hoisting, lowering, laying concrete, ramming, watering and curing etc. complete to required levels laid in layers not exceeding 15 cm. thick in each layer including cost, conveyance, royalties of all materials and cost of all labours,labour cess, T&P etc complete as per the OPWD Specification and direction of the Engineer-in-charge. | 58.86 | cum | 5,689.8 | ₹3,34,901.63 |
| 4 | Providing, lifting, hoisting and laying Reinforced cement concrete of M-25 grade as per approved designs and drawings having a minimum compressive strength (in work test) 25 Kg. / Square cm. in 15 cm. cubes at 28 days after mixing and test conducted in accordance with I.S. 516 using 12 mm. to 20 mm. size black hard crushed broken granite stone chips and screened and washed sharp sand for mortar of approved quality from approved quarry, washed and cleaned ( 20mm. size chips not to exceeds 25 %) to be mixed in concrete mixture with Portland slag cement (PSC) including hoisting, lowering, laying and compaction concrete by using vibrators, watering and curing for 28 days, centering and shuttering then after dismantling and removing debris from the work site and finishing the exposed surface smooth providing grooves or beads wherever necessary including cost, conveyance, loading, unloading, royalties and taxes of all materials and cost of all labours, sundries, T & P required of the work etc. complete in all respect as per OPWD specification & direction of Engineer-in-charge.. But excluding cost and conveyance of HYSD bar and binding wires and labour charges for straightening, cutting, bending etc. of HYSD Bar tying the grills and placing in proper position. - FOOTING | 45.59 | cum | 6,725.65 | ₹3,06,622.38 |
| 5 | Plinth Beam | 25.16 | cum | 7,232.94 | ₹1,81,980.77 |
| 6 | Column - Ground Floor | 18.87 | cum | 15,741.39 | ₹2,97,040.03 |
| 7 | First floor | 7.77 | cum | 17,817.65 | ₹1,38,443.14 |
| 8 | Second Floor | 2.39 | cum | 20,303.04 | ₹48,524.27 |
| 9 | Roof Beam - Ground Floor | 24.09 | cum | 15,741.39 | ₹3,79,210.09 |
| 10 | First floor | 22.21 | cum | 17,817.65 | ₹3,95,730.01 |
stage.html
html • 0.06 MB
tech_bid_open.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_2.pdf
PDF • 2.70 MB
Tendernotice_1.pdf
PDF • 1.53 MB
BOQ_607814.xls
BOQ • 0.49 MB
3rdCorrigendum4.pdf
PDF • 0.13 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .