Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 2 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 3 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 4 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 5 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
Refer Docs
Closing Date
4 Mar 2021, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer, WMDA
Wullar Manasbal Development Authority
Various additions/alteration/ up gradation of Manasbal Park.
2021_Tourm_118231_6
eNIT 08 of 2021
Open Tender
Civil Works
Item Rate
20 days
Manasbal
Please refer Tender documents.
2 documents required · 2 mandatory
₹600
Executive Engineer, WMDA
Exempted
5 Mar 2021
25 Feb 2021
5 Mar 2021
25 Feb 2021
4 Mar 2021
25 Feb 2021
120 days
Amount
Earthwork in excavation in foundation trenches or drains (not exceeding 1.5m in width as well as 10 Sqm on plan) including dressing of sides and ramming of bottom, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed.
Supplying/filling dry stone soling hand packed under foundations including all carriages up to the site of work.
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering: All work upto plinth level in 1:4:8 (1 cement: 4 coarse sand:8 graded crushed stone aggregate 40 mm nominal size).
Centering, shuttering including strutting, propping etc. and removal of form for slabs, footings, bases of columns etc.
Reinforcement for RCC work including straightening ,cutting ,bending placing in position & binding mild steel and medium tensile bars
Providing and laying in position Reinforced cement concrete of specified grade excluding the cost of centering and shuttering: 1:1.5:3 (1 cement: 1.5 coarse sand: 3 graded crushed stone aggregate 20 mm nominal size.
Providing and fixing Devri stone exposed face rough chiseled/dressed in stps in 1:6 cement mortar including pointing with 1:3 mix and pigment to match the shade complete.
Providing and fixing of ornamnetal fine chiseled Devri Stone Cap laid in cement mortar 1:3 mix of size 2' - 0" x 2' - 0"
Structural steel work welded in built up sections, trusses and framed work, including cutting, hoisting and fixing in position and applying priming coat of approved steel primer all complete including all carriages leads and lifts.
Dry Random Rubble masonry with hard stones from quarry in foundation/plinth exposed face chisel dressed including cost and carriage of materials.
Random Rubble masonry with hard stones from (quarry) in foundation/plinth in cement mortar 1:6 mix including pointing 1:3 mix cement mortar (exposed face chisel dressed) including cost and carriage of materials. Complete
Dry Random Rubble masonry with hard stones from (quarry) in foundation/plinth (hammer dressed). Complete
Random Rubble masonry with hard stones from (quarry) in foundation/plinth in cement mortar 1:6 mix (hammer dressed) complete
P/L Damp-proof course 50mm thick with cement conc. 1:2:4 (1 cement: 2 coarse sand: 4 grade stone agg. 20mm nominal size) using crushed aggregate including all carriages upto site of work complete.
Supplying and filling of sweet earth freee from clods and any other chemical substance and rolling with Power Road Roller including levelling, dressing and watering including cost and carriage of material (Complete job)
Providing and laying of green grass turfing of superior quality including required layer of good earth as directed by Engineer in charge including filling of joints with mixture of good earth and sand , watering and maintenance for 6 months or more till the grass forms smooth surface.
Supplying and filling of Nallah Boulders hand packed including cost and carriage of materials complete.
Filling of avaialble earth under channel Complete
STAR CONSRTUCTION
ZUHAIB SHAFI KUCHAY
MS WASEEM HAMID
IMTIYAZ AHMAD RATHER
stage.html
html • 0.02 MB
finance_227047.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .