Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.3 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹2.0 L+₹9,691.63 (5.00%)Rejected-Finance 496665 | RAIGARH | CHHATTISGARH | 496665 | L2 | Rejected-Finance L2 | |
| 3 | L3₹2.1 L+₹15,506.60 (8.00%)Rejected-Finance | L3 | Rejected-Finance L3 |
Tender Value
₹2.3 L
EMD Value
₹2,900
Closing Date
8 Mar 2024, 9:00 amClosed
PE EnM AKK OCP
OFFICE of PE EnM AKK OCP
A.Departmental estimate for work of Repairing Rewinding of 10 KVA 3.3 KV 6.6 KV 220 Volt Sl no PCN 778 19 lightning transformer in open cast mines in respect of Konar Exp OCP under BnK Area B.Repairing and replacement of safety glass rubber bead an
2024_CCL_303329_5
PE(EnM)/AKK OCP/e-tender/23-24/67
Open Tender
Electrical and Maintenance Works
Item Rate
8 days
OFFICE of PE EnM AKK OCP
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,900
9 Apr 2024
1 Mar 2024
9 Mar 2024
2 Mar 2024
8 Mar 2024
2 Mar 2024
2 Mar 2024 - 7 Mar 2024
Amount
Repairing/ Rewinding od 10 KVA 3.3KV-6.6 KV/220 Volt HT and LT limps of transformer by copper wire
Supply and providing of HT/LT Bushing with studs nut washershed etc as per sample.
Complete cleaning priming with paiting of transformer
Transformer oil filteration
Supervision incidental overhead expenses @ 15 %
repairing/replacement of safety glass 3 ft x 4 ft x 5no
replacement of rubber bead
replacement of rubber lock
supervision, incidental, overhead expenses @15%
Induction motor complete opening, fitting after overhauling cleaning & both and bearing greasing including complete motor set after rewinding/repairing its re setting commissioning with both bearing greasing.
Rotor shaft repairing by electrode welding, machining on bearing fitting place or sleeve making as per bearing size with rotor dynamic balancing.
After cleaning repairing re-setting of rotor by with breezing by silver rod, gas heating etc.
Complete motor coil varnishing heating insulation tapping of lead etc.
End cover housing (DE/NDE) repairing by CI electrode welding and machining as per bearing size
Replacement of old damaged bearing with new one both side DE/NDE (6313C-6315C-3)
Gas heating and cutting, grinding work of both end connection point strip bars with damaged bar dismantling.
Finishing with Epoxy paint (two or more coats) complete motor set and applied as per manufacturer's specifications including appropriate Priming coated.
Making of Fan cover as per sample
Supervision and incidental over head expenses cost & contractor profit @ 15%
Fabrication of steel ceiling rope 19 mm
Fabrication of clamp for ceiling steel rope 1/4"
Fabrication of steel ceiling rope 16 mm
Fabrication of clamp for ceiling steel rope 5/8"
Supervision labour charge for above work & overhead expense @ 15%
Total impact of GST for the purpose of CTC
SANTOSH KUMAR SINGH
CITY ELECTRICALS
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .