Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.2 LAccepted-AOC | L1 | Accepted-AOC Lowest | |
| 2 | L2₹7.4 L+₹21,360.18 (2.97%)Rejected-AOC 8 3 110 EDAPPADI KARUPATTI SALEM | SALEM | SALEM | TAMIL NADU | L2 | Rejected-AOC Highest | |
| 3 | L3₹7.6 L+₹39,363.06 (5.48%)Rejected-AOC | L3 | Rejected-AOC Highest |
| Sl No | Description | Qty | Unit | VPS Contractor L1 | P THANGAVEL L2 | S Murugesan L3 |
|---|---|---|---|---|---|---|
| 1.00Providing CC road from Vembaneri main road to SHG Building H/O Pudupalayam. | ||||||
| 2.00 | Earth work Excavation in all soils & Sub Soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting, Sectioning the street to lay concrete pavement per SS 20 A. | 12.04 | m3 | 130 ₹1,565.2 Lowest | 131 ₹1,577.24 | 130.57 ₹1,572.06 |
| 3.00 | Cement mortar 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete for 10 cum | 45.87 | m3 | 5,400 ₹2,47,698 Lowest | 5,500 ₹2,52,285 | 5,719.92 ₹2,62,372.73 |
| 4.00 | CENTERING BELOW GL: Supplying and erecting centering shuttering including necessary supports for plane surface in foundation and basement and in all floors for R C C column footing column plinth beam, beams, roof slabs, staircase steps, bed blocks, critical pier etc using mild steel sheets of size 90 x 60 cm and 10 guage stiffened, welded with mild steel angles of size 25mmx25mmx3mm for boarding laid over silver oak (country wood) scantlings of size 10cm x 6.5cm spaced of about 90cm centre to centre and supported by casurina props of 10cm to 13cm dia spaced at 75cm centre to centre complet | 177.36 | m2 | 510 ₹90,453.6 Lowest | 535 ₹94,887.6 | 542.03 ₹96,134.44 |
| 5.00 | cement concrete 1:2:4 mix using 20 mm ISS metal including cost and conveyance of all materials to site and labour charges for mixing, laying, and curing etc complete for 10 cum | 53.75 | m3 | 6,750 ₹3,62,812.5 Lowest | 7,000 ₹3,76,250 | 7,106.49 ₹3,81,973.84 |
| 6.00 | Collection and supply of gravel for filling from approved quarry including cost and conveyance of all materials to site including all labour charges for filling etc.complete, | 39.86 | m3 | 280.34 ₹11,174.35 | 260 ₹10,363.6 Lowest | 277.54 ₹11,062.74 |
| 7.00 | Supplying and fixing of Bitumen pad for expansion joints | 3.35 | m3 | 479 ₹1,604.65 | 470 ₹1,574.5 Lowest | 474.21 ₹1,588.6 |
| 8.00 | Provisionn for 110mm PVC Duct | 13.38 | 110mmDiaPVC Pipe6KSC | 197 ₹2,635.86 | 180 ₹2,408.4 Lowest | 194.83 ₹2,606.83 |
| 9.00 | Provisionn for 110mm PVC Duct | 6 | 110mmDiaPVC Endcap | 57 ₹342 | 50 ₹300 Lowest | 56.33 ₹337.98 |
Tender Value
Refer Docs
EMD Value
₹9,500
Closing Date
4 Sept 2025, 3:00 pmClosed
BDO Konganapuram
BDO Konganapuram Konganapuram, Idappadi TK Salem Dt
Providing CC road from Vembaneri main road to SHG Building H/O Pudhupalayam Konganapuram Block at salem District AGAMT - II -2025-26
2025_RDTN_598118_1
AGMT-1782/2024/T1-
Open Tender
Civil Works
Works
BDO Konganapuram
as per norms
2 documents required · 2 mandatory
₹0
₹9,500
30 Sept 2025
28 Aug 2025
4 Sept 2025
28 Aug 2025
4 Sept 2025
28 Aug 2025
28 Aug 2025 - 4 Sept 2025
Amount
Providing CC road from Vembaneri main road to SHG Building H/O Pudupalayam.
Earth work Excavation in all soils & Sub Soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting, Sectioning the street to lay concrete pavement per SS 20 A.
Cement mortar 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete for 10 cum
CENTERING BELOW GL: Supplying and erecting centering shuttering including necessary supports for plane surface in foundation and basement and in all floors for R C C column footing column plinth beam, beams, roof slabs, staircase steps, bed blocks, critical pier etc using mild steel sheets of size 90 x 60 cm and 10 guage stiffened, welded with mild steel angles of size 25mmx25mmx3mm for boarding laid over silver oak (country wood) scantlings of size 10cm x 6.5cm spaced of about 90cm centre to centre and supported by casurina props of 10cm to 13cm dia spaced at 75cm centre to centre complet
cement concrete 1:2:4 mix using 20 mm ISS metal including cost and conveyance of all materials to site and labour charges for mixing, laying, and curing etc complete for 10 cum
Collection and supply of gravel for filling from approved quarry including cost and conveyance of all materials to site including all labour charges for filling etc.complete,
Supplying and fixing of Bitumen pad for expansion joints
Provisionn for 110mm PVC Duct
Provisionn for 110mm PVC Duct
P THANGAVEL (BID ID -1444647)
S Murugesan (BID ID -1449376)
stage.html
html • 0.04 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .